Electric Utility Commission Homepage

RSS feed for this page

May 13, 2021

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Versión en español a continuación. Special Called Meeting of the Electric Utility Commission May 13, 2021 The Electric Utility Commission is to be held May 13, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance of Wednesday, May 12 by noon. All public comment will occur at the beginning of the meeting. To speak remotely at the Electric Utility Commission meeting, members of the public must: •Call or email the board liaison at 512-497-0966 or Jeff.Vice@austinenergy.com no later than noon, Wednesday, May 12. The information required is the speaker name, the telephone number they will use to call into the meeting, and their email address (so that the dial-in info may be provided). If speaking on a specific item, residents must indicate the item number(s) they wish to speak on and whether they are for/against/neutral. Speakers on any topic that is not a posted agenda item will be limited to the first 10. •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak; each speaker will have up to three minutes to speak. •Handouts or other information may be emailed to Jeff.Vice@austinenergy.com by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch-atxn-live la Reunión del Electric Utility Commission FECHA de la reunion (13 de Mayo 2021) La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (12 de mayo antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: junta en 512-497-0966 or • Llame o envíe un correo electrónico al enlace de Jeff.Vice@austinenergy.com a más tardar al mediodía (el día antes de la reunión). La información requerida es el …

Scraped at: May 7, 2021, 10:30 p.m.
May 13, 2021

Item 10: 2nd Qtr Financial Briefing original pdf

Thumbnail of the first page of the PDF
Page 1 of 32 pages

Item 10 Austin Energy Quarterly Financial Report 2nd Quarter FY 2021 (January - March) Mark Dombroski Chief Financial Officer May 13, 2021 © 2018 Austin Energy Disclaimer Certain information set forth in this presentation contains forecasted financial information. Forecasts necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance. Although the forecasted financial information contained in this presentation is based upon what Austin Energy management believes are reasonable assumptions, there can be no assurance that forecasted financial information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forecasts. In addition, this presentation contains unaudited information and should be read in conjunction with the audited Comprehensive Annual Financial Reports for the City of Austin, which was published on March 18, 2021: https://assets.austintexas.gov/financeonline/downloads/comprehensive_annual_financial_report/comprehensi ve_annual_financial_report_2020.pdf 2 QUARTERLY Financial Report Agenda Executive Summary Financial Policy Compliance Financial Performance Measures Actual to Budget Analysis Financial Statements Market and Industry Analyses 3 Austin Energy Quarterly Financial Report Executive Summary 4 Executive Summary Substantially compliant with all financial policies. Contingency and Capital Reserve balances below minimums but total cash above minimum of $457m. $ 501 Million Revenues Operating revenues at March are 22% under budget due to decreased Power Supply Revenue due to the February winter storm. Balance sheet is liquid and adequately capitalized. Cash increased $42m primarily due to ERCOT settlement revenue related to the February winter storm. Generally meeting financial metrics supporting AA credit rating (reaffirmed October 2020). Received credit upgrade from Fitch Ratings in May 2019. $372 Million Expenses Operating expenses are 28% under budget due to lower Power Supply costs due to the February winter storm. The COVID pandemic has compounded the trends of an increasing number of customers with lower consumption per customer resulting in a deficiency of revenues. This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on www.austintexas.gov/financeonline/finance/main.cfm 5 Austin Energy Quarterly Financial Report Financial Policy Compliance 6 Financial Policy Compliance Financial policies are memorialized and adopted by ordinance each year during the budgeting process Compliance Debt Reserves Operating Non-Compliance Debt Policies Reserves Policies Operating Policies Full Compliance Partial Compliance Full Compliance Contingency and Capital Reserve balance below minimums but total cash above minimum of $457m This information …

Scraped at: May 7, 2021, 10:30 p.m.
May 13, 2021

Item 11: 2nd Qtr Operations Briefing original pdf

Thumbnail of the first page of the PDF
Page 1 of 14 pages

Item 11 Austin Energy Operational Update Q2 FY21 Electric Utility Commission – May 2021 Sidney Jackson Chief Operating Officer, Austin Energy May 13, 2021 © 2018 Austin Energy 1 Austin Energy Operational Update Discussion Topics Performance Carbon Footprint On-Site Energy Resources Future State 2 Austin Energy Operational Update Performance 3 Commercial Availability & Start Success Commercial Availability Generation Resource Target Seasonal Commercial % Availability Commercial Availability Actuals (%) Q1 FY21 AVG Q2 FY21 AVG 39 69 97 100 91 98 100 91 * 95 95 97 100 Decker Steam Units Sand Hill Combined Cycle Fayette Units South Texas Project Start Success Commercial Availability values reflect maintenance or refueling outages typical for this period Start Success Target(%) Start Success Actuals (%) Q2 FY21 AVG Q1 FY21 AVG Simple Cycle Start Success 99 100 100 4 Net Generation and Load Analysis FY 2021 Q2 Power Generation Cost by Fuel Type Consumption vs. Generation (GWh) 19% 5% 2% 74% 6,140 8,000 6,000 4,000 2,000 0 7,166 1,026 1,784 1,438 2,918 Renewables Coal *Costs include fuel for generation, fuel transportation, renewable Power purchases agreements Nuclear Natural Gas Consumption Generation Renewables Coal Nuclear Natural Gas Historical FY Q2 System Peak Demand (MW) Renewable Power as Percent of Consumption 3,000 2,800 2,600 2,400 2,200 2,000 2,572 2,411 2,129 2,197 2,045 2017 2018 2019 2020 2021 52% Non-renewables Renewables 48% This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on 5 System Reliability CAIDIs w/o MED CAIDI = Customer Average Interruption Duration Index Average time to restore service. SAIDI = System Average Interruption Duration Index Total duration of interruptions for the average customer, during a period of time. SAIFI = System Average Interruption Frequency Index How often the average customer experiences a sustain interruption, over a period of time. MED = Major Event Days I F O N O T A R U D L A T O T I S N O T P U R R E T N I 70 60 50 40 30 20 10 0 SAIDIs w/o MED 60.41 45.50 57.89 45.50 Q2 FY20 Q2 FY21 Austin Energy Goal 80.55 66.82 0.75 0.57 E R O T S E R O T E M T I . G V A I E C V R E S 90 80 70 60 50 40 30 20 10 0 I …

Scraped at: May 7, 2021, 10:30 p.m.
May 13, 2021

Item 12: Code briefing original pdf

Thumbnail of the first page of the PDF
Page 1 of 10 pages

Item 12 Austin Energy Green Building Energy Code Intro. for the EUC Kurt Stogdill Manager, Green Building & Sustainability May 13, 2021 © 2020 Austin Energy Agenda • Overview of International Energy Conservation Code (IECC) • Overview/timeline of local IECC development and adoption process • 2021 IECC- notable developments • Next steps 2 Overview of IECC • Energy is one of the International Codes developed by the International Code Council • New codes on 3-year cycles • Austin is on the 2015 IECC currently • Regulate design and construction for effective use and conservation of energy, permit use of innovative approaches • Energy code is divided- commercial and residential 3 IECC Overview con’t… • Main sections include Insulation Envelope • • • Mechanical systems • Lighting • Three ways of meeting requirements • • • Prescriptive- ex. You must do a, b and c Performance based- modeling COM/REScheck- combination of prescriptive and performance based • Local amendments- municipalities may pass amendments to the IECC to meet relevant local goals and priorities 4 Process of Code Adoption Roles • Development Services Department (DSD)- responsible for adoption and enforcement of building codes for the City • Austin Energy Green Building- facilitates stakeholder review and development of local amendments 5 Code Adoption con’t… Stakeholder review/input • Split- residential and commercial • Open March 15 through April 15 via DSD’s Public Input portal https://publicinput.com/V1231 • Includes- home builders, Home Builder’s Association, architects, American Institute of Architects, non-profits, environmental community 6 4/20- RMC- Introduction 4/28- Joint Sustainability Commission- courtesy review Schedule 5/6- City Council- “set hearing”-DSD 5/13- EUC- courtesy review 5/18- RMC- Review proposed code, stakeholder feedback DSD will need the RMC recommendation within 2 days to update the posting 5/25- Mechanical & Plumbing Board- courtesy review 5/26- Building & Fire Code Board of Appeals- courtesy review 6/3- City Council for approval- DSD 9/1- Implementation 7 2021 IECC- Notable Developments • Estimate 8-10% increase in energy efficiency over existing code • Electric Vehicle (EV) Ready and Electrification were struck during appeals IECC- Local- • No new local amendments, will carry over relevant 2015 amendments • Will carry forward Solar Ready • Will remove requirement for natural gas water heating for residential construction • Energy Rating Index (ERI) will remain the same • Look to progress EV Ready and Electric Ready through means other than IECC 8 Other Steps • Model local (MW, kWh) impacts • …

Scraped at: May 7, 2021, 10:30 p.m.
May 13, 2021

Item 14: Council Action Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

Item 14 EUC Report re Council Action May 13, 2021 Item below recommended by EUC April 19; Council approved on date indicated in parenthesis. 2. (4/22) [Capital Contracting] Authorize award and execution of a construction contract with Austin Underground Inc. (MBE), for 301 W. 20th – Duct Bank WR project in the amount of $542,120 plus a $54,212 contingency, for a total contract amount not to exceed $596,332. 3. (4/22) [Purchasing] Authorize an amendment to an existing contract with Pike Enterprises Inc D/B/A Pike Electric LLC, for continued substation installation, repair, and maintenance services, for an increase in the amount of $2,000,000, for a revised total contract amount not to exceed $5,000,000. 4. (4/22) [Purchasing] Authorize an amendment to an existing contract with Pike Enterprises Inc, to provide continued transmission and distribution electrical services, for an increase in the amount of $4,000,000, for a revised contract amount not to exceed $93,000,000. 5. (5/6) [Purchasing] Authorize negotiation and execution of a contract with Wesco Distribution, Inc., D/B/A Hi-Line Utility Supply Co, LLC aka Power Supply, for substation capacitor banks, for a term of five years for a total contract amount not to exceed $2,700,000. 6. (5/6) [Purchasing - Multi-Dept; AE’s portion approximately $9M] Authorize an amendment to an existing cooperative contract with Dell Marketing LP, to provide Dell hardware and software products and related services including maintenance and support, for an increase in the amount of $21,000,000, for a revised total contract amount not to exceed $68,250,000. 7. (5/6) [Purchasing] Authorize negotiation and execution of a contract with Gruene Environmental Companies LLC D/B/A Gruene Environmental Construction LP, to provide spill response, cleanup and restoration services, for a term of five years for a total contract amount not to exceed $2,000,000. 8. (5/6) [Purchasing] Authorize award of a multi-term contract with KBS Electrical Distributors, Inc., for pressure treated wood poles, for up to five years for a total contract amount not to exceed $3,700,000. 9. (5/6) [Purchasing] Authorize an amendment to an existing cooperative contract with SHI Government Solutions, Inc., to continue providing Tableau products and software including maintenance and support, for an increase in the amount of $330,000, for a revised total contract amount not to exceed $1,051,000. 1

Scraped at: May 7, 2021, 10:30 p.m.
May 13, 2021

Items 2-9: Draft RCAs original pdf

Thumbnail of the first page of the PDF
Page 1 of 15 pages

Item 2 Posting Language ..Title Authorize an amendment to an existing contract with Schneider Electric Smart Grid Solutions, LLC, for continued purchase of web-based load profiling software, licenses, maintenance and support, for an increase in the amount of $3,947,000 and to extend the term by six years, for a revised total contract amount not to exceed $6,002,814. (Note: This contract is exempt from City Code Chapter 2-9C Minority and Women Owned Business Enterprise Procurement Program; therefore, no subcontracting goals were established). ..Body Lead Department Purchasing Office. Client Department(s) Austin Energy. Purchasing Language: Contract Amendment. Fiscal Note Funding in the amount of $312,804 is available in the Fiscal Year 2020-2021 Operating Budget of Austin Energy. Funding for the remaining contract term is contingent upon available funding in future budgets. Prior Council Action: March 31, 2016 – Council approved the original contract, item 36, on an 9-0 vote with Council Member Zimmerman abstaining and Mayor Adler absent. For More Information: Inquiries should be directed to the City Manager’s Agenda Office, at 512-974-2991 or AgendaOffice@austintexas.gov or to Paula Barriffe, at 512-322-6118 or Paula.Barriffe@austintexas.gov. Council Committee, Boards and Commission Action: May 10, 2021 - To be reviewed by the Electric Utility Commission. Additional Backup Information: The proposed amendment will increase the authorization allowing Austin Energy to include additional meter volume seen due to growth in Austin and continue the use of automation software for demand response and load profiling software services. The load profiling services allow Austin Energy business customers to monitor their 15 minutes, daily, and monthly energy usage over the internet through a secure website and mobile applications. The service is a convenient and user-friendly means by which customers can identify wasteful energy practices, troubleshoot mechanical system maintenance issues, and verify improved conservation measures as well as correlations of energy use with business customers. The continuation of these services supports customer satisfaction for Austin Energy as it provides direct services/benefits to over 29,000 commercial and industrial customers; enables transparency and availability of accurate information; provides customers with access to expanded programs and offerings, including those offered by the Electric Reliability Council of Texas; and provides essential data used for Austin Energy operations and demand response customer settlements. Schneider holds copyright and trade secret rights to its proprietary software, licenses, and maintenance and support. ..Strategic Outcome(s) Strategic Outcome(s): Government That Works for All. . Item 3 Posting Language ..Title Authorize negotiation and execution …

Scraped at: May 7, 2021, 10:30 p.m.
May 13, 2021

Play video original link

Play video

Scraped at: May 21, 2021, 8 p.m.
May 13, 2021

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Electric Utility Commission May 13, 2021 Minutes The Electric Utility Commission (EUC) convened a regularly scheduled meeting via videoconference/Webex. Meeting called to order by Chair Hopkins at 5:32 p.m. Also present were Commissioners Chapman, Hadden, Reed, Trostle, Tuttle and Weldon. Commissioner Stone joined following citizen communication. Commissioners Ferchill, Funkhouser and Wray were absent. Chair prerogative: update regarding meeting dates/times; June 21st at 5:30P tentative date. CITIZEN COMMUNICATION: GENERAL – Paul Robbins re Customer Assistance Program and code amendments (Item 12) 1. APPROVAL OF MINUTES – Approve minutes of the April 19, 2021 regular meeting. Motion (Trostle) to approve minutes; seconded (Weldon); passed on a vote of 8-0, with Commissioners Ferchill, Funkhouser and Wray absent. NEW BUSINESS – CONSENT ( ) = Target Council Meeting Date; [ ] = RCA Type Items 2-5, 7-9 unanimously recommended on consent (8-0, with Commissioners Ferchill, Funkhouser and Wray absent). Following discussion, motion (Chapman) to recommend Item 6; seconded (Reed); recommended on a vote of 8-0, with Commissioners Ferchill, Funkhouser and Wray absent. 2. (6/3) [Purchasing] Authorize an amendment to an existing contract with Schneider Electric Smart Grid Solutions, LLC for continued purchase of web-based load profiling software, licenses, maintenance and support, for an increase in the amount of $3,947,000 and to extend the term by six years, for a revised total contract amount not to exceed $6,002,814. 3. (6/3) [Purchasing] Authorize negotiation and execution of a multi-term contract with Catapult Systems, LLC, to provide technical and support services for Microsoft on-premise software and cloud services, for up to five years for a total contract amount not to exceed $12,000,000. 4. (6/3) [Purchasing] Authorize negotiation and execution of a contract with DLT Solutions, LLC, to provide computer-aided drafting software and data management tools including maintenance and support, for a term of five years in an amount not to exceed $1,700,000. 5. (6/3) [Purchasing] Authorize award of a multi-term contract with Priester-Mell & Nicholson, for air insulated switchgear, for up to five years for a total contract amount not to exceed $3,500,000. 6. (6/3) [Austin Energy] Approve an ordinance amending the Fiscal Year 2020-2021 Austin Energy Operating Budget (Ordinance No. 20200812-001) to decrease the Austin Energy Operating Fund Ending Balance by $1,165,887 and increase the Conservation Rebates expenses by $1,165,887 to provide additional funding for the Austin Energy Weatherization Assistance Program. 7. (6/3) [Purchasing Multi-departmental; AE’s estimated amount is $2.17M] Authorize award of a multi-term contract …

Scraped at: June 22, 2021, 8:30 p.m.
April 19, 2021

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Versión en español a continuación. Special Called Meeting of the Electric Utility Commission April 19, 2021 The Electric Utility Commission is to be held April 19, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance of Sunday, April 18 by noon. All public comment will occur at the beginning of the meeting. To speak remotely at the Electric Utility Commission meeting, members of the public must: •Call or email the board liaison at 512-497-0966 or Jeff.Vice@austinenergy.com no later than noon, Sunday, April 18. The information required is the speaker name, the telephone number they will use to call into the meeting, and their email address (so that the dial-in info may be provided). If speaking on a specific item, residents must indicate the item number(s) they wish to speak on and whether they are for/against/neutral. Speakers on any topic that is not a posted agenda item will be limited to the first 10. •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak; each speaker will have up to three minutes to speak. •Handouts or other information may be emailed to Jeff.Vice@austinenergy.com by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch-atxn-live la Reunión del Electric Utility Commission FECHA de la reunion (19 de Abril 2021) La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (18 de Abril antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: junta en 512-497-0966 or • Llame o envíe un correo electrónico al enlace de Jeff.Vice@austinenergy.com a más tardar al mediodía (el día antes de la reunión). La información requerida es el …

Scraped at: April 15, 2021, 2 p.m.
April 19, 2021

Item 10: Financial Statements original pdf

Thumbnail of the first page of the PDF
Page 1 of 6 pages

Item 10

Scraped at: April 16, 2021, 4:30 a.m.
April 19, 2021

Item 10: Fund Summary original pdf

Thumbnail of the first page of the PDF
Page 1 of 1 page

AUSTIN ENERGY FUND For the Fiscal Year Through September 30, 2020 BEGINNING BALANCE REVENUE Base Revenue Power Supply Revenue Community Benefit Revenue Regulatory Revenue Transmission Revenue Transmission Rider Other Revenue Interest Income TOTAL REVENUE OPERATING REQUIREMENTS Power Supply Recoverable Expenses Non-Fuel Operations & Maintenance Conservation Conservation Rebates Nuclear & Coal Plants Operating Other Operating Expenses TOTAL OPERATING REQUIREMENTS OTHER REQUIREMENTS Accrued Payroll TOTAL OTHER REQUIREMENTS DEBT SERVICE General Obligation Debt Service Current Year Capital Lease Debt Service (Principal and Interest) TOTAL DEBT SERVICE TRANSFERS OUT Electric Capital Improvement Program General Fund Contingency Reserve Voluntary Utility Assistance Fund Trunked Radio Workers' Compensation Other City Transfers Administrative Support Communication and Technology Management Fund Economic Development Fund Power Supply Stabilization Reserve Fund AE Capital Reserve Fund TOTAL TRANSFERS OUT EXCESS (DEFICIENCY) OF TOTAL AVAILABLE FUNDS OVER TOTAL REQUIREMENTS TOTAL AVAILABLE FUNDS 1,409,686,234 1,414,686,234 136,272,609 1,389,861,025 1,389,861,025 (24,825,209) (1.8%) Approved Budget Amended Budget September w/Encumb Year to Date w/Encumb Year-End Estimate Variance % Variance Fav (Unfav) Fav (Unfav) 364,417,031 364,417,031 413,409,738 413,409,738 48,992,707 13.4% 630,361,573 421,981,148 56,284,808 138,012,724 84,317,165 0 64,644,138 14,084,678 1,409,686,234 630,361,573 421,981,148 61,284,808 138,012,724 84,317,165 0 64,644,138 14,084,678 1,414,686,234 60,190,931 40,718,528 10,088,938 13,144,248 7,022,457 0 4,527,008 580,499 136,272,609 617,506,790 420,065,608 54,577,926 153,368,687 83,791,065 0 49,973,450 10,577,499 1,389,861,025 617,506,790 420,065,608 54,577,926 153,368,687 83,791,065 0 49,973,450 10,577,499 1,389,861,025 362,116,248 153,012,724 352,035,576 15,640,663 23,123,501 96,442,360 5,444,301 1,007,815,373 362,116,248 153,012,724 352,035,576 15,640,663 23,123,501 96,442,360 5,444,301 1,007,815,373 31,819,004 12,310,640 25,001,827 1,441,461 2,298,864 5,728,994 1,556,737 80,157,528 367,919,380 144,926,370 366,335,558 12,028,773 18,419,758 98,983,652 5,750,012 1,014,363,502 367,919,380 144,926,370 366,335,558 12,028,773 18,419,758 98,983,652 5,750,012 1,014,363,502 SUBTOTAL BEFORE TRANSFERS 1,008,388,640 1,008,388,640 80,730,795 1,014,936,769 1,014,936,769 (6,548,129) (0.6%) SUBTOTAL BEFORE TRANSFERS OUT 1,008,388,640 1,008,388,640 80,730,795 1,014,936,769 1,014,936,769 (6,548,129) (0.6%) 573,267 573,267 573,267 573,267 573,267 573,267 573,267 573,267 573,267 573,267 0 0 0.0% 0.0% 1,152 125,209 1,152 125,209 0 0 876 136,194 876 136,194 153,921,915 154,048,276 153,921,915 154,048,276 17,671,032 17,671,032 151,571,984 151,709,054 151,571,984 151,709,054 276 (10,985) 2,349,931 2,339,222 80,495,689 111,000,000 0 600,000 892,059 1,514,778 3,592,853 29,544,635 11,224,739 9,069,619 0 0 247,934,372 80,495,689 111,000,000 0 5,600,000 892,059 1,514,778 3,592,853 29,544,635 11,224,739 9,069,619 0 0 252,934,372 6,152,418 9,250,000 0 2,500,000 0 126,226 965,409 2,462,052 935,394 755,797 0 0 23,147,297 80,495,689 111,000,000 0 5,600,000 767,329 1,514,778 3,468,199 29,544,635 11,224,739 9,069,619 0 0 252,684,988 80,495,689 111,000,000 0 5,600,000 767,329 1,514,778 3,468,199 29,544,635 11,224,739 9,069,619 0 0 252,684,988 0 0 0 0 124,730 0 124,654 0 0 0 0 0 249,384 TOTAL REQUIREMENTS 1,410,371,288 1,415,371,288 121,549,124 1,419,330,811 1,419,330,812 (3,959,524) …

