ITEM06 C15-2023-0048 ADV PACKET JAN8 PART1 — original pdf
Backup
CITY OF AUSTIN Board of Adjustment Decision Sheet ITEM04 DATE: Monday December 11, 2023 CASE NUMBER: C15-2023-0048 ___Y____Thomas Ates (D1) ___-____VACANT (D2) ___Y____Jessica Cohen (D3) ___Y____Yung-ju Kim (D4) ___Y____Melissa Hawthorne (D5) ___Y____Jeffery Bowen (D6) ___Y____Janel Venzant (D7) ___Y____Margaret Shahrestani (D8) ___Y____Brian Poteet (D9) ___Y____Michael Von Ohlen (D10) ___Y____Marcel Gutierrez-Garza (M) ___-____Kelly Blume (Alternate) (M) ___-____Suzanne Valentine (Alternate) (M) ___-____VACANT (Alternate) (M) APPLICANT: Stephen Hawkins OWNER: Willow Beach, LLC ADDRESS: 1446 ROCKCLIFF RD VARIANCE REQUESTED: The applicant is requesting variance(s) from the Land Development Code, Section 25-2-1176 (Site Development Regulations for Docks, Marinas, and Other Lakefront Uses) (A) (5) (a) to increase the footprint of a boat dock from 1,200 square feet (maximum allowed) to 2,235 square feet (requested), in order to erect a second boat dock in a “LA”, Lake Austin zoning district. Note: Land Development Code, 25-2-1176 Site Development Regulations for Docks, Marinas, and other Lakefront Uses (A) A dock or similar structure must comply with the requirements of this subsection. (5) The footprint of a dock, including the portion of a cut-in slip, attached access structures, or roof overhang, may not exceed: (a) 1,200 square feet for a dock that is accessory to a principal residential use BOARD’S DECISION: The public hearing was closed by Madam Chair Jessica Cohen, Board member Maggie Shahrestani motions to postpone to January 8, 2024; Board member Jeffery Bowen seconds on 10-0 votes; POSTPONED TO JANUARY 8, 2024. FINDING: ITEM06/11. The Zoning regulations applicable to the property do not allow for a reasonable use because: 2. (a) The hardship for which the variance is requested is unique to the property in that: (b) The hardship is not general to the area in which the property is located because: 3. The variance will not alter the character of the area adjacent to the property, will not impair the use of adjacent conforming property, and will not impair the purpose of the regulations of the zoning district in which the property is located because: Elaine Ramirez Executive Liaison Jessica Cohen Madam Chair forITEM06/2ITEM06/3ITEM06/4ITEM06/5ITEM06/6ITEM06/7ITEM06/8ITEM06/9ITEM06/10ITEM06/11ITEM06/12ITEM06/13BOA GENERAL REVIEW COVERSHEET CASE: C15-2023-0048 BOA DATE: December 11th, 2023 ADDRESS: 1446 Rockcliff Rd OWNER: Willow Beach LLC COUNCIL DISTRICT: 8 AGENT: Jon Fichter – Aqua Permits ZONING: LA LEGAL DESCRIPTION: ABS 72 SUR 1 BROWN W ACR 8.8930 VARIANCE REQUEST: increase the footprint of a boat dock from 1,200 square feet to 2,235 square feet SUMMARY: erect a second Boat Dock ISSUES: existing boat dock inaccessible due to its location at the end of a narrow channel that is impassible by boat. ZONING LAND USES LA Site North LA South East West PUD LA PUD/LA Single-Family Lake Austin Single-Family Lake Austin Single-Family NEIGHBORHOOD ORGANIZATIONS: Austin Lost and Found Pets Austin Neighborhoods Council City of Rollingwood Friends of Austin Neighborhoods Neighborhood Empowerment Foundation Preservation Austin SELTexas Save Our Spring Alliance TNR BCP – Travis County Natural Resources ITEM06/14November 29, 2023 Stephen Hawkins 6504 Betty Cook Dr Austin, TX 78723 Re: C15-2023-0048 Dear Stephen, Property Description: ABS 72 SUR 1 BROWN W ACR 8.8930 Austin Energy (AE) has reviewed your application for the above referenced property, requesting that the Board of Adjustment consider a variance request from LDC Section 25-2-1176(A)(5)(a) to increase the footprint of a boat dock at 1446 Rockcliff Rd. Austin Energy does not oppose the request, provided that any proposed or existing improvements follow Austin Energy’s Clearance & Safety Criteria, the National Electric Safety Code, and OSHA requirements. Any removal or relocation of existing facilities will be at the owner’s/applicant’s expense. Please use this link to be advised of our clearance and safety requirements which are additional conditions of the above review action: https://library.municode.com/tx/austin/codes/utilities_criteria_manual?nodeId=S1AUENDECR_1 .10.0CLSARE If you require further information or have any questions regarding the above comments, please contact our office. Thank you for contacting Austin Energy. Cody Shook, Planner III Austin Energy Public Involvement | Real Estate Services 2500 Montopolis Drive Austin, TX 78741 (512) 322-6881 Cody.Shook@austinenergy.com ITEM06/15CITY OF AUSTIN Development Services Department Permitting & Development Center Phone(cid:29) 512(cid:17)(cid:28)(cid:26)(cid:27)(cid:17)4000 6310 Wilhelmina Delco Dr(cid:15) (cid:36)(cid:88)(cid:86)tin(cid:15) (cid:55)e(cid:91)a(cid:86) (cid:26)(cid:27)(cid:26)52 Board of Adjustment General/Parking Variance Application WARNING: Filing of this appeal stops all affected construction activity. This application is a fillable PDF that can be completed electronically. To ensure your information is saved, click here to Save the form to your computer, then open your copy and continue. The Tab key may be used to navigate to each field; Shift + Tab moves to the previous field. The Enter key activates links, emails, and buttons. Use the Up & Down Arrow keys to scroll through drop-down lists and check boxes, and hit Enter to make a selection. The application must be complete and accurate prior to submittal. If more space is