Item 20 - AIPP_WilliamCannon_Baggett_Presentation.pdf — original pdf
Backup
Corridor William Cannon Final Design Item #5 Arts, Culture, Music and Entertainment Art in Public Places | 2/19/26 Corridor William Cannon Project Phase Designing (Final) Artist(s) Name Brent Baggett Art Commission $104,000 Funding Type CIP Sponsor Dept TPW Managing Dept CDS Council District 2 5600 E William Cannon Dr, Austin, TX 78744 2 Corridor William Cannon Artist Introduction Brent Baggett “Winging it” Snohomish County Park, Everett, WA 2010 “Pioneer” El Centro Community College, Dallas, TX 2015 3 Community Engagement 4 "Relay" Final Design: Inspiration 5 Final Design: Visuals 6 Final Design: Site Plan 7 Final Design: Materials and Fabrication 8 Final Design: Installation 9 Artwork Budget Line Item Design (up to 20%) Artist Research | Community Engagement Concept Design Final Design Engineering & Construction Documents Design subtotal Fabrication / Install (minimum 80%) Materials Labor Shipping and installation Site Work Fabrication / Install subtotal Contingency 10% Total Amount $2,500 $6,000 $7,000 $2,500 $18,000 $30,000 $25,000 $5000 $10,000 $72,000 $10,000 % 2.5% 6% 7% 2.5% 18% 30% 25% 5% 10% 72% 10% $100,000 100% 10 Next Steps Timeline: • AIPP Panel • Arts Commission • Fabrication | Installation 3/2/26 3/23/26 Spring | Summer 2026 Action needed: A motion to approve the final design for the Corridor William Cannon Art in Public Places Project to the Arts Commission. 11