Codes and Ordinances Joint CommitteeOct. 19, 2022

SOS: Brodie Oaks PUD superiority table — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 17 pages

Brodie Superiority Table Brodie site superiority is anchored in our commitment to a robust set of performance standards. At the foundation of these standards is a commitment to several third-party sustainability rating system certifications, including: 1. U.S. Green Building Council (USGBC) LEED Neighborhood Development (LEED ND) Integrate LEED ND into interdisciplinary site design and systems selection. a. Track development-wide performance using latest applicable version of the LEED ND. b. c. Gather letter of support from USGBC now to submit in support of the PUD application. d. Commit to full LEED ND submission after PUD approval. Brodie is formally registered with LEED ND as of 9/22/2021. 2. U.S. Green Building Council (USGBC) SITES a. Track site design performance using latest applicable version of the SITES. Integrate SITES into interdisciplinary site design and systems selection. b. 3. Austin Energy Green Building (AEGB) Star Rating System a. Track and Certify each building to meet 3-star minimum requirement utilizing the applicable version of the Commercial Rating system. Aspire to 4-stars. b. Tracking all buildings on-site utilizing the AEGB Commercial OR Multi-family Rating system. c. Build regular touchpoints with Austin Energy as partnership in advancing missions and finding increased opportunities for shared benefit. 4. Other Third-Party Rating Systems a. In early design of residential building projects, the design teams will be encouraged to explore PassiveHouse, a process and protocol for low-energy construction standard. b. Brodie is also exploring WELL Building and Community Standards. Administered by the International Well Building Institute, these systems support health and well-being across all aspects and areas of building design and construction and community life. In addition to pursuing third-party sustainability rating system certifications, Brodie has established a customized set of goals and objectives for the project. This will embrace the critical environmental aspects of the site in its South Austin context, advance equity, resilience, and climate mitigation as core imperatives, and accelerate City and community-level planning efforts. PUD Tier 1 Topic Ecology - We meet the highest environmental and ecological standards. Ecology | Objective A. Expand Access to the Barton Creek Greenbelt. Open Space PUD Tier 2 PUD Submittal - April 30, 2021 2.3.1.C: Provide a total amount of open space that equals or exceeds 10 percent of the residential tracts, 15 percent of the industrial tracts, and 20 percent of the nonresidential tracts within the PUD. Application to Brodie: Provides open space at least 10 percent above the requirements of Section 2.3.1.A. (Minimum Requirements). Alternatively, within the urban roadway boundary established in Figure 2 of Subchapter E of Chapter 25-2 (Design Standards and Mixed Use), provide for proportional enhancements to The project is providing – 11.6 acres of open space which is equivalent to 45 percent of the developed area (nearly 1.5 times the amount of open space required to satisfy Tier 2). Nearly 8.1 acres of open space is located adjacent to the Barton Creek Greenbelt creating a 100' to 300' buffer between the existing Barton Creek Greenbelt and the new development (Land Use Area 1). Brodie is proposing to blend new open space into the existing Barton Creek Greenbelt by restoring 6 percent of new open space in Trailhead Overlook Park (1.0 acres) using the Hill Country Revegetation standard. Another 60 percent (1.0 acres) will be restored to native prairie. The restoration of these areas will include removal of the existing surface parking and wall and returning the area back to natural grades and revegetating with native and adaptive plants. This work may require cuts that exceed 4’ along the edge of the property in order to take down the wall which is up to 20’ in some areas. + Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 1 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 1 Development Tracts: 26.0 20 percent: 5.2 acres PUD Tier 2 existing or planned trails, parks, or other recreational common open space in consultation with the Director of the Parks and Recreation Department. Application to Brodie: Requirement for Tier 1: 5.2 acres With 10 percent increase: 7.8 acres Buffer from Existing Barton Creek Greenbelt Revegetation PUD Submittal - April 30, 2021 This open space will include: An intentional trailhead to the Barton Creek Greenbelt and Violet Crown Trail including trail access, wayfinding, and interpretive materials, as well as access to parking and restrooms. This exceeds the vision set forth by the City of Austin Trails Master Plan, Austin Parks and Recreation Lone-Range Plan, Sidewalk Master Plan and Bicycle Path. Fifty parking spaces reserved for park users and constructed durin phase I of park development. All spaces will be located within structured garages at full build-out. Water quality to meet SOS standards, beneficial reuse, ponds and reirrigation area; Restored woodland, savannah, and prairie; Habitat for birds, insects, amphibians, and reptiles; Extensive landscaping throughout; Interpretive materials throughout; Active trails; Nature play; Active Recreation; and A commitment to maintain all open space in perpetuity. Developed area is clustered in areas 100’ to 300’ away from the Barton Creek Greenbelt. Most of the Brodie site has been highly disturbed since prior to the adoption of the Hill Country Roadway Overlay. Brodie will remove approximately 36 percent of the existing buildings, surface parking areas and other impervious improvements that currently cover the site and restore those portions of the site adjacent to the Barton Creek Greenbelt back to a naturalized grade, minimizing the need for existing or new retaining walls. The overall site impervious cover will be reduced to a maximum 56.4 percent impervious - a 36 percent reduction from current conditions. Brodie is proposing to blend new open space into the existing Barton Creek Greenbelt by restoring 6 percent of new open space in Trailhead Overlook Park (1.0 acres) using the Hill Country Revegetation standard. Another 6 percent (1.0 acres) will be restored to native prairie. The restoration of these areas will include removal of the existing surface parking and wall and returning the area back to natural grades and revegetating with native and adaptive plants. This work may require cuts that exceed 4’ along the edge of the property in order to take down the wall which is up to 20’ in some areas. There are no natural or constructed channels on-site. + + NA NA Uses natural channel design techniques as described in the Drainage Criteria Manual. Removes existing impervious cover Channel Design CWQZ Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 