CITY OF AUSTIN PUBLIC WORKS DEPARTMENT Zilker Park Multi-Modal Improvements January 25, 2022 CONNECTING YOU ALL AROUND AUSTIN Current Situation: Barton Springs Road No sidewalk. No pedestrian entry. Bike lane with flexible posts. City of Austin | Public Works Department 2 Current Situation: Stratford Drive No sidewalk on either side of the road. Dangerous curve, high numbers of cars City of Austin | Public Works Department 3 Current Situation: Bus Stops Three bus stops on Barton Springs Road are simply sign poles in the ground City of Austin | Public Works Department 4 Current Situation: Bus Stops Westbound stop across from William Barton Dr. City of Austin | Public Works Department 5 Current Situation: Bus Stops Three bus stops on Barton Springs Road are simply sign poles in the ground City of Austin | Public Works Department 6 Proposed Improvements: Shared-Use Path A shared-use path is an extra-wide sidewalk that can accommodate pedestrians, wheelchairs, bikes, strollers, etc. City of Austin | Public Works Department 7 Proposed Improvements: Bus Stops • Landing pad • Bench • Trash can • Sign City of Austin | Public Works Department 8 Project Partners • Public Works, Sidewalk Program • Quarter Cent Program (District 8) • Parks and Recreation Department • Austin Transportation Department, Bikeways • Cap Metro 9 Project Area Map 11 Questions Shelley Kilday Program Consultant, Public Works Department. Shelley.Kilday@austintexas.gov 10 Butler Landfill Maintenance Parks and Recreation Board Reynaldo Hernandez, PLA, Project Manager, Parks and Recreation Department Christine Chute Canul, Program Manager, Parks and Recreation Department January 25, 2022 1 Butler Landfill Site Boundary of Landfill 2 Butler Landfill Maintenance Area Revegetation Area 3 Acres Gravel Area 5 Acres Boundary of Landfill 8 ACRES 3 Existing Conditions Condition of gravel area Ruts and evidence of ponding on non vegetated area of landfill cap 4 Purpose of Required Maintenance Comply with requirements to protect existing landfill cap o maintain gravel area to address drainage and surface flow issues to prevent water infiltration o revegetate and protect the landfill cap in non gravel areas o install irrigation system in the revegetated areas o designate a strengthened circulation route within the revegetated area o monitor access by installing fencing and gates 5 Proposed Maintenance 3 Acres 5 Acres 6 Proposed Maintenance • Maintain existing gravel cover over cap, improve drainage by removing ponding areas and creating positive flow off the cap, approximately 5 acres • Add split rail fence along Stratford Drive with gates to control access to the site • Re-vegetate part of the site to the west, approximately 3 acres • Add revegetation/erosion control matt to define circulation pattern • Install irrigation system at the revegetated area with dedicated potable irrigation water meter 7 Permitting Requirements • TCEQ – Landfill Program: Authorization to Disturb the Final Cover Over a Closed Landfill Issued December 16, 2020. Valid for two (2) years • • TCEQ – Edwards Aquifer Protection Program: Proposed maintenance is considered Non-Regulated Activity per Title 30 Texas Administrative Code, 30 TAC 213.3(28) City of Austin: Maintenance projects do not require a permit 8 Timeline • Notice to Proceed for maintenance early spring 2022 • Complete maintenance improvements late spring / early summer 2022 Funding Sources Construction funding to be provided by C3 and PARD • • Operations and Maintenance funding to be provided by C3 and PARD 9 Thank You! Contact: Reynaldo Hernandez, Project Manager, Parks and Recreation Department reynaldo.hernandez@austintexas.gov 10