Scraped at: April 16, 2021, 4:30 a.m.
April 19, 2021

Item 10: FY22 Forecast original pdf

Thumbnail of the first page of the PDF
Page 1 of 34 pages

Item 10 Austin Energy Fiscal Year 2022 Forecast and Budget Planning Mark Dombroski Chief Financial Officer April 19, 2021 © 2018 Austin Energy Fiscal Year 2022 Forecast and Budget Planning Agenda Budget Schedule Forecast Inputs, Assumptions and Process Forecast Summary Budget Planning 3 Austin Energy Fiscal Year 2022 Forecast and Budget Planning Budget Schedule 4 City of Austin Fiscal Year 2022 Budget Timeline FY 2021 FY 2021 FY 2021 FY 2021 FY 2021 FY 2021 FY 2021 FY 2021 FY 2021 FY 2022 FY 2022 FY 2022 JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 28th – 7th Austin Energy Budget Development City of Austin Budget Development Austin Energy FY22 Forecast Development 16th City Council Financial Forecast Report Delivered 19th EUC Forecast & Budget Process Presentation 1st Austin Energy Pass-Through Rate Change Effective 1st City of Austin Fiscal Year 2022 9th City Council City Manager Proposed Budget Presentation 12th EUC Proposed Budget Presentation 3rd City Council Council Budget Work Session & Set Max Rate 23rd & 30th City Council Public Hearings 29th City Council Set Max Tax Rate Budget & Tax Rate Hearings 11th City Council Public Hearing Tax Rate 11th – 13th City Council Budget Readings/Adoption Adopt Tax Rate Call Election, If Necessary 5 City of Austin and Austin Energy Financial and Performance Data Sources Austin Finance Online City of Austin Budget Documents https://www.austintexas.gov/financeonline/fin ance/index.cfm https://www.austintexas.gov/financeonline/afo _content.cfm?s=1 City of Austin Strategic Direction 2023 https://www.austintexas.gov/financeonline/afo _content.cfm?s=73 Performance Austin Data Austin: Austin Energy https://cityofaustin.github.io/PerformanceATX/ https://data.austintexas.gov/browse?Additiona l-Information_Department=Austin+Energy Austin Energy Corporate Reports and Data Library https://austinenergy.com/ae/about/reports- and-data-library/reports-and-data-library 6 Forecast to Budget 5-Step Process 5-Year Forecast 1. The forecast is a 5-year “top down” analysis used to establish thresholds for budget development by the business units and to gauge future financial policy compliance and rate impacts 2. Business units use the targets to allocate funds to accomplish program and project requirements Business Unit Targets 4. Prior to submitting the budget, Austin Energy updates and revises the forecast with information from the organizational budgets, latest market data and makes adjustments to ensure compliance Organizational Budgets Revised Forecast Budget Submission 3. Austin Energy uses a “bottom up” approach to develop organizational one-year budgets and 5- year CIP using eCOMBS and PowerPlan while reconciling funding needs to forecasted revenues 5. Austin Energy submits its proposed one-year budget and 5-year CIP to City of Austin Finance where it is compiled, reviewed and possibly revised …

Scraped at: April 16, 2021, 4:30 a.m.
April 19, 2021

Item 11: Briefing re Energy Market Ops, Regulatory Framework, PSA, Load Shed original pdf

Thumbnail of the first page of the PDF
Page 1 of 24 pages

Energy Market Economics & Texas Regulatory Framework Item 11 Erika Bierschbach Vice President, Energy Market Operations & Resource Planning April 19, 2021 © 2018 Austin Energy The Public Utility Commission of Texas • PURA 39 – established a fully competitive electric power industry • Authority to oversee electric market structure • Adopts rules addressing market • Appellate authority over ERCOT protocols adopted by ERCOT board • Complete authority over ERCOT finances, budget and operations with oversight by Texas Legislature • Approves ERCOT Bylaws • 16-member ERCOT Board composition is established by law • Currently under review by the Texas State Legislature 2 ERCOT Corporate Governance (Electric Reliability Council of Texas) • Founded in 1970 • TX Legislature enacted laws governing all ERCOT activities • See PURA Section 39.151 • Tx non-profit corporation with members from seven market segments: • Consumers (Commercial, industrial, residential) • Cooperatives • Independent Generators • Independent Retail Electric Providers • Investor-Owned Utilities • Municipals 3 ERCOT Responsibilities ERCOT’s Primary Responsibility is Reliability • Match generation with demand • Settlements • Retail switching • Transmission access Executes competitive markets for reliability services 4 ERCOT Mechanics Electric Wholesale Market Austin Energy’s Owned and Contracted Assets Austin Energy delivers generation to ERCOT’s Wholesale Market • • • • • • 430 MW Nuclear 600 MW Coal 1,161 MW Natural Gas 108 MW Biomass 1,795 MW Wind 1,216 MW Solar * * includes signed contracts not yet online 5 How Does Austin Energy (AE) Participate? • AE does not self supply its generation to its customers • AE’s participation in the ERCOT market is not optional • AE’s generation competes in ERCOT’s deregulated wholesale market • AE is a Municipal Market Participant / Non-Opt-In Entity • AE is a Load Serving Entity – purchases customer’s power from grid at city’s load zone • ERCOT charges AE for all power we pull from grid / market at AE’s load zone price • AE is a Generator – sells electric resources to grid at locations throughout the state • ERCOT pays AE for all power we offer grid / market at prices at each resource How was Austin Energy’s portfolio prepared for 2021’s February Winter Event? 6 Supply (Capacity) by Fuel Source vs Austin Energy Load during February 2021 Winter Event 3500 3000 2500 2000 1500 1000 500 0 20210211 20210212 20210213 20210214 20210215 20210216 20210217 20210218 20210219 Nuclear Coal Natural Gas …

Scraped at: April 16, 2021, 4:30 a.m.
April 19, 2021

Item 14: Council Action Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Item 14 EUC Report re Council Action April 19, 2021 Item below recommended by EUC October 12; Council approved on date indicated in parenthesis. 11. (3/4) [Purchasing: Various depts; AE’s portion $1,350,000] Authorize award of a multi-term contract with Expert Relocation Services, LLC, to provide citywide moving and relocation services, for up to five years for a total contract amount not to exceed $5,783,500. Items below recommended by EUC January 11; Council approved on date indicated in parenthesis. 8. (3/4) [Purchasing] Authorize negotiation and execution of a cooperative contract with Freeit Data Solutions, Inc., for information technology professional services for the Advance Distribution Management System and Supervisory Control and Data Acquisition Energy Management System , for a term of five years in an amount not to exceed $750,000. 9. (3/4) [Purchasing – Multiple Departments; AE’s estimated portion: $300K] Authorize an amendment to an existing cooperative contract with Insight Public Sector Inc D/B/A Insight Public Sector, to continue the Adobe Enterprise License Agreement and related services, for an increase in the amount of $1,300,000 and to extend the term by three years, for a revised total contract amount not to exceed $1,741,563. 11. (3/4) [Purchasing – Multiple Departments; AE’s estimated portion: $908K] Authorize award of eight contracts for COVID-19 temperature screening services, with InGenesis, Inc.; Arch Staffing and Consulting, LLC; Donald L Mooney Enterprises, LLC; Acadia Workforce Inc.; Protouch Nurses, Inc; Ascend National LLC; Capitol Medical Services, LLC; and First Medical Response of Texas Inc.; each for a term of six months or until the contract amounts are expended in an amount not to exceed $3,700,000, divided among the contractors. Items below recommended by EUC February 8; Council approved on date indicated in parenthesis. 2. (3/4) [Capital Contracting] Authorize negotiation and execution of an amendment to the professional services agreement with Stanley Consultants, Inc., for professional engineering services for the Rainey Street Gas Insulated Switchgear Substation Design (formerly Future Downtown Gas Insulated Switchgear Substation Design) in the amount of $1,436,895, for a total contract amount not to exceed $2,895,895. 3. (3/4) [Capital Contracting] Authorize award and execution of a construction contract with DynaGrid Construction Group, LLC, for Bluff Springs Substation in the amount of $7,407,380.03 plus a $740,380 contingency, for a total contract amount not to exceed $8,148,118.03. 4. (3/4) [Austin Energy] Authorize execution of 10-year extensions to existing electric service franchise agreements for the use of rights-of-way within other municipalities …

Scraped at: April 16, 2021, 4:30 a.m.
April 19, 2021

Items 2-9: Draft RCAs original pdf

Thumbnail of the first page of the PDF
Page 1 of 16 pages

Item 2 Posting Language ..Title Authorize award and execution of a construction contract with Austin Underground Inc. (MBE), for 301 W. 20th – Duct Bank WR project in the amount of $542,120 plus a $54,212 contingency, for a total contract amount not to exceed $596,332. [Note: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 98.08% MBE and 1.75% WBE participation.] ..Body Lead Department Capital Contracting Office Managing Department Public Works Department Prior Council Action: N/A Fiscal Note Funding is available in the Fiscal Year 2020 -2021 Capital Budget of Austin Energy. Purchasing Language: Lowest responsive bid of two bids received through a competitive Invitation for Bid solicitation. For More Information: Inquiries should be directed to the City Manager’s Agenda Office, at 512-974-2991 or AgendaOffice@austintexas.gov. NOTE: Respondents to this solicitation, and their representatives, shall direct inquiries to Rolando Fernandez, 512-974-7749, Garrett Cox, 512-974-9423, or the Project Manager, Larry Mendez, 512-974-7124. Council Committee, Boards and Commission Action: To be reviewed by the Electric Utility Commission April 12, 2021 Additional Backup Information: The existing duct bank conduits have collapsed in this area and Austin Energy cannot install conductive or electrical cables through it. To maintain reliable electricity, a new duct bank is needed for electrical distribution and to facilitate an underground feeder installed in the new conduit. The work consists of supplementing approximately 800 linear feet of Orangeburg conduits by installing nine new 5-inch ducts from 301 W. 20th Street to 105 W. 20th Street. The duct bank will connect the existing manholes in W. 20th Street and terminate with two 5-inch ducts to a future riser. During construction there will be lane closures and detours. The contractor will install appropriate traffic detour signs and barricades to direct traffic. A delay in the approval of this contract will limit the distribution of electricity to surrounding buildings. Due to the potential for unforeseen underground conflicts, a 10% contingency in funding has been included to allow for the expeditious processing of any change orders. A contingency is an additional amount of money added to the construction budget to cover any unforeseen construction costs associated with the project. By authorizing the additional contingency funding, Council is authorizing any change orders within the contingency amount. The contract allows 270 calendar days for completion of this project. This project is …

Scraped at: April 16, 2021, 4:30 a.m.
April 19, 2021

Play video original link

Play video

Scraped at: May 21, 2021, 8 p.m.
April 19, 2021

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Electric Utility Commission April 19, 2021 Minutes The Electric Utility Commission (EUC) convened a regularly scheduled meeting via videoconference/Webex. Meeting called to order by Chair Hopkins at 5:34 p.m. Also present were Commissioners Chapman, Ferchill, Funkhouser, Stone, Trostle and Weldon. Commissioners Hadden and Reed joined during the staff briefing. Commissioners Tuttle and Wray were absent. CITIZEN COMMUNICATION: GENERAL – Paul Robbins re Customer Assistance Program 1. APPROVAL OF MINUTES – Approve minutes of the March 8, 2021 regular meeting. Motion (Trostle) to approve minutes; seconded (Chapman); passed on a vote of 7-0, with Commissioners Hadden and Reed off the dais and Commissioners Tuttle and Wray absent. NEW BUSINESS – CONSENT ( ) = Target Council Meeting Date; [ ] = RCA Type Items 2, 3, 5-9 unanimously recommended on consent (7-0, with Commissioners Hadden and Reed off the dais and Commissioners Tuttle and Wray absent). Following discussion, motion (Ferchill) to recommend Item 4; seconded (Weldon); recommended on a vote of 7-0, with Commissioners Hadden and Reed off the dais and Commissioners Tuttle and Wray absent. 2. (4/22) [Capital Contracting] Authorize award and execution of a construction contract with Austin Underground Inc. (MBE), for 301 W. 20th – Duct Bank WR project in the amount of $542,120 plus a $54,212 contingency, for a total contract amount not to exceed $596,332. 3. (4/22) [Purchasing] Authorize an amendment to an existing contract with Pike Enterprises Inc D/B/A Pike Electric LLC, for continued substation installation, repair, and maintenance services, for an increase in the amount of $2,000,000, for a revised total contract amount not to exceed $5,000,000. 4. (4/22) [Purchasing] Authorize an amendment to an existing contract with Pike Enterprises Inc, to provide continued transmission and distribution electrical services, for an increase in the amount of $4,000,000, for a revised contract amount not to exceed $93,000,000. 5. (5/6) [Purchasing] Authorize negotiation and execution of a contract with Wesco Distribution, Inc., D/B/A Hi-Line Utility Supply Co, LLC aka Power Supply, for substation capacitor banks, for a term of five years for a total contract amount not to exceed $2,700,000. 6. (5/6) [Purchasing - Multi-Dept; AE’s portion approximately $9M] Authorize an amendment to an existing cooperative contract with Dell Marketing LP, to provide Dell hardware and software products and related services including maintenance and support, for an increase in the amount of $21,000,000, for a revised total contract amount not to exceed $68,250,000. 7. (5/6) [Purchasing] …

Scraped at: May 27, 2021, 9 p.m.
March 8, 2021

Special called Joint EUC/RMC meeting to be held by videoconference. original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Versión en español a continuación. Special Called Joint Meeting of the Electric Utility and Resource Management Commissions March 8, 2021 The Joint Electric Utility and Resource Management Commission meeting is to be held March 8, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance of Sunday, March 7 by Noon. All public comment will occur at the beginning of the meeting. To speak remotely at the Joint Electric Utility and Resource Management Commission meeting, members of the public must: •Call or email the board liaison at 512-322-6505 or Natasha.Goodwin@austinenergy.com no later than noon, Sunday, March 7. The information required is the speaker name, the telephone number they will use to call into the meeting, and their email address (so that the dial-in info may be provided). If speaking on a specific item, residents must indicate the item number(s) they wish to speak on and whether they are for/against/neutral. Speakers on any topic that is not a posted agenda item will be limited to the first 10. •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak; each speaker will have up to three minutes to speak. •Handouts or other information may be emailed to Natasha.Goodwin@austinenergy.com by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch-atxn-live The City of Austin is committed to compliance with the American with Disabilities Act. Reasonable modifications and equal access to communications will be provided upon request. M eeting locations are planned with wheelchair access. If requiring Sign Language Interpreters or alternative formats, please call (512) 322-6450 at least 48 hours before the meeting date. TTY users route through Relay Texas at 711. For more information, please call (512) 322-6505. la Reunión del Electric Utility and Resource Management Commissions FECHA de la reunion (8 de Marzo 2021) La junta se llevará con …

Scraped at: March 4, 2021, 8:30 p.m.
March 8, 2021

Item 1: Briefing on February 2021 Winter Storm Event original pdf

Thumbnail of the first page of the PDF
Page 1 of 28 pages

Item 1 Austin Energy February Storm Briefing: Event Overview and Communications March 8, 2021 © 2018 Austin Energy Unprecedented Winter Weather Event in Texas Strains Electric Grid February 11-21 Sidney Jackson Deputy General Manager and Chief Operating Officer 2 100-Year Storm Event 3 Emergency Preparedness and Response Incident Command Austin Energy’s Incident Command has been operational since COVID-19 and pivoted to winter storm mode for this event. Crews were sequestered during the event. Distribution Crews Dozens of distribution crews were sequestered and worked through ice and snow to restore power. Customer Care The Utility Contact Center fielded thousands of calls during the winter storm. They were able to provide information to customers and help them with questions regarding outages. 4 Vegetation Impact to Power Lines • Polar Vortex event combined with multiple winter ice, snow and windstorms that crossed the area Feb. 11-18 • Ice accumulation increased during the events and weighed down limbs and overhanging power lines. • Falling trees, falling limbs and tree contact occurred during the entire period from Feb 11-18. This resulted in damage to active feeders and just-restored feeders as well as feeders out for load shed. • Frozen lines and vegetation created hazardous working conditions and contributed to increased restoration times 5 Phases of Extreme Winter Weather Event Impacts from Initial Ice and Snow Storms (2/11-2/14) ERCOT-Directed Outages (2/15-2/17) System Restoration and Recovery (2/18-2/2) 6 Overall Event Timeline (February 11-21) Ice Storm & Wind Ice Storms, Localized High Winds & crystalline Snow Storm Ice storm and freezing rain POLAR VORTEX & BELOW FREEZING EVENT ERCOT-DIRECTED OUTAGES FEB. 11 12 13 14 15 16 17 18 19 20 FEB. 21 Customers restored after Feb. 11 ice storm; However, new outages started coming in ERCOT IMPACTS TO AE RESTORATION Incremental loading on trees and branches from ice events Challenges • • Falling debris continued during the entire series of events • Load shed feeders that were out from ERCOT actions were also damaged by falling debris • Depth of ERCOT reductions resulted in lengthy feeder outages • Lengthy outages required AE Crews to segment feeders due to Cold Load pick-up; Some issues with iced-up line switches • Road travel difficult and slow for AE Crews 100% Customers restored after ice storms and restoration issues from mandated ERCOT outages This slide is demonstrative as the weather varies across the footprint of the AE service area and the …

Scraped at: March 4, 2021, 8:30 p.m.
March 8, 2021

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 23 pages

Versión en español a continuación. Meeting of the Electric Utility Commission March 8, 2021 The Electric Utility Commission is to be held March 8, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance of Sunday, March 7 by Noon. All public comment will occur at the beginning of the meeting. To speak remotely at the Electric Utility Commission meeting, members of the public must: •Call or email the board liaison at 512-322-6505 or Natasha.Goodwin@austinenergy.com no later than noon, Sunday, March 7. The information required is the speaker name, the telephone number they will use to call into the meeting, and their email address (so that the dial-in info may be provided). If speaking on a specific item, residents must indicate the item number(s) they wish to speak on and whether they are for/against/neutral. Speakers on any topic that is not a posted agenda item will be limited to the first 10. •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak; each speaker will have up to three minutes to speak. •Handouts or other information may be emailed to Natasha.Goodwin@austinenergy.com by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch-atxn-live la Reunión del Electric Utility Commission FECHA de la reunion (8 de Marzo 2021) La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (7 de Marzo antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: junta en 504-322-6505 or • Llame o envíe un correo electrónico al enlace de a más tardar al mediodía (el día antes de la reunión). La Natasha.Goodwin@austinenergy.com información requerida es el nombre del …

Scraped at: March 4, 2021, 8:30 p.m.
March 8, 2021

Item 11: Council Action Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Item 14 EUC Report re Council Action March 08, 2021 Item below recommended by EUC October 12; Council to review on date indicated in parenthesis. 11. (3/4) [Purchasing: Various depts; AE’s portion $1,350,000] Authorize award of a multi-term contract with Expert Relocation Services, LLC, to provide citywide moving and relocation services, for up to five years for a total contract amount not to exceed $5,783,500. Items below recommended by EUC January 11; Council to review on date indicated in parenthesis. 8. (3/4) [Purchasing] Authorize negotiation and execution of a cooperative contract with Freeit Data Solutions, Inc., for information technology professional services for the Advance Distribution Management System and Supervisory Control and Data Acquisition Energy Management System , for a term of five years in an amount not to exceed $750,000. 9. (3/4) [Purchasing – Multiple Departments; AE’s estimated portion: $300K] Authorize an amendment to an existing cooperative contract with Insight Public Sector Inc D/B/A Insight Public Sector, to continue the Adobe Enterprise License Agreement and related services, for an increase in the amount of $1,300,000 and to extend the term by three years, for a revised total contract amount not to exceed $1,741,563. 11. (3/4) [Purchasing – Multiple Departments; AE’s estimated portion: $908K] Authorize award of eight contracts for COVID-19 temperature screening services, with InGenesis, Inc.; Arch Staffing and Consulting, LLC; Donald L Mooney Enterprises, LLC; Acadia Workforce Inc.; Protouch Nurses, Inc; Ascend National LLC; Capitol Medical Services, LLC; and First Medical Response of Texas Inc.; each for a term of six months or until the contract amounts are expended in an amount not to exceed $3,700,000, divided among the contractors. Items below recommended by EUC February 8; Council to review on date indicated in parenthesis. 2. (3/4) [Capital Contracting] Authorize negotiation and execution of an amendment to the professional services agreement with Stanley Consultants, Inc., for professional engineering services for the Rainey Street Gas Insulated Switchgear Substation Design (formerly Future Downtown Gas Insulated Switchgear Substation Design) in the amount of $1,436,895, for a total contract amount not to exceed $2,895,895. 3. (3/4) [Capital Contracting] Authorize award and execution of a construction contract with DynaGrid Construction Group, LLC, for Bluff Springs Substation in the amount of $7,407,380.03 plus a $740,380 contingency, for a total contract amount not to exceed $8,148,118.03. 4. (3/4) [Austin Energy] Authorize execution of 10-year extensions to existing electric service franchise agreements for the use of rights-of-way …

Scraped at: March 4, 2021, 8:30 p.m.
March 8, 2021

Items 2-8: Draft RCAs original pdf

Thumbnail of the first page of the PDF
Page 1 of 14 pages

Item 2 Posting Language ..Title Authorize negotiation and execution of a professional services agreement with Stanley Consultants, Inc., (staff recommendation) or one of the other qualified responders for Request for Qualifications Solicitation No. CLMP310 to provide engineering services for Relay and Protection Engineering Services for Electric System Engineering and Technical Services in amount not to exceed $2,935,000. [Note: This contract will be awarded in compliance with City Code Chapter 2-9B (Minority Owned and Women Owned Business Enterprise Procurement Program). The City’s Small and Minority Business Resources Department has determined that no goals are appropriate for this solicitation.] ..Body Lead Department Capital Contracting Office Managing Department Austin Energy Prior Council Action: N/A Fiscal Note Funding is available in the Fiscal Year 2020-2021 Capital Budget of the Austin Energy. Purchasing Language: Staff recommendation is the most qualified firm out of 20 firms evaluated through the City’s qualification- based selection process. For More Information: Inquiries should be directed to the City Manager’s Agenda Office, at 512-974-2991 or AgendaOffice@austintexas.gov. NOTE: Respondents to this solicitation, and their representatives, shall direct inquiries to Rolando Fernandez, 512-974-7749, Beverly Mendez, 512-974-3596, or the Project Manager, Tara Delagarza, 512-505- 7175. Council Committee, Boards and Commission Action: To be reviewed by the Electric Utility Commission on March 8, 2021. Additional Backup Information: The selected firm shall serve as a Relay and Protection Engineering professional consultant and shall provide technical consultation and advice to the Electric System Engineering and Technical Services group of Austin Energy. The firm shall be capable of producing turnkey project and construction drawing packages for engineering and design of existing and new protective relay and control systems for Austin Energy’s transmission, substation, and distribution system. This authorization provides for funding of the above listed services. This request allows for the development of an agreement with the qualified responder that Council awards. If the City is unsuccessful in negotiating a satisfactory agreement with the awarded responder, negotiations will cease with that provider. Staff will return to Council so that Council may award another qualified responder and authorize contract negotiations with that provider. A delay in this award could impact Austin Energy’s ability to keep up with the service demands. TOP RANKED FIRM: Stanley Consultants, Inc., is located in Austin, Texas SECOND RANKED FIRM: HDR Engineering, Inc. is located in Austin, Texas ..Strategic Outcome(s) Strategic Outcome(s): Government that Works for all. Item 3 District(s): District 7 Purchasing Language: Prior …

Scraped at: March 4, 2021, 8:30 p.m.
March 8, 2021

Revised Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Versión en español a continuación. Meeting of the Electric Utility Commission March 8, 2021 The Electric Utility Commission is to be held March 8, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance of Sunday, March 7 by Noon. All public comment will occur at the beginning of the meeting. To speak remotely at the Electric Utility Commission meeting, members of the public must: •Call or email the board liaison at 512-322-6505 or Natasha.Goodwin@austinenergy.com no later than noon, Sunday, March 7. The information required is the speaker name, the telephone number they will use to call into the meeting, and their email address (so that the dial-in info may be provided). If speaking on a specific item, residents must indicate the item number(s) they wish to speak on and whether they are for/against/neutral. Speakers on any topic that is not a posted agenda item will be limited to the first 10. •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak; each speaker will have up to three minutes to speak. •Handouts or other information may be emailed to Natasha.Goodwin@austinenergy.com by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch-atxn-live la Reunión del Electric Utility Commission FECHA de la reunion (8 de Marzo 2021) La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (7 de Marzo antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: junta en 504-322-6505 or • Llame o envíe un correo electrónico al enlace de a más tardar al mediodía (el día antes de la reunión). La Natasha.Goodwin@austinenergy.com información requerida es el nombre del …

Scraped at: March 5, 2021, 11 a.m.
March 8, 2021

Item 9: Memo original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Item 9 MEMORANDUM Electric Utility Commissioners Kerry Overton, Deputy General Manager & Chief Customer Officer March 5, 2021 Customer Assistance Program Overview TO: FROM: DATE: SUBJECT: Given the recent and upcoming discussion of the Customer Assistance Program (CAP), Austin Energy wanted to take this opportunity to convey to the Electric Utility Commission how its discount program works. CAP currently has about 35,000 customers enrolled and serves as a model for similar programs throughout the country. Customers who participate in one of eight state, federal, or local assistance programs can benefit from the City of Austin's CAP utility discounts. The programs include Medicaid, Medical Access Program (MAP), Supplemental Nutrition Assistance Program (SNAP), Veterans Affairs Supportive Housing (VASH), Supplemental Security Income (SSI), Children’s Health Insurance Program (CHIP), Telephone Lifeline Program, and Travis County Comprehensive Energy Assistance program (CEAP). Participants are automatically enrolled when information between social service program enrollments match with an active customer account. This automatic enrollment is a feature of the CAP discount’s design and is one reason why the program is such an effective benefit to our community. Customers who do not participate in one of those eight programs can also apply for the CAP discount and submit income information to validate eligibility based on being at or below 200% of Federal Poverty Level (FPL). Austin Energy’s administration of CAP is done in collaboration with the Discount Steering Committee (DSC), which includes members from local non-profit, government, and faith- based organizations. Our DSC partners work in the administration of benefits to our customers, and they have significant experience serving our vulnerable customer populations. The DSC guides the City on program implementation and structure, providing input on how to best meet our customer needs as efficiently as possible. How does the City screen for customers that may earn more than 200% Federal Poverty Level? As adopted by the Austin City Council in 2012, the Community Benefit Charge fund was created along with automatic enrollment for CAP. This was done to provide simple access for program entry and ensure we can apply discounts to customers as quickly as possible, including those who may not have access to information to inform them of their eligibility or who may have other barriers to access. It is sometimes assumed customers are not income verified, but this is not correct. Participants in the CAP discount program are already income screened as part of the enrollment …

Scraped at: March 8, 2021, 11:30 a.m.
March 8, 2021

Play video original link

Play video

Scraped at: April 16, 2021, 4:30 a.m.
March 8, 2021

Play video original link

Play video

Scraped at: April 16, 2021, 4:30 a.m.
Feb. 8, 2021

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 5 pages

Versión en español a continuación. Meeting of the Electric Utility Commission February 8, 2021 The Electric Utility Commission is to be held February 8, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance of Sunday, February 7 by Noon. All public comment will occur at the beginning of the meeting. To speak remotely at the Electric Utility Commission meeting, members of the public must: •Call or email the board liaison at 512-497-0966 or jeff.vice@austinenergy.com no later than noon, Sunday, February 7. The information required is the speaker name, the telephone number they will use to call into the meeting, and their email address (so that the dial-in info may be provided). If speaking on a specific item, residents must indicate the item number(s) they wish to speak on and whether they are for/against/neutral. Speakers on any topic that is not a posted agenda item will be limited to the first 10. •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak; each speaker will have up to three minutes to speak. •Handouts or other information may be emailed to jeff.vice@austinenergy.com by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch-atxn-live la Reunión del Electric Utility Commission FECHA de la reunion (8 de Febrero 2021) La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (7 de Febrero antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: junta en 512-497-0966 OR • Llame o envíe un correo electrónico al enlace de jeff.vice@austinenergy.com a más tardar al mediodía (el día antes de la reunión). La información requerida es el nombre del …