required, please complete Section 6 as needed. All information is required (if applicable). For Office Use Only Case # __________________ ROW # ___________________ Tax # ____________________ C15-2023-0048 0131110267 13225563 Section 1: Applicant Statement Street Address: __________________________________________________________________ 1446 Rockcliff Rd, Austin TX 78746 Subdivision Legal Description: ____________________________________________________________________________ ABS 72 SUR 1 BROWN W ACR 8.8930 ____________________________________________________________________________ Lot(s): _________________________________ Block(s): _____________________________ Outlot: _________________________________ Division: _____________________________ Zoning District: ___________________________________________________________________ Council District: 8 LA I/We ________________________________________________ on behalf of myself/ourselves as Stephen Hawkins authorized agent for ________________________________________________ affirm that on Willow Beach LLC Month September , Day 15 , Year 2023 , hereby apply for a hearing before the Board of Adjustment for consideration to (select appropriate option below): Erect Attach Complete Remodel Maintain Other: ____________ Type of Structure: ______________________________________________________________ Boat Dock City of Austin | Board of Adjustment General/Parking Variance Application 06/24/2021 | Page 4 of 8 ITEM06/16Portion of the City of Austin Land Development Code applicant is seeking a variance from: ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Section 2: Variance Findings The Board must determine the existence of, sufficiency of, and weight of evidence supporting the findings described below. Therefore, you must complete each of the applicable Findings Statements as part of your application. Failure to do so may result in your application being rejected as incomplete. Please attach any additional supporting documents. NOTE: The Board cannot grant a variance that would provide the applicant with a special privilege not enjoyed by others similarly situated or potentially similarly situated. I contend that my entitlement to the requested variance is based on the following findings: Reasonable Use The zoning regulations applicable to the property do not allow for a reasonable use because: ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Hardship a) The hardship for which the variance is requested is unique to the property in that: ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ b) The hardship is not general to the area in which the property is located because: ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ITEM06/17 Area Character The variance will not alter the character of the area adjacent to the property, will not impair the use of adjacent conforming property, and will not impair the purpose of the regulations of the zoning district in which the property is located because: ____________________________________________________________________________ The proposed boat dock is located on the shoreline of Lake Austin and will adhere to all Land ____________________________________________________________________________ Development code(s) pertaining to new boat docks. ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Parking (additional criteria for parking variances only) Request for a parking variance requires the Board to make additional findings. The Board may grant a variance to a regulation prescribed in the City of Austin Land Development Code Chapter 25-6, Appendix A with respect to the number of off-street parking spaces or loading facilities required if it makes findings of fact that the following additional circumstances also apply: 1. Neither present nor anticipated future traffic volumes generated by the use of the site or the uses of sites in the vicinity reasonably require strict or literal interpretation and enforcement of the specific regulation because: ____________________________________________________________________________ n/a ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ 2. The granting of this variance will not result in the parking or loading of vehicles on public streets in such a manner as to interfere with the free flow of traffic of the streets because: ____________________________________________________________________________ n/a ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ 3. The granting of this variance will not create a safety hazard or any other condition inconsistent with the objectives of this Ordinance because: ____________________________________________________________________________ n/a ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ 4. The variance will run with the use or uses to which it pertains and shall not run with the site because: ____________________________________________________________________________ n/a ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ City of Austin | Board of Adjustment General/Parking Variance Application 06/24/2021 | Page 6 of 8 ITEM06/18Section 3: Applicant Certificate I affirm that my statements contained in the complete application are true and correct to the best of my knowledge and belief. Applicant Signature: ____________________________________________ Date: _____________ 09/15/2023 Applicant Name (typed or printed): ___________________________________________________ Stephen Hawkins Applicant Mailing Address: __________________________________________________________ 6504 Betty Cook Dr City: ________________________________________ State: ________________ Zip: _______ 78723 Austin TX Phone (will be public information): _______________________________________ Email (optional – will be public information): ____________________________________________ Section 4: Owner Certificate I affirm that my statements contained in the complete application are true and correct to the best of my knowledge and belief. Owner Signature: ______________________________________________ Date: _____________ 09/15/2023 Owner Name (typed or printed): ______________________________________________________ Willow Beach LLC Owner Mailing Address: ____________________________________________________________ 1446 Rockcliff Rd. City: ________________________________________ State: ________________ Zip: _______ 78746 Austin TX Phone (will be public information): _______________________________________ Email (optional – will be public information): ____________________________________________ Section 5: Agent Information Agent Name: ____________________________________________________________________ Agent Mailing Address: ____________________________________________________________ City: ________________________________________ State: ________________ Zip: _______ Phone (will be public information): ____________________________________________________ Email (optional – will be public information): ____________________________________________ Section 6: Additional Space (if applicable) Please use the space below to provide additional information as needed. To ensure the information is referenced to the proper item, include the Section and Field names as well (continued on next page). _______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ City of Austin | Board of Adjustment General/Parking Variance Application 06/24/2021 | Page 7 of 8 ITEM06/19COLORADO RIVER GOLDREYER ERIC & ELIZABETH CALLED 1.183 ACRES DOC. NO. 2015193128 O.P.R.T.C.T. SAVAGE KENT A & CHERYL K CALLED 1.162 ACRES DOC. NO. 2008189987 O.P.R.T.C.T. [2] 7.5647 ACRE(S) 329,519 SQUARE FEET WILLOW BEACH, LLC CALLED 7.565 ACRES DOC. NO. 2021039640 O.P.R.T.C.T. W IL U S B S A T R V LIA M B E Y N C T N A R R O N W O. 2 O. 72 [1] LOT 6 ROCKCLIFF ESTATES PUD VOL. 85, PG. 177C-177D P.R.T.C.T. OWNER: TEBA PURCHASING GROUP LLC DOC. NO 2017083754 O.P.R.T.C.T. [1] 1 STORY WOOD/METAL & STONE RESIDENCE [2] THREE STORY CONC. / GLASS & METAL RESIDENCE GREEN PARK SUBDIVISION SEC. 4, BOOK 90, PAGES 183-184 P.R.T.C.T. ROCKCLIFF ROAD (60' ROW) DOC. NO. 2011143248 BOUNDARY, TREE, AND TOPOGRAPHIC SURVEY OF A 7.565 ACRE TRACT OUT OF THE WILLIAM BROWN SURVEY NO. 2, ABSTRACT NO. 72 City OF Austin, Travis County, Texas A Limited Liability Company PO Box 90876, Austin Texas 78709 INFO@4WARDLS.COM (512) 537-2384 TBPELS FIRM #10174300 ITEM06/20COLORADO RIVER GOLDREYER ERIC & ELIZABETH CALLED 1.183 ACRES DOC. NO. 2015193128 O.P.R.T.C.T. SAVAGE KENT A & CHERYL K CALLED 1.162 ACRES DOC. NO. 2008189987 O.P.R.T.C.T. [2] APPROXIMATE LOCATION OF ZONE "AE" (SHADED) AS SCALED FROM FEMA FLOOD MAP 7.5647 ACRE(S) 329,519 SQUARE FEET WILLOW BEACH, LLC CALLED 7.565 ACRES DOC. NO. 2021039640 O.P.R.T.C.T. W IL U S B S A T R V LIA M B E Y N C T N A R R O N W O. 2 O. 72 APPROXIMATE LOCATION OF ZONE "X" (NO HATCH) AS SCALED FROM FEMA FLOOD MAP [1] LOT 6 ROCKCLIFF ESTATES PUD VOL. 85, PG. 177C-177D P.R.T.C.T. OWNER: TEBA PURCHASING GROUP LLC DOC. NO 2017083754 O.P.R.T.C.T. [1] 1 STORY WOOD/METAL & STONE RESIDENCE [2] THREE STORY CONC. / GLASS & METAL RESIDENCE GREEN PARK SUBDIVISION SEC. 4, BOOK 90, PAGES 183-184 P.R.T.C.T. ROCKCLIFF ROAD (60' ROW) DOC. NO. 2011143248 DETAIL SHEET A Limited Liability Company PO Box 90876, Austin Texas 78709 INFO@4WARDLS.COM (512) 537-2384 TBPELS FIRM #10174300 ITEM06/21APPENDIX P-1 - EROSION CONTROL NOTES 1. The contractor shall install erosion/sedimentation controls, tree/natural area protective fencing, and conduct "Pre-Construction" tree fertilization (if applicable) prior to any site preparation work (clearing, grubbing or excavation). 2. The placement of erosion/sedimentation controls shall be in accordance with the Environmental Criteria Manual and the approved Erosion and Sedimentation Control Plan. T he COA ESC Plan shall be consulted and used as the basis for a TPDES required SWPPP. If a SWPPP is required, it shall be available for review by the City of Austin Environmental Inspector at all times during construction, including at the Pre-Construction meeting. The checklist below contains the basic elements that shall be reviewed for permit approval by COA EV Plan Reviewers as well as COA EV Inspectors. — Plan sheets submitted to the City of Austin MUST show the following: Direction of flow during grading operations. Location, description, and calculations for off-site flow diversion structures. Areas that will not be disturbed; natural features to be preserved. Delineation of contributing drainage area to each proposed BMP (e.g., silt fence, sediment basin, etc.). Location and type of E&S BMPs for each phase of disturbance. Calculations for BMPs as required. Location and description of temporary stabilization measures. Location of on-site spoils, description of handling and disposal of borrow materials, and description of on-site permanent spoils disposal areas, including size, depth of fill and revegetation procedures. Describe sequence of construction as it pertains to ESC including the following elements: 1. Installation