2 of 17 PUD CASE #: C814-2021-076006 There are no Critical Water Quality Zones on the site. Brodie Superiority Table Topic PUD Tier 1 PUD Submittal - April 30, 2021 Riparian Restoration Drought/Fire Tolerance Ecology | Objective B. Decrease Impervious Cover. Impervious Cover (percent of net site area) There are no Critical Water Quality Zones on the site. Open space totaling 8.1 acres is located adjacent to the Barton Creek Greenbelt. Most developed area is clustered in areas 100’ to 300’ away from the Barton Creek Greenbelt. The ordinance speaks to how to design buildings that are within 50’ of existing fuel hazards. On the Brodie site, buildings are all greater than 50’ from existing fuel. Restoration of the open space will consider defensible space. Brodie will reduce total impervious cover from approximately 86 percent net site area to a maximum impervious cover of 56 percent net site area, a 36 percent reduction, and comply with the Save Our Springs (SOS) Ordinance standards for non-degradation of water quality. Brodie is proposing to modify the maximum impervious cover allowed by the SOS Ordinance. We understand that this code modification will require a super majority vote of the City Council. Proposed Maximum Impervious Cover is 56 percent net site area. Open Space totaling 11.6 acres is located adjacent to the Barton Creek Greenbelt. Impervious cover is clustered in areas 100’ to 300’ away from the Barton Creek Greenbelt. PUD Tier 2 from the Critical Water Quality Zone. Restores riparian vegetation in existing, degraded Critical Water Quality Zone areas. Reduces impervious cover by five percent below the maximum otherwise allowed by code or includes off-site measures that lower overall impervious cover within the same watershed by five percent below that allowed by code. Clusters impervious cover and disturbed areas in a manner that preserves the most environmentally sensitive areas of the site that are not otherwise protected. Provides porous pavement for at least 20 percent or more of all paved areas for non- pedestrian in non- aquifer recharge areas. Provides porous pavement for at least 50 percent or more of all paved areas limited to pedestrian use. Porous Pavement (Non-aquifer Recharge) Porous Pavement (All Paved Areas) The project will not be requesting this superiority item due to its location over the Edwards Aquifer and within the Barton Springs Watershed which both restrict direct infiltration of stormwater The project will not be requesting this superiority item due to its location over the Edwards Aquifer and within the Barton Springs Watershed which both restrict direct infiltration of stormwater Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 3 of 17 PUD CASE #: C814-2021-076006 NA + + - - Brodie Superiority Table Topic PUD Tier 1 PUD Submittal - April 30, 2021 Ecology | Objective C. Improve the Quality of Stormwater Runoff and Recharge. Water Quality Treatment (Off-Site) There are no off-site areas draining to the site. However, currently 6.25 acres of the site (63 percent of which is impervious cover) drains directly into the Barton Creek Greenbelt. In the planned conditions, impervious cover will not drain off-site, but instead through approved water quality treatment facilities. NA + + + + This site has an existing impervious cover of 86 percent and this application proposes to both reduce the impervious cover to 56 percent net site area and comply with the SOS water quality standards. Brodie is meeting the SOS Ordinance pollutant load removal requirements through green water quality controls such as rainwater harvesting and retention-irrigation. In addition, the Brodie PUD is also using the rainwater captured to meet cooling tower makeup water and conventional landscape irrigation demands. The Brodie PUD will also use air condition condensate wastewater to supplement the rainwater supply. This site has an existing impervious cover of 86 percent net site area and this application proposes to both reduce the impervious cover to 56 percent net site area and comply with the SOS water quality standards. The Brodie PUD proposes to treat 100% of the water quality volume using green water quality controls, which will include all or some of the following methods: 1) Retention/Irrigation 2) Retention/Infiltration 3) Cooling Tower Makeup water 4) Conventional Irrigation In addition, the Brodie PUD is also use air condition condensate to supplement the rainwater supply. The Brodie Oaks PUD is located in the Barton Springs Zone and is located over the Edwards Aquifer. The SOS Ordinance requires that the first water quality control be lined (to not infiltrate into the Aquifer) and as such cannot infiltrate into the ground. This Tier 2 option allowing direct stormwater runoff from impervious surfaces to a landscaped area is contrary to the SOS requirement. However, the Brodie Oaks PUD will comply with the Tier 2 reuse option by collecting rooftop rainwater and A/C condensate wastewater for reuse in traditional landscaping irrigation purposes and cooling tower makeup water. Brodie is committed to satisfying this Tier 2 requirement through the methods described above Brodie will provide a rooftop rainwater harvesting system that will serve not less than 50 percent of the landscaped areas where irrigation is required. PUD Tier 2 Provides water quality treatment for currently untreated, developed off-site areas of at least 10 acres in size. Provides water quality controls superior to those otherwise required by code. Uses green water quality controls as described in the Environmental Criteria Manual to treat at least 50 percent of the water quality volume required by code. Directs stormwater runoff from impervious surfaces to a landscaped area at least equal to the total required landscape area. Provides rainwater harvesting for landscape irrigation to serve not less than 50 percent of the landscaped areas. Code section. Water Quality Treatment (On-Site) Water Quality Treatment (On-Site) Stormwater Runoff Primary Irrigation Source Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 4 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table PUD Tier 1 Topic Flood Detention/R etention Floodplain Modification Waterway and CEF Setbacks Drainage Upgrades (Off-Site) PUD Submittal - April 30, 2021 The Brodie PUD is proposing a significant reduction of impervious cover such that the uncontrolled storm flows at all points leaving the site are less than they were in the existing condition, as such no on- site detention is required. Please reference the drainage report submitted with the original PUD application titled “Brodie Oaks Redevelopment Drainage Study” dated April 2021. There are no floodplains on the site, so no floodplain modifications are necessary. There are no waterways on-site. Nevertheless, the developed area is clustered in areas 100’ to 300’ away from the Barton Creek