Scraped at: Feb. 5, 2021, 1:30 a.m.
Feb. 8, 2021

Item 15: Q1FY21 Financial Briefing original pdf

Thumbnail of the first page of the PDF
Page 1 of 28 pages

Austin Energy Quarterly Financial Report 1st Quarter FY 2021 (October – December) Mark Dombroski Chief Financial Officer February 8, 2021 © 2018 Austin Energy Disclaimer This information is unaudited and should be read in conjunction with the audited Comprehensive Annual Financial Reports for the City of Austin, when published on: http://austintexas.gov/service/current-comprehensive-annual-financial-report 2 QUARTERLY Financial Report Agenda Executive Summary Financial Policy Compliance Financial Performance Measures Actual to Budget Analysis Financial Statements Market and Industry Analyses 3 Austin Energy Quarterly Financial Report Executive Summary 4 Executive Summary Substantially compliant with all financial policies. Contingency and Capital Reserve balances below minimums but total cash above minimum of $457m. $ 319 Million Revenues Operating revenues at December are 1.4% under budget due to decreased usage. Generally meeting financial metrics supporting AA credit rating (reaffirmed October 2020). Received credit upgrade from Fitch Ratings in May 2019. $280 Million Expenses Operating expenses are within 1.9% of budget primarily driven by timing of expenses in the first quarter. Balance sheet is liquid and adequately capitalized. Cash decreased $20m due to increased accounts receivable and lower sales. Weather continues to be the major driver for energy consumption. The COVID pandemic has shifted consumption and demand for both residential and commercial customers. This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on www.austintexas.gov/financeonline/finance/main.cfm 5 Austin Energy Quarterly Financial Report Financial Policy Compliance 6 Financial Policy Compliance Financial policies are memorialized and adopted by ordinance each year during the budgeting process Compliance Debt Reserves Operating Non-Compliance Debt Policies Reserves Policies Operating Policies Full Compliance Partial Compliance Full Compliance Contingency and Capital Reserve balance below minimums but total cash above minimum of $457m This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on www.austintexas.gov/financeonline/finance/main.cfm 7 Austin Energy Quarterly Financial Report Financial Performance Measures 8 Financial Performance Measures AA Standard & Poor’s Global Ratings Achieved November 2018 Excessive Liquidity Coverage Efficiency Leverage Deficient Days Cash on Hand Debt Service Coverage Ratio Operating Margins Debt to Capitalization Minimum > 150 Days Minimum > 2.0 Minimum > Minimum < 50% Actual 223 Days Actual 2.0 Actual -4% Actual 53% Excludes General Fund Transfer This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published …

Scraped at: Feb. 7, 2021, 11:30 a.m.
Feb. 8, 2021

Item 16: Utility Bill Relief Update original pdf

Thumbnail of the first page of the PDF
Page 1 of 11 pages

Item 16 City of Austin Utilities COVID-19 Relief Funding Update Kerry Overton Deputy General Manager, Chief Customer Officer Austin Energy 2/08/2021 - EUC © 2018 Austin Energy Agenda • Highlights • Utility Bill Relief Funding (Council approved April 9th)* • Customer Communication • Current Trends • Payment Arrangements • Customer Response • Aging Trends • Next Steps *Utility bill assistance is still available at ww.austinbillhelp.com 2 Austin Energy 2020 Pandemic Response April 2020 Council Approved Utility Bill Relief Funding Disconnections and Late Fees Suspended May – Dec 2020 AustinBillHelp.com launched Multi-channel communication and outreach Engaged with community partners and expanded Plus 1 Current State AustinBillHelp.com still available Late fees resumed to encourage customer contact Austin Energy goals to date have focused on offering utility bill assistance through relief programs and expanded payment options. 3 Utility Bill Relief Funding: COVID-19 As part of COA Utilities’ COVID-19 response, an initial $10M was added in April 2020 to the Plus 1 fund and an additional $10M will be made available in 2021. Plus 1 Funding & Payments (FY2019-2021) 4,500 4,000 3,500 3,000 2,500 2,000 1,500 1,000 500 - 4,293 $1,800,000 3,526 $1,600,000 $1,692,390 $1,186,303 $1,400,000 $1,200,000 $1,000,000 $800,000 $600,000 $400,000 $200,000 $- # Payments $ Funding News releases Monthly Social Media Communications Mass marketing for Austinbillhelp. com Thousands of Direct Letters, Calls, E-mails, and Direct Flyers Communication Efforts Since April 2020 Austin Energy has encouraged customer contact by:  Emphasizing assistance options for residential  Highlighting debt management tools for all  Targeting campaigns for unpaid and accruing large balances In Focus: Marketing communications 5 Payment Arrangement Trends With the availability of a ‘Pandemic PA’ allowing up to 36 months of repayment opportunity and additional assistance funding, we are asking customers to reach us to address increasing aging balances. Monthly Payment Arrangement Allocation (Total # / Total $) s d n a s u o h T s t n e m e g n a r r A t n e m y a P f o r e b m u N s n o i l l i M t n u o m A r a l l o D Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Started AR > 30 Days Last Year (Dec 2019) This Month (Dec 2020) PA Balances PA Count PA …

Scraped at: Feb. 7, 2021, 11:30 a.m.
Feb. 8, 2021

Item 17: 1QFY21 Operations Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 10 pages

Austin Energy Operational Update Q1 FY21 Item 17 Electric Utility Commission Sidney Jackson Chief Operating Officer, Austin Energy February 08, 2021 © 2018 Austin Energy 1 Austin Energy Operational Update Vision Powering a cleaner, brighter future with customer- driven, community-focused solutions. Mission Safely deliver clean, affordable, reliable energy and excellent customer service. Discussion Topics 1. Power Generation & Renewables 2. District Cooling Updates 3. System Reliability 4. Other:  Jan 10th Outage Event in review  Renewable updates 2 Austin Energy Operational Update Performance Commercial Availability & Start Success Generation Resource Target Seasonal Commercial % Availability Decker Steam Units Sand Hill Combined Cycle Fayette Units South Texas Project 95 95 97 100 Commercial Availability Actuals (%) Q4 FY20 AVG Q1 FY21 AVG 89 95 100 100 39 69 97 100 Start Success Simple Cycle Start Success 99 Start Success Target(%) Start Success Actuals (%) Q1 FY21 Q4 FY20 AVG AVG 100 100 3 Net Generation and Load Analysis FY 2021 Q1 Power Generation Cost by Fuel Type Consumption vs. Generation (GWh) 19% 7% 16% 59% 3,134 4,000 3,000 2,000 1,000 0 3,353 440 940 679 1,294 Renewables Coal *Costs include fuel for generation, fuel transportation, renewable Power purchases agreements Nuclear Natural Gas Consumption Generation Renewables Coal Nuclear Natural Gas Historical FY Q1 System Peak Demand (MW) Renewable Power as Percent of Consumption 3,000 2,800 2,600 2,400 2,200 2,000 2,338 2,274 2,238 2,220 2,437 2017 2018 2019 2020 2021 59% Non-renewables Renewables 41% This information is unaudited and should be read in conjunction with the audited Comprehensive Financial Reports for the City of Austin, when published on 4 Renewable Resources Update Renewable Generation as a Percentage of Load 50% 50% 49% 49% 46% 43% 38% 33% 35% 35% 48% 41% Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 5 60% 50% 40% 30% 20% 10% 0% District Energy & Cooling Activities District Cooling Plant #3 (Downtown, Crescent Tract) Constructing 10,000 ton chilled water plant for the Downtown System • Chiller building and cooling towers are complete • Start-up and commissioning of major mechanical and electrical equipment is ongoing • Art in Public Places structure erection is complete • Remaining work: finishing aesthetic façade, site paving, landscaping, and cleanup • On-Target for substantial completion in April 2021 Austin Community College Highland Campus Constructing a 6,000 ton chilled water plant with Thermal Energy Storage • Chillers, switchgear, pump, piping, …

Scraped at: Feb. 7, 2021, 11:30 a.m.
Feb. 8, 2021

Item 18; REACH Update original pdf

Thumbnail of the first page of the PDF
Page 1 of 11 pages

Item 18 2020 REACH Update Electric Utility Commission Briefing Erika Bierschbach VP, Energy Market Operations & Resource Planning February 8, 2021 © 2018 Austin Energy Carbon Reduction - REACH • Reduce Emissions Affordably for Climate Health (“REACH”) incorporates a cost of carbon in the generation dispatch price and reduces generation output during low-margin periods while making resources available for high-margin periods. • Allocate an annual budget amount of approximately 2% of the prior year’s PSA • The savings for 2020 after plan approval was expected to be 1.36 million metric tons • REACH was designed to reduce the utility’s carbon emissions by 30% or approximately 4 million metric tons between now and Austin Energy’s exit from FPP. • Thereafter, the REACH plan is expected to reduce carbon emissions by 8% each year while maintaining the flexibility to protect our customers’ rates in periods of high prices in the wholesale market until achieving zero carbon emissions by 2035. 2 Resource Plan Carbon Emission Forecast vs. REACH CO2 Reduction 5,928,016 MT - CY2020 Resource Plan Carbon Emission Forecast 4,570,050 MT - CY2020 REACH Plan Carbon Emission Forecast DECKER STEAM UNITS RETIRE FPP EXIT ZERO FOSSIL ASSETS (2035 or sooner if economics dictate) 3 2020 Distribution of Price – Resource Plan Forecast v Actual Forecasted Average SPP = $28.36 Actual Average SPP = $21.61 s e c n e r u c c O f o # 1,000 900 800 700 600 500 400 300 200 100 0 4 Model to Market •Resource Plan Forecast - August 2019 • Goals derived from Base Forecast and Assumptions •COVID-19 Impacts Demand for Energy • Crude oil has negative monthly settlement for the first time in history •Natural Gas prices 26% lower than base assumption by ~25% • July NYMEX Natural Gas Settles $1.495 •Extremely mild 2020 Winter and mild end to the summer • 17th coolest September on record (out of 126) 5 NYMEX Natural Gas Daily Settlements $3.00 $2.80 $2.60 $2.40 $2.20 $2.00 $1.80 $1.60 $1.40 $1.20 $1.00 11/1/2019 12/1/2019 1/1/2020 2/1/2020 3/1/2020 6 LZ_AEN 15 Minute Real-time SPP ~ 97% of the intervals were below $30 per MWH s e c n e r u c c O f o # 450 400 350 300 250 200 150 100 50 0 7 Overall REACH Performance Resource Plan Forecast Emissions Economic (Tonnes) Emissions Actual (Tonnes) Emission Reduction (Tonnes) Percentage Below Forecast Total Coal 5,928,010 …

