4_Aquifer Storage and Recovery and Brackish Groundwater Desalination Field Testing and Community Engagement — original pdf
Backup
Aquifer Storage and Recovery and Brackish Groundwater Field Testing and Community Engagement Austin Water | 4/14/2026 Agenda Aquifer Storage and Recovery (ASR) & Brackish Groundwater Desalination Field Testing Current Status Contracting Pathways Preliminary Activities Overview Field Testing and Drilling Overview 2026 Community Engagement Strategy Next Steps 2 ASR and Brackish Current Status Early Site Planning AW is considering several City-owned properties in eastern Travis County for potential test well sites AW is working closely with other City departments to collaborate on plans for City- owned land 3 Contracting Pathway: Two-Scope Approach Scope 1 – Preliminary Activities Covers early desktop study updates, environmental and cultural analyses, and permitting activities Does not include test well drilling Will use existing allocated funds Can be approved administratively by City staff Scope 2 – Field Testing & Drilling Covers test well drilling, sample collection, laboratory testing, and brackish evaluation Will require City Council action, anticipated in May, to authorize additional funding for expanded scope 4 Preliminary Activities Overview Analysis of Project Locations in Travis County A more detailed hydrogeological desktop study of potential project locations in Travis County Environmental Desktop Study Will identify environmental constraints and outline permitting needs at potential well sites Test-Well Site Selection Timeline Using results from the hydrogeological and environmental analyses, we will advance toward selecting specific test well locations Current draft schedule: complete test well site selection by Fall 2026 Ongoing Interdepartmental Coordination Coordination with City departments will continue throughout Phase 1B kickoff and test well site selection 5 Field Testing and Drilling Overview Field testing will include: Exploratory test wells drilled at two potential locations (Trinity-Hosston aquifer formations) Pump tests, geophysical logging, water quality analysis, and geochemical compatibility studies Coordination with environmental, permitting, and cultural resource requirements Test wells converted into long-term monitoring installations Preliminary Timeline Fall 2026: Test well design, environmental, and permitting tasks Spring 2027: Test well drilling, sample collection, and laboratory analysis Spring 2028: Complete Phase 1B plan report, start Phase 2 ASR pilot well design, and prepare for TCEQ ASR pilot authorization 6 Community Engagement Purpose Raise Awareness: Help secure Austin’s water future and raise awareness about AW water supply projects, including Aquifer Storage and Recovery (ASR) and Brackish Groundwater Desalination Proactive Engagement and Education: Have a proactive community engagement approach that builds community support for water supply strategies Partnerships and Trust: Form strong partnerships with stakeholders who will support Austin Water and advocate with us 7 2026 Community Engagement Strategy Phase 1: Jan – May 2026 Internal & Early Stakeholder Engagement Phase 2: May – Sept 2026 Phase 3: Oct – Dec 2026 Broader Community Outreach Field Testing Milestones • Focus • Focus • Introduce Eastern Travis County water supply project to stakeholders • Broaden community support for Austin’s water supply projects • Share updates on analyses and other initial work • Activities • Engage City of Austin partner • Activities departments • Early communication with elected officials • Outreach to Eastern Travis County groups, environmental orgs, and water providers • Tentative: Fall Open Houses • Outreach to environmental groups, neighborhood associations, large customers, business groups, and regional water entities • Focus • Communicate key project milestones for field testing • Activities • Communicate site prep work such as access roads and drill rig mobilization as needed 8 Future Steps May 2026: Seek Commission and Council approval for additional authorization to support field testing and drilling Establish an ASR and Brackish Technical Advisory Group to review testing plans and results Test groundwater and core samples to better understand existing conditions Use test results to plan safe treatment steps and protect the aquifer Share findings with advisors, community partners and the public 9 Questions and Discussion Austin Water | 4/14/2026