ITEM03 PRESENTATION LA ZONING — original pdf
Backup

Environmental Considerations for Austin’s Lakes Presented to: Board of Adjustment June 9, 2025 John Clement Environmental Conservation Program Manager ITEM03/1-PRESENTATIONLAKE AUSTIN - Finding the Balance • Drinking Water • Residential • Commercial • Boating/Marina • Parkland • Fishing • Passive Recreation ITEM03/2-PRESENTATIONEnvironmental Issues Zebra Mussels Bank Erosion Shoreline Erosion Poor Shoreline Habitat Non-Complying Structures Compliance/Work Without Permits Wave Impacts ITEM03/3-PRESENTATIONRiparian Zone Functions A robust shoreline vegetative community improves water quality, prevents erosion, and aids in flood control. Trees & deep-rooted plants prevent erosion. Dense shoreline development degrades shoreline health. ITEM03/4-PRESENTATIONPoor Riparian Function VS Good Riparian Function Poor Functioning Well Functioning ITEM03/5-PRESENTATIONCosts of Degraded Water Quality ▪ Water treatment costs due to suspended sediment ▪ Algae proliferations ▪ Poor fishery ▪ Lowered Austin Lake Index scores in ▪ Habitat ▪ Invertebrates ▪ Vegetation ITEM03/6-PRESENTATIONEnvironmental Review • Site plan & Subdivision compliance with LDC 25-8 Subchapter A • Boat docks/shoreline modifications/shoreline access require site plans • DSD environmental review staff • CWQZ compliance • Erosion controls • Restoration • Cut/Fill • WPD environmental review staff • CEF setbacks • Bulkheads • Dredging • Land capture/fill in the lake • Floodplain modifications & restoration (riparian functioning) ITEM03/7-PRESENTATION§ 25-8-261(C) – Critical Water Quality Zone CWQZ on all lakes: - The CWQZ is a buffer that restricts the type and intensity of development near waterways - 75’ from shoreline (492.8 msl) for single family - 100’ for all other uses Trams Stairs Gangways ITEM03/8-PRESENTATION§ 25-8-261(C) – Critical Water Quality Zone Unpermitted fill in lake (1) A dock, bulkhead or marina, and necessary access and appurtenances, are permitted in a critical water quality zone subject to compliance with Chapter 25-2, Subchapter C, Article 12 (Docks, Bulkheads, and Shoreline Access). (2) A retaining wall, bulkhead, or other erosion protection device may not capture or recapture land from a lake unless doing so is required to restore the shoreline to whichever of the following boundaries would encroach the least into the lake: (1) the shoreline as it existed 10 years prior to the date of application, with documentation as prescribed by the Environmental Criteria Manual; or (2) the lakeside boundary of the subdivided lot line. (3) A bulkhead may be replaced in front of an existing bulkhead once, if: (1) the existing bulkhead was legally constructed; and (2) construction of the replacement bulkhead does not change the location of the shoreline by more than 6 inches; and (3) the director of the Watershed Protection Department determines that there is no reasonable alternative to replacement of the bulkhead in the location of the existing bulkhead. (4) The director may approve less than 25 cubic yards of dredging in a lake if the dredging is necessary for navigation safety. ITEM03/9-PRESENTATION§ 25-8-281(C) Critical Environmental Features Canyon Rimrock and 150’ CEF Buffer Canyon Rimrock Wetland Seep Spring ITEM03/10-PRESENTATIONLand Use Commission Variances § 25-8 Land Use Commission Variance Findings (paraphrase of 25-8-41) Board of Adjustment Variance Findings (paraphrase of 25-2-474) • Requirement will deprive the applicant of a privilege given to owners of other similarly situated properties with approx. contemporaneous development; • Variance is not necessitated by scale, layout, construction method, or other design decision made by the applicant, unless the design provides greater environmental protection; • Minimum deviation necessary to allow a reasonable use of the property; • No significant probability of harmful environmental consequences; • No harm to water quality. • Additional findings for Critical Water Quality Zone variances: • Requirement prevents a reasonable, economic use of the entire property; • Minimum deviation necessary to allow a reasonable, economic use of the entire property. • Requirement does not allow for a reasonable use; • Hardship is unique/not characteristic of the area; • Development does not • Alter character of area, • Impair use of adjacent property, • Impair the purpose of the regulation; ITEM03/11-PRESENTATIONSituations Involving Both EV Commission and BoA Tram in Setback or Slopes /Rimrocks Dock Extension/Dredging Construction in a CEF buffer vs Mechanized access on slopes greater than 35% or in LA shoreline setback • EV Commission reviews impact of construction on CEF • BoA can review for broader impacts to the LA zoning district Dredging greater than 25 cy vs Extending the dock greater than 30’ • EV Commission reviews impact of dredging on water quality • BoA reviews hardship, reasonable use, and area character of dock extension (navigation safety) ITEM03/12-PRESENTATIONQuestions? ITEM03/13-PRESENTATION