Scraped at: Feb. 7, 2021, 11:30 a.m.
Feb. 8, 2021

Item 19: Council Action Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Item 19 EUC Report re Council Action February 08, 2021 Items below recommended by EUC October 12; Council to review on date indicated in parenthesis. 11. (2/18) [Purchasing: Various depts; AE’s portion $1,350,000] Authorize award of a multi-term contract with Expert Relocation Services, LLC, to provide citywide moving and relocation services, for up to five years for a total contract amount not to exceed $5,783,500. Items below recommended by EUC January 11; Council approved on date indicated in parenthesis. 2. (1/27) [Capital Contracting] Authorize award and execution of a construction contract with Santa Clara Construction, Ltd.(MBE), for the Decker Dam Slough Repair project in the amount of $1,322,546 plus a $132,254.60 contingency, for a total contract amount not to exceed $1,454,800.60. 3. (2/4) [Purchasing] Authorize negotiation and execution of a contract with DNV GL USA, Inc., to provide a utility asset management software solution, maintenance and support, for a term of ten years in an amount not to exceed $800,000. 4. (2/4) [Purchasing] Authorize negotiation and execution of a multi-term contract with Power Cost, Inc., to provide market operations and settlement cloud solutions and related services, for up to 12 years for a total contract amount not to exceed $6,600,000. 5. (2/4) [Purchasing] Authorize award of a multi-term contract with High Tech Engineering Inc, to provide underground utility locating services, for up to five years for a total contract amount not to exceed $9,500,000. 6. (2/4) [Purchasing] Authorize an amendment to an existing contract with Mitsubishi Electric Power Products Inc, to provide a gas-insulated switchgear and related services, for an increase in the amount of $800,000, for a revised total contract amount not to exceed $6,800,000. 7. (2/4) [Austin Energy] Authorize expenditures for annual renewals of professional dues and memberships in national and state associations and organizations related to the electric utility industry, in an amount not to exceed $510,822. 10. (2/4) [Austin Energy] Authorize the negotiation and execution of a thirty six-month lease agreement with 726 LLC for a 6.685 acre portion of 8405 N. Lamar Blvd. more particularly described as Lot 3-B Amended Plat of Re-subdivision of Lot 3 CBP Commercial Subdivision, a subdivision recorded in Volume 87, Page 179A of the Plat Records of Travis County, Texas; and Lots 4 & 5, CBP Commercial Subdivision, a subdivision recorded in Volume 84, Page 109C of the Plat Records of Travis County, Texas for a temporary construction laydown yard …

Scraped at: Feb. 7, 2021, 11:30 a.m.
Feb. 8, 2021

Items 2-14: Draft RCAs original pdf

Thumbnail of the first page of the PDF
Page 1 of 25 pages

Item 2 Posting Language ..Title Authorize negotiation and execution of an amendment to the professional services agreement with Stanley Consultants, Inc., for professional engineering services for the Rainey Street Gas Insulated Switchgear Substation Design (formerly Future Downtown Gas Insulated Switchgear Substation Design) in the amount of $1,436,894.58, for a total contract amount not to exceed $2,895,894.58. [Note: This amendment was awarded in compliance with City Code 2-9B (Minority Owned and Women Owned Business Enterprise Procurement Program). Current participation to date is 30.64% MBE and 15.96% WBE.] ..Body Lead Department Capital Contracting Office Managing Department Austin Energy Fiscal Note Funding is available in the Fiscal Year 2020-2021 Capital Budget of Austin Energy. Purchasing Language: Original contract was awarded through a qualifications-based selection process. Prior Council Action: December 7, 2017 – Council approved a professional services agreement with Stanley Consultants, Inc. for the Future Downtown Gas Insulated Switchgear Substation Design. For More Information: Inquiries should be directed to the City Manager’s Agenda Office, at 512-974-2991 or AgendaOffice@austintexas.gov. NOTE: Respondents to this solicitation, and their representatives, shall direct inquiries to Rolando Fernandez, 512-974-7749, Beverly Mendez, 512-974-3596, or the Project Manager, Tara Delagarza, 512-505- 7175. Council Committee, Boards and Commission Action: To be reviewed by the Electric Utility Commission on February 8, 2021. November 13, 2017 - Recommended by the Electric Utility Commission on a 7-0 vote, with Commissioners Fath and Hadden absent, and with two vacancies. Additional Backup Information: A new substation is needed at City-owned property at 806 ½ Lambie Street to serve recent Central Business District development and potential redevelopment along the Waller Creek area. The 35 kV network circuits in the Waller Creek area are now supplied out of the Seaholm and Brackenridge substations, which are unable to support the anticipated demand and load growth. Developing this new substation is critical before the Downtown area is fully developed. Additionally, this new substation will support load transfers necessary to complete upgrades at the Brackenridge substation as well as facilitate the conversion of some of the 69 kV facilities in this area to 138 kV operations. The original solicitation intended to encompass all professional engineering phase services through post construction services. Upon execution of the original contract, it became evident that Austin Energy’s estimated contract value was insufficient and additional authorization would be required. With more than 60% of the design phase complete, Austin Energy is confident in forecasting the remaining engineering …

Scraped at: Feb. 7, 2021, 11:30 a.m.
Feb. 8, 2021

Play video original link

Play video

Scraped at: March 1, 2021, 8 p.m.
Feb. 8, 2021

Approved Minutes original pdf

Thumbnail of the first page of the PDF
Page 1 of 3 pages

Electric Utility Commission February 8, 2021 Minutes The Electric Utility Commission (EUC) convened a regularly scheduled meeting via videoconference/Webex. Meeting called to order by Chair Hopkins at 1:05 p.m. Also present were Commissioners Boyle, Hadden, Reed, Stone, Trostle, Tuttle and Weldon. Commissioners Ferchill, Funkhouser and Wray were absent. Chair Hopkins recognized and thanked Commissioner Boyle for his service, as this is his final meeting. CITIZEN COMMUNICATION: GENERAL – Paul Robbins re Customer Assistance Program 1. APPROVAL OF MINUTES – Approve minutes of the January 11, 2021 regular meeting. Motion (Trostle) to approve minutes; seconded (Tuttle); passed on a vote of 8-0, with Commissioners Ferchill, Funkhouser and Wray absent. NEW BUSINESS – CONSENT ( ) = Target Council Meeting Date; [ ] = RCA Type Items 2-4, 6-9, and 11 – 13 unanimously recommended on consent (8-0, with Commissioners Ferchill, Funkhouser and Wray absent). Following discussion, the following items were recommended on a vote of 8-0, with Commissioners Ferchill, Funkhouser and Wray absent: Item 5: motion (Tuttle) to recommend; seconded (Reed)    Item 10: motion (Weldon) to recommend; seconded (Hadden) Item 14: motion (Reed) to recommend; seconded (Weldon) 2. (2/18) [Capital Contracting] Authorize negotiation and execution of an amendment to the professional services agreement with Stanley Consultants, Inc., for professional engineering services for the Rainey Street Gas Insulated Switchgear Substation Design (formerly Future Downtown Gas Insulated Switchgear Substation Design) in the amount of $1,436,895, for a total contract amount not to exceed $2,895,895. 3. (2/18) [Capital Contracting] Authorize award and execution of a construction contract with DynaGrid Construction Group, LLC, for Bluff Springs Substation in the amount of $7,407,380.03 plus a $740,380 contingency, for a total contract amount not to exceed $8,148,118.03. 4. (2/18) [Austin Energy] Authorize execution of 10-year extensions to existing electric service franchise agreements for the use of rights-of-way within other municipalities within the Austin Energy service territory, maintaining the payment amount of three percent of gross electric revenues from customers within each municipality. 1 5. (2/18) [Austin Energy and Austin Water] Approve an ordinance amending the fiscal year 2020-2021 budgets of Austin Water and Austin Energy to appropriate up to $10,000,000 for the utilities’ Plus-One payment assistance programs. 6. (3/4) [Purchasing] Authorize negotiation and execution of a contract with RecordPoint Software USA LLC, to provide Records365 enterprise electronic records management software solution, for a term of five years for a total contract amount not to …

Scraped at: April 16, 2021, 4:30 a.m.
Jan. 11, 2021

Agenda original pdf

Thumbnail of the first page of the PDF
Page 1 of 4 pages

Versión en español a continuación. Meeting of the Electric Utility Commission January 11, 2021 The Electric Utility Commission is to be held January 11, 2021 with Social Distancing Modifications Public comment will be allowed via telephone; no in-person input will be allowed. All speakers must register in advance of Sunday, January 10 by Noon. All public comment will occur at the beginning of the meeting. To speak remotely at the Electric Utility Commission meeting, members of the public must: •Call or email the board liaison at 512-497-0966 or jeff.vice@austinenergy.com no later than noon, Sunday, January 10. The information required is the speaker name, the telephone number they will use to call into the meeting, and their email address (so that the dial-in info may be provided). If speaking on a specific item, residents must indicate the item number(s) they wish to speak on and whether they are for/against/neutral. Speakers on any topic that is not a posted agenda item will be limited to the first 10. •Once a request to speak has been made to the board liaison, the information to call on the day of the scheduled meeting will be provided either by email or phone call. •Speakers must call in at least 15 minutes prior to meeting start in order to speak, late callers will not be accepted and will not be able to speak. •Speakers will be placed in a queue until their time to speak; each speaker will have up to three minutes to speak. •Handouts or other information may be emailed to jeff.vice@austinenergy.com by noon the day before the scheduled meeting. This information will be provided to Board and Commission members in advance of the meeting. •If this meeting is broadcast live, residents may watch the meeting here: http://www.austintexas.gov/page/watch-atxn-live la Reunión del Electric Utility Commission FECHA de la reunion (11 de Enero 2021) La junta se llevará con modificaciones de distanciamiento social Se permitirán comentarios públicos por teléfono; no se permitirá ninguna entrada en persona. Todos los oradores deben registrarse con anticipación (10 de Enero antes del mediodía). Todos los comentarios públicos se producirán al comienzo de la reunión. Para hablar de forma remota en la reunión, los miembros del público deben: junta en 512-497-0966 OR • Llame o envíe un correo electrónico al enlace de jeff.vice@austinenergy.com a más tardar al mediodía (el día antes de la reunión). La información requerida es el nombre del …