Greenbelt. The project is requesting a modification to the CEF buffer around Airman’s cave. According to analysis performed by Nico Hauwert (Airman’s Cave Hydro Study 2021), the cave is approximately 140’ below the surface. The project is requesting an encroachment into the CEF buffer for the purpose of subsurface parking garages or ponds and structural supports of up to 80’ with the condition that at minimum 20’ of Del Rio Clay remains between any encroachment and the vertical extent of the cave. In addition, a spring was discovered within 150’ of the existing developed site. Brodie will be removing existing impervious cover from this area in order to restore the site to natural grades as such we are proposing to encroach approximately 50’ for the purpose of restoring grades and removing existing impervious cover. No upgrades are needed for the off-site pond and infrastructure due mainly to the fact that impervious cover dropped 36 percent and the new SOS retention/irrigation and rainwater harvesting systems on-site reduced the overall stormwater flow significantly to existing facilities downstream, capturing and retaining 100 percent of the water quality event. Existing stormwater infrastructure meets Atlas 14 drainage criteria. PUD Tier 2 Provides volumetric flood detention as described in the Drainage Criteria Manual. Proposes no modifications to the existing 100-year floodplain. Provides minimum 50-foot setback for at least 50 percent of all unclassified waterways with a drainage area of 32 acres. Provides at least a 50 percent increase in the minimum waterway and/or critical environmental feature setbacks required by code. Provides drainage upgrades to off-site drainage infrastructure that does not meet current criteria in the Drainage or Environmental Criteria Manuals, such as storm drains and culverts that provide a public benefit. Ecology | Objective D. Enhance Environment Approaches for Building and Site Design. Carbon Impact Statement Since 2017, Carbon Impact Statements have been required for PUDs. The Carbon Impact Statement is envisioned as advisory in nature and is not intended to trigger any formal development requirements. Brodie has committed to 9 points or greater Carbon Impact Statement which is considered “Demonstrated Leadership” on the projects carbon impact. Brodie will use Central Texas seed stock native and with adequate soil volume. In addition, Brodie is proposing to blend new open space into the existing Barton Creek Greenbelt by restoring 1-acre in Trailhead Tree Species List Tree plantings use Central Texas seed stock native and Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 5 of 17 PUD CASE #: C814-2021-076006 +/- + + + + + Brodie Superiority Table Topic PUD Tier 1 Non- Protected Trees (Up to 18.9”) Protected Trees (19 – 23.9”) Heritage Trees (greater than 24”) Green Building Program 2.3.1.D: Comply with the City's Planned Unit Development Green Building Program. PUD Tier 2 with adequate soil volume. Preserves 75 percent of all the native caliper inches. Preserves 75 percent of the caliper inches associated with native protected size trees. Preserves all heritage trees on- site. Provides a rating under the Austin Green Building Program of three stars or above. PUD Submittal - April 30, 2021 Overlook Park using the Hill Country Revegetation standard. Another 1-acre will be restored to native prairie. The restoration of these areas will include removal of the existing surface parking and wall and returning the area back to natural grades and revegetating with native and adaptive plants. Brodie is preserving 77% of all trees meeting preservation criteria that are up to 18.9 caliper inches. This includes the relocation of 4 trees into the newly created parkland on-site. Brodie is preserving 79% of all protected trees meeting preservation criteria. This includes the relocation of 10 trees into the newly created parkland on-site. Brodie is also committed to implementing a tree care plan identified in the arborist report to maintain the health of trees that are planned to be preserved in the ultimate development. Brodie has intentionally designed the site to preserve stands of significant trees in place. Brodie commits to preserving all heritage trees on-site and meeting the heritage tree ordinance. This includes the relocation of 6 trees into the newly created parkland on-site. Brodie will track and certify each building to meet 3-star minimum requirement utilizing the applicable version of the Commercial Rating system at the time of design and aspire to 4-stars. Brodie will provide a dependable, low-carbon and adaptable energy strategy for the new development. Working closely with partners at Austin Energy, Brodie team aims to find optimal energy solutions at building-, site- and district-scale. At building scale, the Brodie design aims to optimize passive design strategies through building orientation and massing and façade design to find right balance of thermal performance and access to daylight and views. The project will investigate Passive House design for the residential towers. Building will drive efficiency through high- performance systems, looking towards radiant cooling and heating and energy recovery. Although the team will investigate building-scale renewable options for the building, the team sees full potential, while balancing other roof-top and façade options, to be less than 3 percent of the total site energy. At site scale, the Brodie team is exploring phased centralized district cooling and heating alternatives, heat recovery chillers and various thermal storage alternatives. Through partnerships with Austin Energy, the Brodie team is aiming to provide the right power supply, grid-tied solution, and demand management programs to optimize the grid as it adapts to growth in the South Austin area. Brodie is committed to bird-friendly architecture and design and are currently researching national best practices. Brodie will meet or exceed the landscaping requirements. Specifically, the Brodie team will restore the native woodland and prairie to portions of the site. Brodie is proposing to blend new open space into the existing Barton Creek Greenbelt by restoring 6 percent of new open space in Trailhead Overlook Park (1.0 acres) using the Hill Country Revegetation standard. Another 6 percent (1.0 acres) will be + + + + + + Bird-Friendly Building Design Grow Green Landscaping 2.3.1.H: Exceed the minimum landscaping requirements of the City Code. Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 6 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 1 PUD Tier 2 Place - We create a dynamic and diverse mixed-use destination that expresses the character of South Austin. Place | Objective A. Deliver Transit-Supportive Densities within Walking Distance of the Transit Stop. Building Height and Density Place | Objective B. Define Expectations for an “Activity Center in an Environmentally Sensitive Area”. Art PUD Submittal - April 30, 2021 restored to native prairie. The restoration of these areas will include removal of the existing surface parking and wall and returning the area back to natural grades and revegetating with native and adaptive plants. This work may require cuts that exceed 4’ along the edge of the property in order to take down the wall which is up to 20’ in some areas. A double allée of street trees will be provided on the north side of the main Internal Circulator Route which will be dedicated as a public easement. The addition of this second row of trees increases the total area of the “Planting Zone” from 16 feet for the street section to 21 feet, an addition of 5’ of planting area. Brodie provides transit-supportive densities within walking distance of the high-capacity MetroRapid Route 803 transit stop as called for in Imagine Austin Comprehensive Plan. Considerations include: 20-75+ jobs/acre within walking distance of transit stop is ideal for transit supportive densities according to a study in the Transportation Research Record. The plan has 54 jobs/acre in our development. The requested height is critical to achieving this density of jobs. 50 - 75 DU/acre within walking distance of transit stop is ideal for transit supportive densities according to the City of Austin TOD ordinance. The plan has 54 DU/acre in our development. This is on the low end of this range. The requested height is critical to achieving this density of housing units. TOD’s approved in the city are allowing 360’ heights and the Brodie team is asking for much less. The site is not visible from Barton Creek. The Brodie team has documented in photographs the entire trail and the bed of the creek. Brodie anticipates an artful and vibrant environment within open spaces and streetscapes and has identified a minimum of two locations for the incorporation of locally sourced public art. See Exhibit I: Brodie Art Master Plan. Brodie will commit to a minimum of $50,000 in art installations. Brodie will commit to a minimum of $25,000 that will be spent on art installations in Phase I See Exhibit I: Brodie Art Master Plan. Brodie will commit to 10,000SF of the planned retail space at 60% of market rents for artists. Lease rates will return to market rate and general retail use 60 days after efforts are made to market the lease to artists. The Economic Development Department and Economic Development Corporation will be notified of available discounted leases. Brodie will provide a performance pavilion in the Central Green. Brodie will design the Park Street and Central Green to accommodate festivals and/or markets. Brodie will encourage existing on-site businesses such as the grocery store and food and beverage establishments to become part of the new development. As Barshop and Oles has successfully done in their retail spaces throughout the city, other local businesses will be + + + Provides art approved by the Art in Public Places Program in open spaces, either by providing the art directly or by contributing to the City’s Art in Public Places Program or a successor program. Provides space at affordable rates to one or more independent retail or restaurant small Local Small Business Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 7 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 1 PUD Tier 2 businesses whose principal place of business is within the Austin metropolitan statistical area. Place | Objective C. Create a Vibrant Public Realm. Accessibility Great Streets 2.3.2.A: Comply with Chapter 25-2, Subchapter E (Design Standards and Mixed Use). Provides for accessibility for persons with disabilities to a degree exceeding applicable legal requirements. Complies with City's Great Streets Program, or a successor program. Applicable only to commercial, retail, or mixed-use development that is not subject to the requirements of Chapter 25-2, Subchapter E (Design Standards and Mixed Use). Sidewalks and Building Placement 2.3.2.B: Inside the urban roadway boundary depicted in Figure 2, Subchapter E of Chapter 25-2 (Design Standards and Mixed Use), follow the sidewalk standards in Section 2.2.2., Subchapter E, Chapter 25-2 (Core Transit Corridors: Sidewalks and Building Placement) + + + PUD Submittal - April 30, 2021 encouraged to become part of the new development. Brodie is committing to 25% of the retail space reserved for local businesses. Brodie will provide a superior level of accessibility on the site including the addition of ADA accessible sidewalks on all streets and shared use paths within the park space. Please see Exhibit E- Brodie Transportation Plan. The dimensions shown were based on the recently approved Transportation Criteria Manual but adjusted based on guidance from national expert Jeff Speck. The roadways in the Brodie plan are not public so there is no requirement here. The plan meets or exceeds Subchapter E- Great Streets Standards, with the following modifications: • • • The Clear Zone in the Code calls for 14’ total across the street section. The Brodie plan is providing 25’ total across the street section of pedestrian and raised bicycling space. The Planting Zones in the Code calls for 16’ total across the street section, whereas the Brodie plan provides 21’ total across the street section. The plan has also increased the overall number of planting zones from 2 to 3, therefore the site will have 30 percent more trees. All utilities will be located underground. Please see Exhibit E- Brodie Transportation Plan. Pedestrian and bicycle safety and enjoyment is paramount to Brodie. The following strategies were employed: Sidewalks, pedestrian clear zones, planting areas and supplemental zones will meet or exceed requirements associated with Core Transit Corridors and Internal Circulation Routes. Enhanced shade will be provided in the form of street trees or shade structures on all streets and a double row of trees on one side of the street will create superior shade elements. Brodie will construct all back of curb improvements including bicycle and pedestrian accommodations and transit stop improvements compliant with the South Lamar Blvd 2016 Mobility Bond plan requirements and dedicate any space, right-of-way, or easement, necessary for such improvements. A public access easement will be provided for all private streets within the site. Brodie will provide pedestrian and bicycle connection to adjacent residential development such as the Retreat at Barton Creek. All buildings will have direct pedestrian connections from entrances to adjacent streets. Brodie will provide an intentional trailhead to the Barton Creek Greenbelt and Violet Crown Trail including trail access, wayfinding, and interpretive materials, as well as access to parking and restrooms. Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 8 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 1 PUD Tier 2 PUD Submittal - April 30, 2021 This exceeds the vision set forth by the City of Austin Trails Master Plan, Austin Parks and Recreation Lone-Range Plan, Sidewalk Master Plan and Bicycle Path. The project team is in conversations with the Save Barton Creek Association, Hill Country Conservancy and other trail building entities and will seek any applicable code modifications as may be required in order to provide a trail connection from the project to the regional trail system. The project is currently working with local organizations like the Save Barton Creek Association to explore how the project can support the ongoing maintenance of a trail connection to the Barton Creek and regional Violet Crown trail systems. The high-capacity MetroRapid Route 803 transit stop will be integrated into the project. All curb cuts will be placed on side streets to allow for greatest pedestrian movement on S. Lamar Boulevard and the Internal Circulator Route. Connections between the site and adjacent arterials and highways occur no more frequently than every 400 feet. At least 80 percent of the provided parking is underground or within a parking structure. Additional improvements will be encouraged in buildings such as shower and locker facilities for employees and increased indoor bicycle parking. Brodie will have approximately 140,000 square feet of retail and restaurants. These will be primarily focused on the Central Green and the Internal Circulation Route. The remaining frontages on the Internal Circulator Route, Park Street and main entrances will be activated with residential uses that have main entrances oriented onto the street, individual unit entrances and stoops, art, amenity space, plazas, or other active uses. Brodie is modifying aspects of Subchapter E to respond to specific site conditions and will ultimately provide a building design that meets and exceeds the design standards of Section 3.3.2 Subchapter E. Brodie will design at least 75 percent of the building frontage of all parking structures along the Internal Circulator Route for pedestrian oriented uses. In addition, even upper floors of the parking structure will be wrapped with land uses to limit views of parking garage façade from the Internal Circulator Route. Special treatments such as false facades, vertical art or green walls will be utilized on parking garages visible from Loop 360 and S. Lamar Boulevard to enhance the aesthetic of the site. Brodie will provide solar power shading devices in parking lots. +/- + + Pedestrian Uses on Ground Floor 2.3.2.C: Contain pedestrian- oriented uses as defined in Section 25-2-691(C) (Waterfront Overlay District Uses) on the first floor of a multi- story commercial or mixed-use building. Building Design Parking Structure Frontage Exceeds the minimum points required by the Building Design Options of Section 3.3.2. of Chapter 25- 2, Subchapter E (Design Standards and Mixed Use). In a commercial or mixed-use development, at least 75 percent of the building frontage of all parking structures is designed for pedestrian-oriented uses as defined in Section 25-2-691(C) Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 9 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 1 Parkland Dedication PUD Tier 2 (Waterfront Overlay District Uses) in ground floor spaces. PUD Submittal - April 30, 2021 Total Parkland Required: 29.6 acres Total Minimum Parkland Provided: 7.6 acres (See Parkland Credit Calculations) Remainder is in Fee-in-Lieu Other: The original Barton Creek Plaza development dedicated approximately 84.3-acres of parkland in 1981 to the City of Austin. After including the additional 7.6 acres of credited Private Parkland from the current project, the total parkland contribution is 91.9 acres, which is 57 percent of the total original 167-acre Barton Creek Plaza Development site. To be considered "superior development," land proposed for dedication must: (1) include at least 10.4 credited acres per 1,000 residents, which reflects the combined citywide level-of-service for neighborhood, greenway, and district parks (This amount exceeds by one acre the parkland dedication required under City Code § 25-1-602(E) that is based on a lower citywide level-of-service and includes only neighborhood parks and greenbelts.); (2) be developed in accordance with a plan approved by PARD; and (3) be dedicated to a governmental entity. (C)The 15 percent cap on parkland dedication in the urban core delineated in City Code § 25-1-602(J) does not apply to PUDs or PIDs for determining superiority. Parkland Development Brodie will develop, operate, and maintain all open space on-site. Brodie is committing to exceed the 2021 Park Development Fee by $700 for both residential and hotel units. Other: The Brodie project has committed to Exhibit D- Brodie Park and Open Space Plan as well as Exhibit H- Brodie Phasing Plan. Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 10 of 17 PUD CASE #: C814-2021-076006 + + Brodie Superiority Table Topic PUD Tier 1 PUD Tier 2 Public Facilities 2.3.1.G: Provide for public facilities and services that are adequate to support the proposed development including school, fire protection, emergency service, and police facilities. + PUD Submittal - April 30, 2021 The project is currently working with local organizations like the Hill Country Conservancy, Save Barton Creek Association, and Austin Parks Foundation to explore how the project can support the construction and ongoing maintenance of a trail connection to the Barton Creek and regional Violet Crown Trail systems. The project will strive towards achieving SITES Silver Certification for Parks. As an infill project, the improvements in Brodie will provide increased tax revenue to the City on an ongoing basis without adding any new land into its service area, helping fund public services in this area and across the City. This will help pay for additional expenditures approved by voters in recent years including Project Connect and the Corridor Program. Brodie proposes to include the following public facilities: 1) 11.6 acres of developed parkland expanding the Barton Creek Greenbelt and adding a new trailhead to enhance access to this destination space; 2) A variety of new private streets with public access easements and trails achieving connectivity for all modes of transportation and including a lively, attractive pedestrian and bicycle environment; expanding and connecting open spaces to and along the Barton Creek Greenbelt; 3) Implementation of an activity center and community destination in South Austin with active and passive recreational opportunities; 4) A new location and enhancement to the high-capacity MetroRapid Route 803 transit stop along S. Lamar Boulevard including an upgraded bus stop, shady, wide sidewalks from the bus stop to the core of the development, transit supportive densities and mixed-use development. 