sequence of controls (e.g. perimeter controls, then sediment basins, then temporary stabilization, then permanent, etc.) 2. Project phasing if required (LOC greater than 25 acres) 3. Sequence of grading operations and notation of temporary stabilization measures to be used 4. Schedule for converting temporary basins to permanent WQ controls 5. Schedule for removal of temporary controls 6. Anticipated maintenance schedule for temporary controls — Categorize each BMP under one of the following areas of BMP activity as described below: 3.1 Minimize disturbed area and protect natural features and soil 3.2 Control Stormwater flowing onto and through the project 3.3 Stabilize Soils 3.4 Protect Slopes 3.5 Protect Storm Drain Inlets 3.6 Establish Perimeter Controls and Sediment Barriers 3.7 Retain Sediment On-Site and Control Dewatering Practices 3.8 Establish Stabilized Construction Exits 3.9 Any Additional BMPs — Note the location of each BMP on your site map(s). — For any structural BMPs, you should provide design specifications and details and refer t othem. — For more information, see City of Austin Environmental Criteria Manual 1.4. 3. The Placement of tree/natural area protective fencing shall be in accordance with the City of Austin standard Notes for Tree and Natural Area Protection and the approved Grading/Tree and Natural Area Plan. 4. A pre-construction conference shall be held on-site with the contractor, design Engineer/ permit applicant and Environmental Inspector after installation of the erosion/sedimentation controls, tree/natural area protection measures and "Pre-Construction" tree fertilization (if applicable) prior to beginning any site preparation work. The owner or owner's representative shall notify the Development Services Department, 512-974-2278 or by email at environmental.inspections@austintexas. gov, at least three days prior to the meeting date. COA approved ESC Plan and TPDES SWPPP (if required) should be reviewed by COA EV Inspector at this time. 5. Any major variation in materials or locations of controls or fences from those shown on the approved plans will require a revision and must be approved by the reviewing Engineer, Environmental Specialist or City Arborist as appropriate. Major revisions must be approved by authorized COA staff. Minor changes to be made as field revisions to the Erosion and Sedimentation Control Plan may be required by the Environmental Inspector during the course of construction to correct control inadequacies. 6. The contractor is required to provide a certified inspector that is either a licensed engineer (or person directly supervised by the licensed engineer) or Certified Professional in Erosion and Sediment Control (CPESC or CPESC - IT), Certified Erosion, Sediment and Stormwater - Inspector (CESSWI or CESSWI - IT) or Certified Inspector of Sedimentation and Erosion Controls (CISEC or CISEC - IT) certification to inspect the controls and fences at weekly or bi-weekly intervals and after one-half (1⁄2) inch or greater rainfall events to insure that they are functioning properly. The person(s) responsible for maintenance of controls and fences shall immediately make any necessary repairs to damaged areas. Silt accumulation at controls must be removed when the depth reaches six (6) inches or one-third (1⁄3) of the installed height of the control whichever is less. 7. Prior to final acceptance by the City, haul roads and waterway crossings constructed for temporary contractor access must be removed, accumulated sediment removed from the waterway and the area restored to the original grade and revegetated. All land clearing debris shall be disposed of in approved spoil disposal sites. 8. All work must stop if a void in the rock substrate is discovered which is; one square foot in total area; blows air from within the substrate and/or consistently receives water during any rain event. At this time it is the responsibility of the Project Manager to immediately contact a City of Austin Environmental Inspector for further investigation. In addition, if the project site is located within the Edwards Aquifer, the Project Manager must notify the Travis County Balcones Canyonlands Conservation Preserve (BCCP) by email at bccp@traviscountytx.gov. Construction activities within 50 feet of the void must stop. 9. Temporary and Permanent Erosion Control: All disturbed areas shall be restored as noted below: A. All disturbed areas to be revegetated are required to place a minimum of six (6) inches of topsoil [see Standard Specification Item No. 601S.3(A)]. Do not add topsoil within the critical root zone of existing trees. • Topsoil salvaged from the existing site is encouraged for use, but it should meet the standards set forth in 601S. An owner/engineer may propose use of onsite salvaged topsoil which does not meet the criteria of Standard Specification 601S by providing a soil analysis and a written statement from a qualified professional in soils, landscape architecture, or agronomy indicating the onsite topsoil will provide an equivalent growth media and specifying what, if any, soil amendments are required. • Soil amendments shall be worked into the existing onsite topsoil with a disc or tiller to create a well-blended material. The vegetative stabilization of areas disturbed by construction shall be as follows: : TEMPORARY VEGETATIVE STABILIZATION: 1. From September 15 to March 1, seeding shall be with or include a cool season cover crop: (Western Wheatgrass ( Pascopyrum smithii ) at 5.6 pounds per acre, Oats ( Avena sativa ) at 4.0 pounds per acre, Cereal Rye Grain ( Secale cereale ) at 45 pounds per acre. Contractor must ensure that any seed application requiring a cool season cover crop does not utilize annual ryegrass ( Lolium multiflorum ) or perennial ryegra ss ( Lolium perenne ). Cool season cover crops are not permanent erosion control. 