Scraped at: Jan. 8, 2021, 8:50 p.m.
Jan. 11, 2021

Item 12: AE Weatherization Programs Update original pdf

Thumbnail of the first page of the PDF
Page 1 of 16 pages

Austin Energy Weatherization Programs For Limited Income Customers January 11, 2021 Electric Utility Commission Sarah Chatterjee, Terry Moore & Manny Garza © 2018 Austin Energy Agenda Overview Pandemic Impacts Single Family Weatherization Multi-Family Weatherization 2 Weatherization Programs Cumulative Overview • Programs have served customers for over 38 years • Over 20,000 unique single family homes and 12,000 apartments weatherized at no cost to customer/owner • 137,000 apartments weatherized in standard program • Focus on continuous improvement and inclusion Augmented annually by* • ~187, 500 point of sale discounts at 70 retail locations • 4,800 education kits to Title 1 students • 1,376 S.M.A.R.T. units • Energy alerts • Solar for limited income customers *FY20 unaudited 3 Weatherization Measures Energy Assessment Attic Insulation Home Envelope Sealing Duct Sealing / Replacement Solar Screens Smart Thermostats Energy Star Appliances Lighting AC Tune-Up Partner with Neighborhood Housing, Home Repair Coalition 4 Pandemic Impacts • Health and safety of customers, employees and contractors is essential • Unable to weatherize interior spaces for 4 months • Early FY20 multifamily results helped • Used time to focus on program enhancements, order PPE, update field procedures • Virtual inspections, benefits Programs Shutdown 3/16/20 External Work 5/5/20 Vacant Apt. Units 7/7/20 Reopening 7/20/20 PPE: Personal Protective Equipment 5 Weatherization Program Criteria • Energy Star Program • Home size of ≤ 2,500 sq.ft. • Home value of ≤ $300,000 • Up to $7,500 of free home improvements • Single Family to Four-Plex/Condo/Mobile Home • Owner or Renter Over 60% of our residential customers rent 6 Weatherization Program Enhancements • Enhanced Eligibility = Increased Inclusion FY20 200% FPL* $52,400 Multiple pages FY21 80% MFI** $78,100 1 page Income Verification Income Documentation Required Self Attestation Income Threshold Income Amount*** Application * Federal Poverty Level ** Median Family Income *** Family of Four • A/C Rebate & Loan Changes • Lowered qualifying credit score • Up to $950 rebate • Velocity Credit Union loans up to $10,000 at 0% interest/120 months 7 Program Enhancement Results In just over a month! • Fiscal Year 2020 • Goal of 527 Homes • 246 Homes Weatherized, will carry over budget to FY21 • Fiscal Year 2021 • Kick-off email sent • 200 applications returned • Continue to receive 1 to 2 per day • 3 Rebate and Loan applications already 250 200 150 100 50 0 3.5 2.5 1.5 3 2 1 0 0.5 200 3 …

Scraped at: Jan. 8, 2021, 8:50 p.m.
Jan. 11, 2021

Item 13: EV Infrastructure and Program Update original pdf

Thumbnail of the first page of the PDF
Page 1 of 18 pages

Transportation Electrification Program Update Electric Utility Commission Karl Popham Manager, Electric Vehicles & Emerging Technologies Cameron Freberg Utility Strategist, Electric Vehicles & Emerging Technologies January 2021 © 2018 Austin Energy Agenda 1. Program Overview 2. Austin’s EV metrics 3. FY20 Highlights • DC Fast charging rollout City fleet infrastructure • • Heavy Duty / Cap Metro electrification EV readiness for commercial buildings • Climate Equity Plan update • Equity & Inclusion “EVs are for EVeryone” • EV online buyer’s guide • “Customer Moment” • 2 Electric Vehicles Electric Vehicles & Emerging Technologies Team & Emerging Tech Team EVisionary City of the Year 2020 Electric Drive 2020 Utility Industry Spotlight Award Positive Charge (Electrification) EVs for Schools Austin SHINES Plug-in America EV Utility of the Year 3 Austin Energy EV Customer Programs • Plug-In EVerywhere™ Driver Program • $4.17/mo unlimited charging at all 1000+ Level-2 ports for members • New $0.21/min DC Fast charging connection • Plug-In EVerywhere™ Infrastructure Rebate Program • Up to $1,200 rebate for home Level-2 wi-fi enabled ($900 non wi-fi) • Up to $4,000 rebate for commercial/public Level-2 stations • Up to $10,000 rebate for public DC Fast stations • Fleet & Public Infrastructure Pilot Tariff • New optional EV infrastructure commercial tariff promotes efficiency and high usage • EV360 Pilot • EVs for Schools • Flat rate of $30/mo for off peak home charging + Plug-In EVerywhere • EV charging stations for staff, students, parents, and visitors • New - curriculum is now available online nationally and in Spanish • E-Ride Program Up to $400 rebate from the purchase of electric bikes, includes individuals and bike fleet applications l r e n e w a b e w n d p o w e r i P o w e r e d B y G r e e n C h o c e ® i 1 0 0 % Akins High School teacher, Jay H., plugs in his EV at an “EVs for Schools” charging station 4 DC Fast Infrastructure Rollout FY20 26 new DC Fast at 9 Locations DC Fast Hubs - Texas TCEQ Alt Fuels Grant Supported Host / Site Address # Stations PARD-AISD Saltillo-Whole Foods 2001 W Cesar Chavez St. 905 East 5th St. Electric Drive 811 Electric Dr. Mueller Market 1801 E 51st St. Village at Westlake 701 S Capital of Texas DC Fast Stations Travis County 700 Lavaca Sr. …

Scraped at: Jan. 8, 2021, 8:50 p.m.
Jan. 11, 2021

Item 14: Council Action Report original pdf

Thumbnail of the first page of the PDF
Page 1 of 2 pages

Item 14 EUC Report re Council Action January 11, 2021 Items below recommended by EUC October 12; Council to review on date indicated in parenthesis. 11. (TBD) [Purchasing: Various depts; AE’s portion $1,350,000] Authorize award of a multi-term contract with Expert Relocation Services, LLC, to provide citywide moving and relocation services, for up to five years for a total contract amount not to exceed $5,783,500. Items below recommended by EUC October 12; Council approved on date indicated in parenthesis. 4. (11/12) [Purchasing] Authorize negotiation and execution of a contract with Atlas Copco Compressors LLC, for preventative maintenance and repair services for air compressors, for a term of five years in an amount not to exceed $440,000. 5. (11/12) [Purchasing] Authorize award of a multi-term contract with Absolute Testing Services Inc, to provide installation, repair and testing of electrical systems for up to five years for a total contract amount not to exceed $1,500,000. 6. (11/12) [Purchasing] Authorize award of a multi-term contract with KBS Electrical Distributors Inc, to provide substation signs, for up to five years for a total contract amount not to exceed $550,000. 7. (11/12) [Purchasing] Authorize negotiation and execution of three multi-term contracts with Asplundh Tree Expert LLC, Davey Tree Surgery Co, and Wright Tree Service, Inc, to provide vegetation management services on distribution energized lines, each for up to five years for total contract amounts not to exceed $85,000,000 divided among the contractors. 8. (11/12) [Purchasing] Authorize award of a multi-term contract with Techline Inc. for vacuum interrupter switches, for up to five years for a total contract amount not to exceed $3,518,000. 9. (11/12) [Capital Contracting Office] Authorize award and execution of a construction contract with T. Morales Company Electric & Controls, for Domain District Cooling Plant (DCP) switchgear replacement in the amount of $3,659,000 plus a $548,850 contingency, for a total contract amount not to exceed $4,207,850. 10. (11/12/) [Purchasing: Various depts; AE’s portion $564,000] Authorize award of a contract with Victor Pena D/B/A Pena’s Traffic Services, LLC (MBE), to provide rental of temporary traffic control devices and roadway pavement marking services, for a term of two years in an amount not to exceed $3,280,000. Items below recommended by EUC November 9; Council approved on date indicated in parenthesis. 2. (12/3) [Purchasing – multiple departments; AE’s portion approximately $9.7M] Authorize an amendment to an existing contract with Nalco Company LLC D/B/A Nalco Company, for …

Scraped at: Jan. 8, 2021, 8:50 p.m.
Jan. 11, 2021

Items 2 - 11: Draft RCAs original pdf

Thumbnail of the first page of the PDF
Page 1 of 19 pages

Item 2 Posting Language ..Title Authorize award and execution of a construction contract with Santa Clara Construction, LTD (MBE), for the Decker Dam Slough Repair project in the amount of $1,322,546 plus a $132,254.60 contingency, for a total contract amount not to exceed $1,454,800.60. [Note: This contract will be awarded in compliance with City Code Chapter 2-9A (Minority Owned and Women Owned Business Enterprise Procurement Program) by meeting the goals with 93.27% MBE and 1.87% WBE participation.]. ..De Lead Department Capital Contracting Office Managing Department Austin Energy Fiscal Note Funding is available in the Fiscal Year 2020-2021 Capital Budget of Austin Energy. Purchasing Language: Lowest responsive bid of three bids received through a competitive Invitation for Bid solicitation. For More Information: Inquiries should be directed to the City Manager’s Agenda Office, at 512-974-2991 or AgendaOffice@austintexas.gov. NOTE: Respondents to this solicitation, and their representatives, shall direct inquiries to Rolando Fernandez, 512-974-7749, Garrett Cox, 512-974-9423, or the Project Manager, Richard Duane 512-482-5435. Council Committee, Boards and Commission Action: To be reviewed by the Electric Utility Commission on January 11, 2021. Additional Backup Information: During a standard Dam Safety Inspection required by the Texas Commission on Environmental Quality, staff discovered sloughing soil and vegetation on the Decker Dam as well as underground piping and failed underdrains that require repair. The work for this project consists of the complete construction of approximately 27,000 cubic yards of embankment slough repair with associated topsoil and seeding, sealing of approximately 2,770 linear feet of concrete joints, replacing approximately 4,500 linear feet of toe drain, repair of irrigation system, removal of vegetation and debris from drainage ditches, abandonment of an inclinometer, and replacing a cap on the gate hoist. The construction for this project will be entirely within the limits of the dam but access to the dam will be through the Walter E. Long Park. The Parks and Recreation Department has been consulted on this project and measures will be in place to ensure the safety of all park users. Due to the potential for unknown issues and conditions, a 10% contingency in funding has been included to allow for the expeditious processing of any change orders. A contingency is an additional amount of money added to the construction budget to cover any unforeseen construction costs associated with the project. By authorizing the additional contingency funding, Council is authorizing any change orders within the contingency amount. The …

Scraped at: Jan. 8, 2021, 8:50 p.m.