Austin-Bergstrom International Airport Parking Garage and Administration Building AIPP Project Final Design — original pdf
Backup
Austin‐Bergstrom International Airport Parking Garage and Administration Building AIPP Project Final Design AUSTIN ARTS COMMISSION JULY 2020 ABIA | Parking Garage and Administration Building Phase II AIPP Project Terminal Future Terminal Bldg. Rental Car Facility New Parking Garage AIPP Project location Artist Marc Fornes Landscape Spine AIPP Project location Artist Clay Odom + Kory Bieg PLUME by Clay Odom and Kory Bieg Site Plan & Rendering District 2 A LaunchPAD artist: Holly Veselka ABIA | Parking Garage and Administration Building Phase II AIPP Project The goal of the ABIA Parking Garage AIPP Phase II Project is to select an artist/artist team who will design artwork that: activates and anchors the pedestrian and/or vehicular experience of Austin‐Bergstrom International Airport visitors; responds and aligns with the physical presence of the Austin‐Bergstrom International Airport, the new administration building and parking garage, and existing artwork; reflects the nature and character of Austin; functions well during the day and night; is sustainable, easily maintained and vandal resistant; and contributes to the depth/breadth of the City of Austin’s public art collection. Public Art Goals & Sculpture Concept 5 TENTATIVE SCHEDULE: BUDGET: