Bond Oversight CommissionSept. 18, 2024

Backup — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 6 pages

Fire Department RENOVATION DEFINITION IT IS IMPORTANT FOR US TO DEFINE TWO DIFFERENT LEVELS OF RENOVATION : RENOVATION LEVEL I – SCOPE OF WORK IS LIMITED TO THE REMOVING OF ASBESTOS AND LEAD CONTAMINANTS, UPGRADING HVAC SYSTEMS, RENEWING MECHANICAL DUCTING SYSTEMS, UPGRADING LIGHTING/FIXTURES FOR MORE ENERGY EFFICIENCY, MODERNIZING ALERTING SYSTEMS WHICH AID IN SLEEP AND REST CYCLES, RE-CONDITIONING KITCHEN CABINETS, COSMETIC RENEWAL FOR BAYS AND COMMON AREAS, UPGRADING PLUMBING FIXTURES FOR EFFICIENCY AND WATER-SAVING, SEWER LINE RECONDITIONING, REPLACING WATER HEATERS, CONVERTING ELECTRICAL TO GAS APPLIANCES WHEN POSSIBLE, REPLACING WINDOWS FOR ENERGY EFFICIENT GLAZING AND FRAMES, INSULATING AND SEALING DOORS. RENOVATION LEVEL II – THE SCOPE OF WORK IS LIMITED TO ALL ITEMS LISTED IN LEVEL I WITH THE ADDITION OF RE-STRUCTURING OF THE STATION LAYOUT INCLUDING THE ALTERATION OF STRUCTURAL ELEMENTS TO ACCOMMODATE MODERN TRAFFIC PATTERS AND LIVING SPACE INTERACTION. LEED INTEGRATION THE CITY OF AUSTIN RECOMMENDS A SILVER LEED CERTIFICATE. CERTIFICATE STANDARDS ARE AS FOLLOWS: ENERGY: CORE PERFORMANCE, ENERGY CODE COMPLIANCE, AIR BARRIER AND OPAQUE ENVELOPE PERFORMANCE, LIGHTING CONTROLS, MECHANICAL EQUIPMENT EFFICIENCY REQUIREMENTS, DOMESTIC HOT WATER SYSTEM EFFICIENCY. HEALTH: INDOOR AIR QUALITY, SAFE INTERIOR PAINTS AND COATINGS, FURNITURE AS WELL AS INSULATION PRODUCTS, ADHESIVES AND SEALANTS, OCCUPANT ACCESS TO DAYLIGHT AND GLARE REDUCTION, ASBESTOS AND LEAD ABATEMENT, OCCUPANT COMFORT VERIFICATION AND ACTION PLAN, OCCUPANT THERMAL CONTROLS, NO CARPET, ACCESS TO OPERABLE WINDOWS, OCCUPANT LIGHTING CONTROL, ACOUSTICS. MATERIALS: BUILT-IN RECYCLING CENTER, BUILD FOR DURABILITY AND MINIMIZE MATERIAL USAGE, WASTE MANAGEMENT, MAINTAIN EXISTING STRUCTURE 70% (LEVEL I) 85% (LEVEL II). LAND: MINIMAL LANDSCAPE - UPKEEP RETAINING WELLS, SEWER SYSTEMS AND GENERAL APPEARANCE OF STATION. WATER: HIGH EFFICIENT FLUSHING VALVES, LOW FLOW FAUCETS AND SHOWER HEADS. RENOVATION IS NECESSARY TO ACHIEVE THE SILVER LEED CERTIFICATION. Fire Department 2018 Bond Update  2018 Bond Proposition “F” TimeLine: ( as defined in contract with Voters) 8 years $13.0 Million  Committed Renovations / Repairs as of 09/04/24 $11.2 Million 86%  Future Planned Projects For FY 25- 26 $ 1.8 Million 14% Fire Station 15 Renovation Level I 829 Airport Blvd  Scope Highlights Include:  Replaced flooring  Upgrade Incoming Electrical Power and Replace Main Electrical Panels  Refresh paint and ceiling  Add New Kitchen Hood and Ansul System Bringing Station Up to Fire Code.  Kitchen refresh  Replace HVAC Equipment and Windows with Energy Efficient Options. Fire Station 18 Renovation Level II Early Demo 6311 Berkman Drive Scope Highlights Include: After •Raise Truck Bay Entrance Clearance to 12’-6” For Accommodating New Engines. •Upgrade Incoming Electrical Power and Replace Main Electrical Panels •Build New CTM Room in the Truck Bay and Run New Underground Incoming Fiber Cable. •Add New Kitchen Hood and Ansul System Bringing Station Up to Fire Code. •Upgrade Gas Meter for 2 New Tankless Water Heaters and Future Generator. •Add Overhead Door & Canopy for New Exercise Area. •Replace HVAC Equipment and Windows with Energy Efficient Options.