Arts CommissionJune 29, 2022

Item 5.a.i. Final Design for the Austin Fire Department/Austin Travis County EMS Embedded Artist Art in Public Places Project (Stations 1, 13/23) — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 16 pages

Austin Fire Department/Austin Travis County EMS Embedded Artist AIPP Project Final Design Review S H AW N S M I T H , A R T I S T AFD-EMS| Locker Room Renovations AFD and EMS are committed to maintaining safe and equitable facilities for fire and paramedic staff. Bringing a total of 11 AFD/EMS stations up to a more useable and safer standard will allow personnel to better perform their duties of serving the City of Austin community. The renovations to the AFD and EMS stations address several objectives including: The creation of equitable locker and bathroom facilities. The addition of a second ambulance and quarters for personnel. Lead and asbestos abatement. Replacement of a failing station bay. Upgrades to meet current Americans with Disabilities Act (ADA) and fire code requirements. Remedy structural integrity issues, electrical work, refurbishment, general repairs, and updating. Project Summary and Sites Six artists and Artist teams will work with two stations each: • • • • • • • • • • • • AFD Station 2: 506 W MLK Jr Blvd, District: 9 AFD Station 9: 4301 Speedway, District: 9 AFD Station 10: 3009 Windsor Rd, District: 10 AFD Station 12: 2109 Hancock Dr, District: 7 AFD Station 16: 7000 Reese Ln, District: 7 AFD Station 32: 2804 Montebello Rd, District: 8 AFD Training Academy: 4800 Shaw Ln, District: 2 AFD Station 8 / EMS Station 7: 8989 Research Blvd, District: 7 AFD Station 23 / EMS Station 13: 1330 E Rundberg Ln, Council District: 4 AFD Station 25 / EMS Station 10: 5228 Duval Rd, District: 6 EMS Station 1: 3616 S 1st St, District: 3 EMS Station 5: 5710 N Lamar Blvd, District: 7 P R O J E C T G O A L S The artwork must reflect the mission of the Austin Fire Department and Austin-Travis County Emergency Medical Services “to create safer communities through prevention, preparedness, and effective emergency response.” R E Q U E S T F O R Q U A L I F I C A T I O N S      integrates with either the site, architecture, interior or exterior of the station; is relevant to AFD/EMS's role in how the station serves the community; is conceptually accessible to station staff and visitors; is easily maintained and; contributes to the depth/breadth of the City of Austin's public art collection. Application Demographics 2020 RFQ open 8/12/20 to 10/1/20  Artist Information Meeting 9 /19/20  53 Applications Received  Selection of Six Awardees 11/5/20  Approved by AIPP Panel and Arts Commission 12/20  City Council Authority 3/25/21  Embedded Artist time 5/1/21-8/30/21 # of Apps % of Apps Type of App Male Female or Team w/ Female Gender Nonconforming or Other Answer LGBTQI Community Disabled Community BIPOC Veteran Total Applications 18 30 2 9 1 27 1 53 34% 57% 4% 17% 2% 51% 0% 100% *Note: Percentages taken from total # of applications. Some applicants chose not to respond to the demographic questions Project Goals and Selection Process District 2 Shawn Smith EMS 1 AFD 23/EMS 13 Final Design Proposal ● ● ● EMBEDDED TIME 9 hours on July 2, 2021 and July 16, 2021 at EMS Dispatch at the Combined Transportation, Emergency, and Communications Center located at 5010 Old Manor Road 21 hours from June 18, 2021 to July 9, 2021 at EMS1 station located at 616 S. 1st Street 44 hours from June 23,2021 to July 28, 2021 at AFD23/EMS13 station located at 1330 E. Rundberg Lane EMS 1 Nexus INSPIRATION Anatomical heart Heart represents compassion and care First stand-alone municipal EMS station Trailblazer in modern CPR care and protocol EMS 1 PROPOSED DESIGN Abstracted carbon steel anatomical heart made up of approximately 900 welded rings Approximately 100 inches tall x 71 inches wide x 40 inches deep Each individual ring plays a crucial role in the identity of the heart Approximately 500 pounds MAINTENANCE ● ● ● Surface helps make them resistant to many elements found in the environment such as air pollution, acid rain, and general airborne dirt. Periodic cleaning to remove buildup of resins and other residue is a good idea to extend coating life. ● A variety of methods for removal of surface deposits are available. Simple washing with plain water using hoses or pressure is usually adequate. When heavy spray equipment deposits of dirt or other contaminants dull surfaces, stronger methods may be needed. AFD 23/ EMS 13 Artwork Inspiration for Beacon Fresnel Lens Lighthouse Lantern Focus Calm in the Storm AFD 23/ EMS 13 PROPOSED DESIGN for Beacon Stainless steel and 3Form engineered resin Sits on top of new 24’ reinforced sign tower Approximately 5 feet tall x 3 feet in diameter Contains LED lights that pulse like a heartbeat LEDs are attached to an internal 6 sided marine plywood structure The shape of the design is taken from the station’s numbers There would be LED lights inside the sculpture. At night, the lights would illuminate to mimic the pulse of a heartbeat. LEDs will be attached to an internal 6-sided marine plywood structure. Marine plywood panels will be CNC’d to spec by 3form and assembled by the artist around the welded stainless steel structure. Marine plywood structure will sit above the surface of the 24 foot tower to allow moisture to escape. 3form engineered resin will have a 6” offset from marine plywood structure to avoid hotspots as recommended by 3form. LEDs and 304 Stainless Steel 3form Chroma XT Engineered Resin INTERIOR ACCESS and ELECTRICAL • All 3form panels can be unbolted for limited interior • access. 5 of the 6 stainless steel facings are welded together. If greater interior access is necessary, the 6th facing has six stainless steel cross pieces that are bolted together and can be removed. • Building contractor will install internal conduit from base to top of tower. Artist will hire Texas Electric to connect LED components to power source. • Weather-proof, lockable box to house electrical components provided and installed on exterior of tower by building contractor. Stainless steel: MAINTENANCE Inspect the installation on a regular basis noting discoloration or stains. ● ● Wash with soap and water and a soft cloth to cut buildup. ● Treat any discoloration as soon as possible with brass or chrome cleaner. Irreversible pitting will occur without prompt treatment. ● A mild abrasive compound or pad will remove stubborn stains. But, be sure to follow the direction of the existing grain so as not to harm the existing mechanical finish. Rinse completely and dry with a clean cloth. 3form: ● Use warm water, mild detergent and a soft cloth or chamois. ● Rinse surface thoroughly after cleaning with lukewarm water. ● Blot dry with slightly damp, soft cloth or chamois. Avoid using squeegees or scrapers as they may scratch. Avoid using scouring compounds or solvents such as: acetone, gasoline,benzene, carbon tetrachloride, or lacquer thinner. Avoid abrasives or highly alkaline cleaners. Do not use a dry cloth or a cloth of synthetic fiber such as rayon or polyester as they may scratch. Do not use Windex® or Glass Plus® cleaners. TIMELINE Budget June - July 2021 Community Time Engmt/Embedded November 1, 2021Mid-Design Review April 2022 Arts Conservation Review June 2022 Panel and Arts Commission Final Design approval by AIPP July 2022 Execute Commission Contract August 2022 Fabrication Begins June 2023 Installed AFD 23/EMS 13 Artwork August 2023 EMS 1 Artwork Installed