Item 12 - AIPP Spicewood Springs Project Presentation_Christine_Rojek.pdf — original pdf
Backup
Spicewood Springs Corridor Final Design Arts, Culture, Music and Entertainment Art in Public Places | 7.06.2026 Spicewood Springs Mobility project Project Phase Final Design Artist(s) Name Christine Rojek Art Commission 182,000 Funding Type CIP project Sponsor Dept Council District TPW 10 near 4501 Spicewood Springs Road 2 Spicewood Springs Mobility Project Overview Project Overview: Identified in the City of Austin’s 2016 Mobility Bond as a key project, the site currently is missing water quality facilities as well as safety features such as continuous sidewalks, curbs, buffer zones and there is no continuous center turn lane. Project Goals: • Expand the roadway to two lanes in each direction, adding a center median with left-turn bays • Create a shared-use path on both sides of the road for pedestrians and bicyclists, and stormwater quality and detention facilities. Construction Timeline: • Work began Dec. 2023 • Substantial Completion: EOY 2026 3 Spicewood Springs AIPP Project Overview Project Overview: • Create a site-specific artwork that enhances the community’s experience of the Spicewood Springs Road corridor. Project Goals: • Respect wildlife and integrate with the natural beauty of the corridor; • Be safe to people and animals, easily maintained, and vandal-resistant in an exterior environment. • Align with the character of the community and human history of the site. Timeline: • Fabrication: Summer - Fall 2026 • Installation: EOY 2026 TBD 4 Spicewood Springs Corridor – Scope of Work Scope of Work: • Engage with community to understand the important values and desires to reflect in the artwork. • Design a sculpture that honors the natural landscape and the local community. • Fabricate and Install the sculptures onsite in accordance with the ongoing site construction. Eligibility: • Corridor Pre-Qualified Artist Pool • Austin-based visual artists who reside in the seven counties bounding the Austin metro area (Travis, Hays, Williamson, Bastrop, Caldwell, Burnet, and Blanco counties) • At least 18 years of age Add Image ?? 5 Spicewood Springs Road AIPP Project Artist Christine Rojek “Taming of the Surge” –Norfolk, VA “Rubber Tipped Crane” – Town Center, Schaumburg, IL 6 Community Engagement SPICEWOOD SPRINGS BRANCH LIBRARY EVENT 10/20/24 • • VISITS TO NEIGHBORHOOD RESTAURANTS & SHOPS: INTRODUCED MYSELF, PASSED OUT FLYERS, TALKED ABOUT UPCOMING AIPP COMMISSION. • CONVERSATIONS WITH LOCALS: TOMLINSON’S PET STORE, SHIRLEY MCFAIL SCHOOL OF DANCE, GOLDFISH SWIM SCHOOL, ANOTHER BROKEN EGG, TROY MEDITERRANEAN RESTAURANT, EPOCH COFFEE. • DOS ELEMENTARY SCHOOL: FEEDBACK FROM NEIGHBORHOOD PARENTS. • COMMUNITY FACEBOOK PAGE. 7 Final Design: Site • • • The artworks will be installed in the median near 4501 Spicewood Springs Road. Site reviewed extensively for safety and required 5’ clearance on all sides of the artwork. The artwork will be installed within the “limits of construction” of Area #5. 8 Final Design: Site Plan The yellow area within the median is the Limit of Construction for the Art in Public Places project. 9 Inspiration Narrative / Description: The goal of this design is to: • Integrate the diversity of the natural environment with the joyful, family-centric spirit of the local neighborhoods. • Reflect how we experience and remember the chaos of our surroundings as a tapestry of overlapping images. • Continue my comparison of structures in nature to machine-age design & movements. • Reflect these concepts through the complexity of my sculptures. 10 Final Design: Visuals The Things I’ve Seen Today Consists of three elements: • • • • “ARCHING LANDSCAPES”, the central sculpture, consists of overlapping and perforated aluminum plate panels with images flora and fauna. “TRIBRID #1, Insect” one of two side sculptures, is a fusion of three whimsical bugs. “TRIBRID #2”, Succulent” the second of two side sculptures is a fusion of 3 arid plants. The overall dimensions of this installation will be 10ft H x 37Ft W x8ft D. 11 Final Design: Color Polyurethane primer, paint, and clearcoat: • Metallic Silver • Metallic Copper • Thalo Blue • Cadmium Yellow • Dioxine Purple 12 List of materials: • 6061 ALUMINUM • POLYURETHANE PRIMER, PAINT, AND CLEAR COAT • EPDM RUBBER SHEET • CONCRETE FOOTINGS in accordance with ACI 318 “building code requirements for reinforced concrete, and ACI 301, “Specifications for Structural concrete for buildings” • STAINLESS STEEL HARDWARE 13 Final Design Fabrication Drawings: Central Sculpture - “Arching Landscapes” 14 Final Design, Fabrication Drawings: Side Sculptures – Tribrid # 1 & #2 15 Final Design: Fabrication & Engineering Fabricators: • • • William Haggart, Buda, TX Christine Rojek Vector Custom Fabricating, Chicago, IL Structural Engineer: • Lysaght & Associates, Raleigh, NC Types of Fabrication: • Laser cutting • Welding • • Rolling Painting & Finishing Timeline: • • Estimated delivery to site winter 2026 5 months of fabrication 16 Final Design: Installation • Equipment for pier hole drilling and concrete mixing will be staged on the median surrounding Area #5. • The equipment will be dropped off before rush hour and will create minimal interruption in traffic. • Hole drilling - 1-2 days • Concrete pour, clean-up, and equipment removal - 1 day • Concrete Foundation cure time - 14 days minimum (per structural engineer) • Crane: Installation crane will be located in the median surrounding Area #5 for 3-6 hours. • Placement and anchoring of sculptures- 1 day • Touch-up & clean site - 1 day 17 Artwork Budget ITEM: Design/Engineering Artist Research/Site Selection/ Community Engagement Concept, Design Development, & Final Scale Modelling AutoCAD Design subtotal Fabrication/ Install Engineering & Construction Documents Rojek Studio Overhead Fabrication Painting & Finishing Shipping Footings & Installation Fabrication / Install subtotal Liability & Auto Insurance Travel (air fare, hotel, car rental, per diem) Artist Fee / Project Management Photos & Video Documentation TOTAL Amount 2,000.00 15,000.00 2,500.00 $19,500.00 8,252.00 1,443.00 84,500.00 14,000.00 7,375.00 12,900.00 128,452.00 2,159.00 4,089.00 27,300.00 500.00 $182,000.00 18 Next Steps Timeline: • Final Design • AIPP Panel • Arts Commission • Fabrication • Installation July 2025 - July 2026 July 13th, 2026 July 20th, 2026 Summer - Fall 2026 Winter 2026 Action needed: A motion to approve the final design for the Spicewood Springs Corridor Art in Public Places Project to the Arts Commission. 19