Environmental CommissionApril 15, 2020

20200415-006b: Ullrich Water Treatment Plant SPC-03-0005(R1) Recommendation — original pdf

Recommendation
Thumbnail of the first page of the PDF
Page 1 of 1 page

ENVIRONMENTAL COMMISSION MOTION 20200415 006b Date: April 15, 2020 RATIONALE: Subject: Albert H. Ullrich Water Treatment Plant, SPC-03-0005C(R1) Motion by: Kevin Ramberg Seconded by: Katie Coyne WHEREAS, the Environmental Commission recognizes the applicant is requesting a variance from LDC 25- 8-281 (C)(2)(b) to allow construction within the 150-foot buffer for a rimrock Critical Environmental Feature. WHEREAS, the Environmental Commission recognizes that staff recommend the variance without conditions having determined the findings of fact have been met. THEREFORE, the Environmental Commission recommends approval of the requested variance from LDC 25-8-281 (C)(2)(b) to allow construction within the 150-foot buffer for a rimrock Critical Environmental Feature with the following; Staff Conditions: None Environmental Commission Conditions: None VOTE 9-0 For: Smith, Nill, Neely, Gordon, Bedford, Ramberg, Guerrero, Coyne, and Maceo Against: None Abstain: None Recuse: None Absent: Creel, Thompson Approved By: Linda Guerrero, Environmental Commission Chair 1