Environmental CommissionApril 15, 2020

20200415-006c: Davis Water Treatment Plant SPC-2012-0414(R1) Recommendation — original pdf

Recommendation
Thumbnail of the first page of the PDF
Page 1 of 2 pages

ENVIRONMENTAL COMMISSION MOTION 20200415 006c Date: April 15, 2020 Subject: Davis Water Treatment Plant, SPC-2012-0414(R1) Motion by: Kevin Ramberg Seconded by: Katie Coyne RATIONALE: WHEREAS, the Environmental Commission recognizes the applicant is requesting a variance from LDC 25- 8-281 (C)(2)(b) to allow construction within the 150-foot buffer of Critical Environmental Features. WHEREAS, the Environmental Commission recognizes the applicant is requesting a variance from LDC 25- 8-341 to allow cut exceeding 4 feet, to 5.5 feet. WHEREAS, the Environmental Commission recognizes that staff recommend the variance without conditions having determined the findings of fact have been met. THEREFORE, the Environmental Commission recommends approval of the requested variances from LDC 25-8-281 (C)(2)(b) to allow construction within the 150-foot buffer of Critical Environmental Features and LDC 25-8-341 to allow cut to 5.5 feet with the following; Staff Conditions: None Environmental Commission Conditions: None VOTE 9-0 For: Smith, Nill, Neely, Gordon, Bedford, Ramberg, Guerrero, Coyne, and Maceo Against: None Abstain: None Recuse: None Absent: Creel, Thompson 1 Approved By: Linda Guerrero, Environmental Commission Chair 2