5) Brodie recognizes the need for an additional fire station in this service area to improve response times to acceptable levels and serve the additional residences proposed with this PUD. Brodie also recognizes that the best location for an additional station may be in an area with better access. Therefore, the project has updated the superiority table to commit to the following: b. a. Assist AFD in securing an alternate location for a fire department that best serves the area; or If no alternative site is located prior to the issuance of a certificate of occupancy for Block 9, accommodate a Fire station that meets AFD specifications within this building or an alternative location on-site as agreed upon by the project and AFD. Place | Objective D. Express the Culture of Southwest Austin. Neighborhoo d Plans and 2.3.1.E: Be consistent with applicable There are no applicable neighborhood plans, neighborhood conservation combining district regulations, historic areas, or landmark regulations for the property. The site is within the S. Lamar + Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 11 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic Historic Compatibility PUD Tier 2 PUD Tier 1 neighborhood plans, neighborhood conservation combining district regulations, historic area, and landmark regulations, and compatible with adjacent property and land uses. 2.3.1.K: Protect, enhance, and preserve areas that include structures or sites that are of architectural, historical, archaeological, or cultural significance. Architectural , historical, cultural, and archeological areas Historic Preservation + + PUD Submittal - April 30, 2021 Boulevard Combined Neighborhood Planning Area (Barton Hills) which does not have a City Council approved neighborhood plan. Brodie has placed compatible land uses (i.e., parks) adjacent to the adjoining Barton Creek Greenbelt and higher heights and densities adjacent to surrounding highways. Most developed area is clustered in areas 100’ to 300’ away from the Barton Creek Greenbelt. Preserves historic structures, landmarks, or other features to a degree exceeding applicable legal requirements. There are no identified historic structures or landmarks on this site. Brodie will provide an intentional trailhead to the Barton Creek Greenbelt and Violet Crown Trail, which is of cultural significance, including trail access, wayfinding, and interpretive materials, as well as access to parking and restrooms. This exceeds the vision set forth by the City of Austin Trails Master Plan, Austin Parks and Recreation Lone-Range Plan, Sidewalk Master Plan and Bicycle Path. The construction of a formal and universally accessible trailhead may reduce the pressure on other informal access points in neighborhoods and under MoPac (Loop 1) so that they may be redesigned to mitigate for community and environmental impacts. Provides bicycle facilities that connect to existing or planned bicycle routes or provides other multi-modal transportation features not required by code. Brodie will provide a series of bicycle facilities for all types of users along the private streets with public access easements and will provide a shared use path adequate for recreational cycling that will connect through the site and to off-site trail networks. All private streets within the project will be within a public access easement. Pedestrian and bicycle safety and enjoyment is paramount to Brodie. The following strategies were employed: Sidewalks, pedestrian clear zones, planting areas and supplemental zones will meet or exceed requirements associated with Core Transit Corridors and Internal Circulation Routes. Shade will be provided in the form of street trees or shade structures on all streets. A Shared Use Path and sidewalk along S. Lamar Boulevard will be built to Core Transit Corridor standards. A public access easement will be provided for all private streets within the site. Brodie will provide pedestrian and bicycle connection to adjacent residential development such as the Retreat at Barton Creek. All buildings will have direct pedestrian connections from entrances to adjacent streets. Brodie will provide an intentional trailhead to the Barton Creek Greenbelt and Violet Crown Trail including trail access, wayfinding, and interpretive materials, as well as access to parking and restrooms. This exceeds the vision set forth by the City of Austin Trails Master Plan, Austin Parks and Recreation Lone-Range Plan, Sidewalk Master Plan and Bicycle Path. Connection - We link the site to its surroundings and create more access to the site for all. Connection | Objective A. Prioritize Walking and Bicycling Modes of Transportation. Transportati on Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 12 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 1 PUD Tier 2 Connection | Objective B. Make Strong Connections to Public Transit. Connectivity 2.3.1.I: Provide for appropriate transportation and mass transit connections to areas adjacent to the PUD district and mitigation of adverse cumulative transportation impacts with sidewalks, trails, and roadways. PUD Submittal - April 30, 2021 The high-capacity MetroRapid Route 803 transit stop will be integrated into the project. Internal utility lines will be in drive aisles or Internal Circulation Routes, rather than under parking areas. All curb cuts will be placed on side streets to allow for greatest pedestrian movement on S. Lamar Boulevard and the Internal Circulator Route. Connections between site and adjacent arterials and highways occur no more frequently than every 400 feet. At least 80 percent of the provided parking is underground or within a parking structure. Additional improvements will be encouraged in buildings such as shower and locker facilities for employees and increased indoor bicycle parking. Brodie will deliver an attractive, walkable, and sustainable development pattern around the existing high-capacity MetroRapid Route 803 transit stop that maximizes Capital Metro's system ridership and offers Austin residents ample vibrant housing choices and convenient access to jobs, services, and diverse amenities. Improvements will include an enhanced bus stop; compact, mixed-use development; public realm improvements such as shade, street furniture, pedestrian-scale lighting; pedestrian and bicycle connections and enhanced crossings; sidewalk improvements; and wayfinding – all recommendations from Capital Metro's TOD Priority Tool that identifies the Brodie Oaks Station as an opportunity for redevelopment as a Transit Oriented Development around the existing high-capacity transit stop. In addition, the project will help implement the improvements along S. Lamar Boulevard identified by the Corridor Program Office extending city investments to the intersection of S. Lamar Boulevard and Loop 360. The Transportation Impact Analysis is underway and will identify off- site improvements required by the development. Brodie will provide a Traffic Demand Management Plan that will identify techniques intended to reduce single-occupancy trips to the site by a minimum of 25 percent and encourage more transit ridership on Capital Metro’s high-capacity MetroRapid Route 803 transit stop located adjacent to the site on S. Lamar Boulevard. The final trip reduction numbers will be determined through the TDM Process. + + + Connection | Objective C. Embrace High-Quality Vehicular Connections That Serves Need While Encouraging Other Modes. Gated Roadways Brodie will prohibit gated roadways and provide a public access easement on all private streets and parks. 