2. From March 2 to September 14, seeding shall be with hulled Bermuda at a rate of 45 pounds per acre or a native plant seed mix conforming to Item 604S or 609S. A. Fertilizer shall be applied only if warranted by a soil test and shall conform to Item No. 606S, Fertilizer. Fertilization should not occur when rainfall is expected or during slow plant growth or dormancy. Chemical fertilizer may not be applied in the Critical Water Quality Zone. B. Hydromulch shall comply with Table 1, below. C. Temporary erosion control shall be acceptable when the grass has grown at least 11⁄2 inches high with a minimum of 95% total coverage so that all areas of a site that rely on vegetation for temporary stabilization are uniformly vegetated, and provided there are no bare spots larger than 10 square feet. D. When required, native plant seeding shall comply with requirements of the City of Austin Environmental Criteria Manual, and Standard Specification 604S or 609S Table 1: Hydromulching for Temporary Vegetative Stabilization Material Description Longevity Typical Applications Application Rates 0—3 months Moderate slopes; from flat to 3:1 1,500 to 2,000 lbs per acre 70% or greater Wood/Straw 30% or less Paper or Natural Fibers 100% or any blend of wood, cellulose, straw, and/or cotton plant material (except no mulch shall exceed 30% paper) PERMANENT VEGETATIVE STABILIZATION: 1. From September 15 to March 1, seeding is considered to be temporary stabilization only. If cool season cover crops exist where permanent vegetative stabilization is desired, the grasses shall be mowed to a height of less than one-half (1⁄2) inch and the area shall be re-seeded in accordance with Table 2 below. Alternatively, the cool season cover crop can be mixed with Bermuda grass or native seed and installed together, understanding that germination of warm- season seed typically requires soil temperatures of 60 to 70 degrees. 2. From March 2 to September 14, seeding shall be with hulled Bermuda at a rate of 45 pounds per acre with a purity of 95% and a minimum pure live seed (PLS) of 0.83. Bermuda grass is a warm season grass and is considered permanent erosion control. Permanent vegetative stabilization can also be accomplished with a native plant seed mix conforming to Item 604S or 609S. A. Fertilizer use shall follow the recommendation of a soil test. See Item 606S, Fertilizer. Applications of fertilizer (and pesticide) on City-owned and managed property requires the yearly submittal of a Pesticide and Fertilizer Application Record, along with a current copy of the applicator's license. For current copy of the record template contact the City of Austin's IPM Coordinator. B. Hydromulch shall comply with Table 2, below. C. Water the seeded areas immediately after installation to achieve germination and a healthy stand of plants that can ultimately survive without supplemental water. Apply the water uniformly to the planted areas without causing displacement or erosion of the materials or soil. Maintain the seedbed in a moist condition favorable for plant growth. All watering shall comply with City Code Chapter 6-4 (Water Conservation), at rates and frequencies determined by a licensed irrigator or other qualified professional, and as allowed by the Austin Water Utility and current water restrictions and water conservation initiatives. D. Permanent erosion control shall be acceptable when the grass has grown at least 11⁄2 inches high with a minimum of 95 percent for the non-native mix, and 95 percent coverage for the native mix so that all areas of a site that rely on vegetation for stability must be uniformly vegetated, and provided there are no bare spots larger than 10 square feet. E. When required, native plant seeding shall comply with requirements of the City of Austin Environmental Criteria Manual, Items 604S and 609S. Table 2: Hydromulching for Permanent Vegetative Stabilization Material Description Longevity Typical Applications Application Rates Bonded Fiber Matrix (BFM) 80% Organic defibrated fibers 10% Tackifier 6 months On slopes up to 2:1 and erosive soil conditions 2,500 to 4,000 lbs per acre (see manufacturers recommendations) Fiber Reinforced Matrix (FRM) Up to 12 months On slopes up to 1:1 and erosive 65% Organic defibrated fibers 25% Reinforcing Fibers or less 10% Tackifier Soil conditions 3,000 to 4,500 lbs per acre (see manufacturers recommendations) 10. The contractor shall not dispose of surplus excavated material from the site without notifying the Development Services Department at 512-974-2278 at least 48 hours prior with the location and a copy of the permit issued to receive the material. REVISIONS / CORRECTIONS Number Description Revise (R) Add (A) Void (V) Sheet No.'s Total # of Sheets in Plan Set Net Change Imp. Cover (Sq-Ft) Date Imaged City of Austin Approval Date C. Where trees are close to proposed buildings, erect the fence to allow 6 to 10 feet of work space between the fence and the building; D. Where there are severe space constraints due to tract size, or other special requirements, contact the City Arborist at 974-1876 to discuss alternatives. Special Note: For the protection of natural areas, no exceptions to installing fences at the Limit of Construction line will be permitted. 