Parks and Recreation BoardJan. 25, 2022

Backup — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 10 pages

Butler Landfill Maintenance Parks and Recreation Board Reynaldo Hernandez, PLA, Project Manager, Parks and Recreation Department Christine Chute Canul, Program Manager, Parks and Recreation Department January 25, 2022 Butler Landfill Site Boundary of Landfill Butler Landfill Maintenance Area Revegetation Area 3 Acres Gravel Area 5 Acres Boundary of Landfill 8 ACRES Existing Conditions Condition of gravel area Ruts and evidence of ponding on non vegetated area of landfill cap Purpose of Required Maintenance Comply with requirements to protect existing landfill cap o maintain gravel area to address drainage and surface flow issues to prevent water infiltration o revegetate and protect the landfill cap in non gravel areas o install irrigation system in the revegetated areas o designate a strengthened circulation route within the revegetated area o monitor access by installing fencing and gates Proposed Maintenance 3 Acres 5 Acres Proposed Maintenance • Maintain existing gravel cover over cap, improve drainage by removing ponding areas and creating positive flow off the cap, approximately 5 acres • Add split rail fence along Stratford Drive with gates to control access to the site • Re-vegetate part of the site to the west, approximately 3 acres • Add revegetation/erosion control matt to define circulation pattern • Install irrigation system at the revegetated area with dedicated potable irrigation water meter Permitting Requirements • TCEQ – Landfill Program: Authorization to Disturb the Final Cover Over a Closed Landfill – Issued Tracking No. 25777058, 25485092, 25729544, /cn600135198/RN102761764 Issued December 16, 2020. Valid for two (2) years (Extension could be granted within 2 years if 20% of proposed improvements have been installed) Edwards Aquifer Protection Program: Proposed maintenance is considered Non-Regulated Activity per Title 30 Texas Administrative Code, 30 TAC 213.3(28) City of Austin: Maintenance projects do not require a permit • • Timeline • Notice to Proceed for maintenance early spring 2022 • Complete maintenance improvements late spring / early summer 2022 Funding Sources Construction funding to be provided by C3 and PARD • • Operations and Maintenance funding to be provided by C3 and PARD Thank You! Contact: Reynaldo Hernandez, Project Manager, Parks and Recreation Department Reynaldo.Hernandez@austintexas.gov