2.3.1.J: Prohibit gated roadways. Connection | Objective D. Create an Intentional Trailhead to the Barton Creek Greenbelt. Provides publicly Trailhead accessible multi-use Along Creek trail and greenway or along creek or Waterways waterway. Brodie will provide an intentional trailhead to the Barton Creek Greenbelt and Violet Crown Trail including trail access, wayfinding, and interpretive materials, as well as access to parking and restrooms. This exceeds the vision set forth by the City of Austin Trails Master Plan, Austin Parks and Recreation Lone-Range Plan, Sidewalk Master Plan and Bicycle Path. Climate - We build resiliency and work towards a zero-carbon, zero-water, and zero-waste development. Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 13 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table PUD Tier 1 Topic Climate | Objective A. Build a Reliable, Efficient, Low-Cost and Adaptable Energy Network. Energy Strategy PUD Submittal - April 30, 2021 PUD Tier 2 Climate | Objective B. Treat Water as a Precious Resource. Water Strategy Climate | Objective C. Maximize the Potential of Waste Networks. Waste Reduction Brodie will provide a dependable, low-carbon and adaptable energy strategy for the new development. Working closely with Austin Energy, the Brodie team aims to find optimal energy solutions at building-, site- and district-scale. At building scale, the Brodie design aims to optimize passive design strategies through building orientation and massing and façade design to find right balance of thermal performance and access to daylight and views. The project will investigate PassiveHaus design for the residential towers. Building will drive efficiency through high-performance systems, aggressively pursuing energy efficiency measures. At site scale, the Brodie team is exploring phased centralized district cooling and heating system, heat recovery chillers and various thermal storage alternatives. Through on- site solar generation with battery back-up generation, the project is seeking to deploy distributed energy resources to make the site more resilient. Through collaboration with Austin Energy, the Brodie team is aiming to provide the right power supply, grid-tied distribution, and demand management programs to balance the grid as it adapts to growth in the South Austin area. Brodie, in alignment with the WaterForward plan, will provide building and site solutions that treat water as the valuable resource it is. The Project will implement the following three measures: 1. The project will capture rooftop rainwater from the water quality event for beneficial use in cooling-towers and traditional landscape irrigation. 2. The building will provide low-flow and efficient fixtures to reduce demand beyond minimum requirements in the Austin Energy Green Building star rating system. 3. We will collect condensate wastewater generated by air condition systems to further offset potable water usage. The combination of these measures will conserve a significant amount of potable water. Managing material flows and minimizing waste to landfill are critical parts of Brodie. From site-wide aspects of materiality South Austin authenticity to low-embodied energy materials and practices, the Brodie team aims to create a thoughtful, local, and environmental responsive development. The design teams will be encouraged to utilize Life Cycle Assessment (LCA) to evaluate structural solutions, materiality and finishes that reduce embodied energy and are optimized through construction and fabrication processes. Waste management will be managed to highest levels during construction as well as into operation, with thoughtful waste storage, collection, and recycling of materials. Due to the anticipated high volumes of organic waste, Brodie also aims to provide comprehensive organic collection for off-site compositing. + + + + Community - We create a community of residents, workers and visitors that prioritize health and well-being. Community | Objective A. Provide a Range of Housing Options for All Income Levels and Ages. Affordable Housing The project is proposing to meet the 10% of bonus area square footage requirement for affordable housing and to incorporate all units on site. Affordable housing units generated from residential bonus area will be dispersed throughout the site and all affordable housing units generated from non-residential bonus area will be accommodated in a standalone Foundation Communities According to Chapter 25-2, Subchapter B, Division 5 (Planned Unit Development Ordinance), the Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 14 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 1 PUD Submittal - April 30, 2021 development. Additional detail has been provided with a new Exhibit C: Brodie Land Use Plan (Page 3 and 4) PUD Tier 2 baseline affordable housing requirement for PUD developments is included below: The required affordable Rental units must be equal to 10 percent of the bonus area square footage. The required affordable Ownership units must be equal to 5 percent of the bonus area square footage. For non-residential developments, $7 per square foot of bonus area may be paid in lieu of on-site development of affordable units. Community | Objective B. Improve and Protect Air Quality. Air Quality Community | Objective C. Protect Access to Quality Food. Access to Food Community | Objective D. Improve Community Health Indicators. Community Health Brodie will thrive to ensure highest quality of indoor and outdoor environments. Ventilation systems will be designed to provide increased quantities of outdoor air while air monitoring systems will ensure balance of air quality with the development’s aggressive energy reduction targets. Natural ventilation will be explored in design phases for applicable spaces. Beyond building ventilation, source control is critical. The Brodie team aims to prioritize healthy products and embrace the Healthy Products Declaration (HPD) standard. In addition, the construction teams will manage the potential of hazardous contaminants into the building during construction. Ensuring access to healthy and affordable food is critical to Austin’s sustainability and resiliency. The Brodie team aims to work with all restaurants, supermarkets, and retailers to ensure a wide range of