7. Where any of the above exceptions result in a fence being closer than 4 feet to a tree trunk, protect the trunk with strapped-on planking to a height of 8 ft (or to the limits of lower branching) in addition to the reduced fencing provided. 8. Trees approved for removal shall be removed in a manner which does not impact trees to be preserved. 9. Any roots exposed by construction activity shall be pruned flush with the soil. Backfill root areas with good quality top soil as soon as possible. If exposed root areas are not backfilled within 2 days, cover them with organic material in a manner which reduces soil temperature and minimizes water loss due to evaporation. 10. Any trenching required for the installation of landscape irrigation shall be placed as far from existing tree trunks as possible. 11. No landscape topsoil dressing greater than 4 inches shall be permitted within the drip line of trees. No soil is permitted on the root flare of any tree. 12. Pruning to provide clearance for structures, vehicular traffic and equipment shall take place before damage occurs (ripping of branches, etc.). 13. All finished pruning shall be done according to recognized, approved standards of the industry (Reference the National Arborist Association Pruning Standards for Shade Trees available on request from the City Arborist). 14. Deviations from the above notes may be considered ordinance violations if there is substantial non-compliance or if a tree sustains damage as a result. APPENDIX P-4: - STANDARD SEQUENCE OF CONSTRUCTION The following sequence of construction shall be used for all development. The applicant is encouraged to provide any additional details appropriate for the particular development. 1. Temporary erosion and sedimentation controls are to be installed as indicated on the approved site plan or subdivision construction plan and in accordance with the Erosion Sedimentation Control Plan (ESC) and Stormwater Pollution Prevention Plan (SWPPP) that is required to be posted on the site. Install tree protection, initiate tree mitigation measures and conduct "Pre - Construction" tree fertilization (if applicable). 2. The Environmental Project Manager or Site Supervisor must contact the Development Services Department, Environmental Inspection, at 512-974-2278, 72 hours prior to the scheduled date of the required on-site preconstruction meeting. 3. The Environmental Project Manager, and/or Site Supervisor, and/or Designated Responsible Party, and the General Contractor will follow the Erosion Sedimentation Control Plan (ESC) and Storm Water Pollution Prevention Plan (SWPPP) posted on the site. Temporary erosion and sedimentation controls will be revised, if needed, to comply with City Inspectors' directives, and revised construction schedule relative to the water quality plan requirements and the erosion plan. 4. Rough grade the pond(s) at 100% proposed capacity. Either the permanent outlet structure or a temporary outlet must be constructed prior to development of embankment or excavation that leads to ponding conditions. The outlet system must consist of a sump pit outlet and an emergency spillway meeting the requirements of the Drainage Criteria Manual and/or the Environmental Criteria Manual, as required. The outlet system shall be protected from erosion and shall be maintained throughout the course of construction until installation of the permanent water quality pond(s). 5. Temporary erosion and sedimentation controls will be inspected and maintained in accordance with the Erosion Sedimentation Control Plan (ESC) and Storm Water Pollution Prevention Plan (SWPPP) posted on the site. 6. Begin site clearing/construction (or demolition) activities. 7. In the Barton Springs Zone, the Environmental Project Manager or Site Supervisor will schedule a mid-construction conference to coordinate changes in the construction schedule and evaluate effectiveness of the erosion control plan after possible construction alterations to the site. Participants shall include the City Inspector, Project Engineer, General Contractor and Environmental Project Manager or Site Supervisor. The anticipated completion date and final construction sequence and inspection schedule will be coordinated with the appropriate City Inspector. 8. Permanent water quality ponds or controls will be cleaned out and filter media will be installed prior to/concurrently with revegetation of site. 9. Complete construction and start revegetation of the site and installation of landscaping. 10. Upon completion of the site construction and revegetation of a project site, the design engineer shall submit an engineer's letter of concurrence bearing the engineer's seal, signature, and date to the Development Services Department indicating that construction, including revegetation, is complete and in substantial compliance with the approved plans. After receiving this letter, a final inspection will be scheduled by the appropriate City inspector. 11. Upon completion of landscape installation of a project site, the Landscape Architect shall submit a letter of concurrence to the Development Services Department indicating that the required landscaping is complete and in substantial conformity with the approved plans. After receiving this letter, a final inspection will be scheduled by the appropriate City inspector. 