affordable, healthy, local, and sustainable food options. The Brodie team embraces the work of the City’s Office of Sustainability and 2018 State of the Food System Report, namely, to increase sales of locally produced food and expand access to fresh, healthy, and affordable food for everyone, and reduce the amount of wasted food. The development is exploring the implementation of a weekly local produce delivery program available on an elective basis to employees or residents of the building as well as a local produce purchasing policy for the buildings’ restaurants, cafés, and cafeterias. As a development of this size, scale, and influence, The Brodie team has an opportunity and a responsibility to meaningfully contribute to a healthier Austin for all. Brodie will work through design and operations utilizing the WELL Building and Community standards to ensure health and well-being are front and center to shape our built environments. The Brodie team will also look to city-wide tracking + + + Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 15 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 1 PUD Tier 2 Community | Objective E. Increase Digital Connectivity. Digital Connectivity Other General General Complies with current City of Austin Code instead of asserting entitlement to follow older code provisions by application of law or agreement. 2.3.1.A: Meet the objectives of the City Code. 2.3.1.F: Provide for environmental preservation and protection relating to air quality, water quality, trees, buffer zones and greenbelt areas, critical environmental features, soils, waterways, topography, and the natural/traditional character of the land. PUD Submittal - April 30, 2021 efforts such as the work done through the city. Health indicators in the Austin area are dependent on a variety of social, economic, and geographic factors. Brodie aims to ensure these factors are being communicated to our tenants and actively working to advance positive outcomes with respect to overall physical and mental health, chronic diseases, and access to health insurance. Brodie thrives for equitable access to open space, art, culture, and community amenities and programs. This commitment bridges both the built as well as the digital worlds. The Brodie team aims to ensure a high-quality digital network providing equitable connectivity to tenants and visitors. Also, the Brodie team believes that informed citizens make empowered citizens for change. The Brodie team aims to leverage our collected data as well as local public data in open and accessible platforms for public consumption. Brodie is complying with current City of Austin Code except where modified by this PUD. Brodie provides for superior environmental preservation and protection by: • • • • • • • • • Reducing impervious cover from 85 percent net site area to 56 percent net site area. Complying with SOS water quality standards. Eliminating the nearly 6 acres of untreated runoff from buildings and parking currently draining directly into the Barton Creek Greenbelt. Dedicating approximately 11.6 acres (approximately 1/3) of site as active public open space/parkland. Designating 10 percent of the “bonus” area of both residential and nonresidential square feet for affordable housing on-site regardless of ownership or for rent. Constructing a designated trailhead and connection to the Barton Creek Greenbelt with signage, trash disposal, and parking. Creating a shared-use path for approximately 2,500 feet and extending from S. Lamar Boulevard to the Park Road that will run along the park’s edge and be used for mobility and recreation. Providing transit supportive densities of jobs and residences within walking distance of the new Capital Metro transfer station. Concentrating density at the designated Imagine Austin Comprehensive Plan Activity Center and high-capacity transit stop. + + + + General 2.3.1.B: Provide for development standards that Brodie will provide for the preservation and enhancement of the natural environment within and immediately adjacent to the subject property, along the Barton Creek Greenbelt. The restoration of these areas will include removal of the existing surface parking and wall and Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 16 of 17 PUD CASE #: C814-2021-076006 Brodie Superiority Table Topic PUD Tier 2 PUD Submittal - April 30, 2021 returning the area back to natural grades and revegetating with native and adaptive plants. Brodie is a high-quality, mixed-use development promoting innovative design in keeping with the South Austin character. The plan will offer a live, work and play environment and will undoubtedly become a beloved South Austin gathering place. Brodie will provide a dense mixed-use development transforming approximately 21-acres acres of surface parking lots and drive aisles and approximately 8-acres of single use office and retail buildings to a vibrant neighborhood and destination for South Austin. Brodie will reduce greenhouse gases by providing a true transit- oriented development taking advantage of Capital Metro’s adjacent bus stop for the MetroRapid route number 803. The project will construct a new high-capacity MetroRapid Route 803 transit stop that meets or exceeds Capital Metro’s requirements and integrate the stop into the development by providing comfortable waiting areas, easy access for bicycles and pedestrians, and urban amenities. The density and height proposed for Brodie enable the project to meet the vision established in Imagine Austin Comprehensive Plan of an “Activity Center for Redevelopment in Sensitive Environmental Areas” including state-of-the-art development practices to improve stormwater retention and water quality flowing into the Edwards Aquifer Recharge Zone and Barton Creek Zone. Brodie will provide an environmentally superior project that complies with the SOS Water Quality Standards. PUD size and uniqueness At 37.6 acres, Brodie exceeds the 10-acre minimum. + Superior + SUBMITTAL DATE: June 15, 2022 + /- Partial Superiority - No Superiority Page 17 of 17 PUD CASE #: C814-2021-076006 PUD Tier 1 achieve equal or greater consistency with the goals in Section 1.1 (General Intent) than development under the regulations in the Land Development Code. Section 1.1 says, “This division provides the procedures and minimum requirements for a planned unit development (PUD) zoning district to implement the goals of preserving the natural environment, encouraging high quality development and innovative design, and ensuring adequate public facilities and services. The Council intends PUD district zoning to produce development that achieves these goals to a greater degree than and that is therefore superior to development under conventional zoning and subdivision regulations.” 2.3.1.L: Include at least 10 acres of land, unless the property is characterized by special circumstances, including unique topographic constraints.