12. After a final inspection has been conducted by the City inspector and with approval from the City inspector, remove the temporary erosion and sedimentation controls and complete any necessary final revegetation resulting from removal of the controls. Conduct any maintenance and rehabilitation of the water quality ponds or controls. for driveway construction: the owner is responsible for all costs for relocation of, for construction within the right-of-way, a concrete permit is required. for the building permit, a signed and sealed letter shall be submitted to the city of Austin, 6. or damage to utilities. 7. 8. per the land development code, 25-1 2-3 1612.4, certifying that the structure is in accordance with asce 24, flood resistant design and construction. 9. materials or equipment will be delivered to the site from the landward side of this project. 10. approval of this site plan does not include building and fire code approval nor building permit approval. all work will occur within the limits of construction as shown on the plan, and that no General Notes: 1. This project is not located over the Edwards Aquifer recharge zone. 2. Deed restrictions or restrictive covenants are not applicable to this property. 3. A business or living quarter may not be constructed on a pier or similar structure extending into or above Lake Austin, except under a license agreement approved by the City Council (Section 25-2-1 176 (H)). 4. Contractor to verity utility locations and ground and flow line elevations before construction. 5. Environmental Inspector has the authority to add/or modify erosion/sedimentation controls on site to keep project in compliance with the City of Austin Rules and Regulations. 6. Approval of these plans by the City of Austin indicates compliance with applicable City regulations only. 7. Approval by other government entities may be required prior to the start of construction. The applicant is responsible for determining what additional approvals may be necessary. 8. All work on this project is to be accomplished via barge. There will be no site access by land, nor will any construction staging or materials storage be located on land. NOTE: PORTIONS OF THIS PROJECT ARE LOCATED IN THE FEMA 100 YEAR FLOODPLAIN AS DEFINED FLOOD INSURANCE MAY BE REQUIRED. THE FEDERAL REGULATIONS FOR DEVELOPMENT IN A FLOODPLAIN CAN BE FOUND IN CHAPTER 44 OF THE CODE OF FEDERAL REGULATIONS (44 CFR). SHEET INDEX: 1 COVER SHEET 2 PLAT 3 PROPOSED SITE PLAN 4 CLOSE UP OF SITE PLAN 5 ELEVATIONS 6 LANDSCAPE SITE SPECIFIC NOTES OWNER: WILLOW BEACH LLC OWNER MAILING ADDRESS: 1446 ROCKCLIFF RD, AUSTIN TX 78746 PROPERTY ADDRESS: 1446 ROCKCLIFF RD, AUSTIN TX 78746 LEGAL DESCRIPTION: ABS 72 SUR 1 BROWN W ACR 8.8930 DOCK CONTRACTOR: WATERSHED: LAKE AUSTIN WATERSHED CLASSIFICATION: WATER SUPPLY RURAL USE: SF-R TBA AUSTIN FULL-PURPOSE RELATED PERMIT NUMBERS: SP-2009-0077D, SP-2009-0030DS, SP-04-0253D ZONING: SMART GROWTH ZONE: DRINKING WATER QUALITY ZONE FLOOD PLAIN INFORMATION: The project is within the 100-yr flood plain as shown on F.E.M.A Firm number 48453C0435K, EFFECTIVE ON 1/22/2020 EXISTING SHORELINE LENGTH: ALLOWABLE DOCK WIDTH: PROPOSED DOCK WIDTH: PROPOSED DOCK LENGTH: PROPOSED DOCK FOOTPRINT: 2958' 40' 33' 7" 33' 1100' Development Information: MIRO RIVERA ARCHITECTURE Owner: Miro Rivera Address: 505 Powell St, Austin, TX 78703 Owner’s representative responsible for plan alternate: Stephen Hawkins Person or firm responsible for erosion/sedimentation control maintenance: Person or firm responsible for tree/natural area protection maintenance: SUBMITTAL DATE: 2/23/2023 N SHORELINE APPENDIX P-2: - CITY OF AUSTIN STANDARD NOTES FOR TREE AND NATURAL AREA PROTECTION 1. All trees and natural areas shown on plan to be preserved shall be protected during construction with temporary fencing. 2. Protective fences shall be erected according to City of Austin Standards for Tree Protection. 3. Protective fences shall be installed prior to the start of any site preparation work (clearing, grubbing or grading), and shall be maintained throughout all phases of the construction project. 4. Erosion and sedimentation control barriers shall be installed or maintained in a manner which does not result in soil build-up within tree drip lines. 5. Protective fences shall surround the trees or group of trees, and will be located at the outermost limit of branches (drip line) , for natural areas, protective fences shall follow the Limit of Construction line, in order to prevent the following: A. Soil compaction in the root zone area resulting from vehicular traffic or storage of equipment or materials; B. Root zone disturbances due to grade changes (greater than 6 inches cut or fill), or trenching not reviewed and authorized by the City Arborist; C. Wounds to exposed roots, trunk or limbs by mechanical equipment; D. Other activities detrimental to trees such as chemical storage, cement truck cleaning, and fires. 6. Exceptions to installing fences at tree drip lines may be permitted in the following cases: A. Where there is to be an approved grade change, impermeable paving surface, tree well, or other such site development, erect the fence approximately 2 to 4 feet beyond the area disturbed; B. Where permeable paving is to be installed within a tree's drip line, erect the fence at the outer limits of the permeable paving area (prior to site grading so that this area is graded separately prior to paving installation to minimized root damage); NOTE: IF AT ANY TIME DURING C ONSTRUCTION OF THIS PROJECT AN UNDERGROUND STORAGE TANK (UST) IS FOUND, CONSTRUCTION IN THAT AREA MUST STOP UNTIL A CITY OF AUSTIN UST CONSTRUCTION PERMIT IS APPLIED FOR AND APPROVED. ANY UST REMOVAL WORK MUST BE CONDUCTED BY A UST CONTRACTOR THAT IS REGISTERED WITH THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ). CONTACT ELIZABETH SIMMONS AT ELIZABETH.SIMMONS@AUSTINTEXAS.GOV IF YOU HAVE ANY QUESTIONS. [COA TITLE 6] SITE APPENDIX P-6 - REMEDIAL TREE CARE NOTES AERATION AND SUPPLEMENTAL NUTRIENT REQUIREMENTS FOR TREES WITHIN CONSTRUCTION AREAS As a component of an effective remedial tree care program per Environmental Criteria Manual section 3.5.4, preserved trees within the limits of construction may require soil aeration and supplemental nutrients. Soil and/or foliar analysis should be used to determine the need for supplemental nutrients. The City Arborist may require these analyses as part of a comprehensive tree care plan. Soil pH shall be considered when determining the fertilization composition as soil pH influences the tree's ability to uptake nutrients from the soil. If analyses indicate the need for supplemental nutrients, then humate/nutrient solutions with mycorrh izae components are highly recommended. In addition, soil analysis may be needed to determine if organic material or beneficial microorganisms are needed to improve soil health. Materials and methods are to be approved by the City Arborist (512-974-1876) prior to application. The owner or general contractor shall select a fertilization contractor and ensure coordination with the City Arborist. Pre-construction treatment should be applied in the appropriate season, ideally the season preceding the proposed construction. Minimally, areas to be treated include the entire critical root zone of trees as depicted on the City approved plans. Treatment should include, but not limited to, fertilization, soil treatment, mulching, and proper pruning. Post-construction treatment should occur during final revegetation or as determined by a qualified arborist after construction. Construction activities often result in a reduction in soil macro and micro pores and an increase in soil bulk density. To ameliorate the degraded soil conditions, aeration via water and/or air injected into the soil is needed or by other methods as approved by the City Arborist. The proposed nutrient mix specifications and soil and/or foliar analysis results need to be provided to and approved by the City Arborist prior to application (Fax # 512-974-3010). Construction which will be completed in less than 90 days may use materials at 1⁄2 recommended rates. Alternative organic fertilizer materials are acceptable when approved by the City Arborist. Within 7 days after fertilization is performed, the contractor shall provide documentation of the work performed to the City Arborist, Planning and Development Review Department. P.O. Box 1088, Austin, TX 78767. This note should be referenced as item #1 in the Sequence of Construction. Site Plan Release Notes: The following site plan release notes are included in accordance with the City of Austin’s request. Applicant will comply with all applicable City of Austin requirements. 1. All improvements shall be made in accordance with the released site plan. Any additional improvements will require site plan amendment and approval of the Planning and Development Review Department. 2. All signs must comply with requirements of the Land Development Code. (Section 1 3-2, Article VII) 3. Additional electric easements may be required at a later date. 4. All existing structures shown to be removed will require a demolition permit from the City of Austin Planning and Development Review Department. 5. A development Permit must be issued prior to an application for building permit for non-consolidated or Planning Commission approved site plans. Engineer signature and seal per City code Section 25-2-1173 Signature and Seal___________________________________ Address____________________________________________ Phone_____________________________________________ Email: danielphammpe@gmail.com SITE PLAN APPROVAL SHEET____OF____ FILE NUMBER_______________ ___________ APPLICATION DATE__________ APPROVED BY COMMISSION ON ___________ UNDER SECTION ____ OF CHAPTER ______OF THE CITY OF AUSTIN CODE DATE (LDC 25-5-81) ___________ CASE MANAGER____________ PROJECT EXPIRATION DATE (ORD.#970905-A) ________ DWPZ ____ DDZ ____ _________________________________________________ DIRECTOR, DEVELOPMENT SERVICES DEPARTMENT RELEASED FOR GENERAL COMPLIANCE______________ ZONING____________ REVISION 1______________________ CORRECTION 1_____________________ REVISION 2______________________ CORRECTION 2_____________________ REVISION 3______________________ CORRECTION 3_____________________ Final plat must be recorded by the project expiration date, if applicable. Subsequent site plans which do not comply with the Code current at the time of filing, and all required building permits and/or a notice of construction (if a building permit is not required) must also be approved prior to the project expiration date. AQUA PERMITS LLC AUSTIN TEXAS DESIGN, PERMITTING, CONSULTING, Y MAS ON THE SHORE OF LAKE AUSTIN IN THE BEAUTIFUL STATE OF TEXAS, UNITED STATES OF AMERICA. K C O D F F I L C K C O R D R F F I L 6 4 C 7 8 K 7 S C A O X E R T N 6 4 T S 4 U A 1 , I 12/19/2022 DATE SCALE see bar scale ENGINEER . . DRAFTER AQUA PERMITS FILE SP-2023-0147D SHEET COVER SHEET 1 OF 6 ITEM06/22