Airport Advisory CommissionNov. 13, 2025

20251112-005 Journey w/AUS Update — original pdf

Backup
Thumbnail of the first page of the PDF
Page 1 of 20 pages

Journey With AUS Latest Updates Airport Advisory Commission November 2025 Lyn Estabrook Deputy Chief – Planning & Development Table of Contents Project Updates ○ West Infill ○ West Gate Expansion ○ Yellow Garage ○ Atrium Infill ○ New Midfield Taxiways 2 Program Overview Journey With AUS projects are developed through a five–phase process: West Infill 4 Design-Build: Gensler/Whiting Turner Latest Updates ○ Drywall, painting, metal panels, flooring and ceilings are nearing completion ○ Internal testing of the Baggage Handling System is ongoing in preparation for Transportation Security Administration (TSA) certification Anticipated Timeline Build: Q1 2024 – Q1 2026 2023 Q1 Q2 Q3 2024 Q1 Q2 Q3 Q4 2025 Q1 Q2 Q3 2026 Q1 Q2 Q3 Q4 Q4 Q4 NEXT PHASE: Enabling Projects: New Arrivals & Departures Hall 5 Baggage Handling System testing Exterior metal panel installation Bathroom tile installation Low voltage cabling New ticket counters West Gate Expansion 7 Designer: Page Contractor: Hensel Phelps Latest Updates ○ Interior finishes ongoing ○ Mechanical and electrical quality assurance and testing starting shortly ○ New passenger boarding bridges installed Anticipated Timeline Build: Q2 2023 – Q1 2026 2023 Q1 Q2 Q3 2024 Q1 Q2 Q3 Q4 2025 Q1 Q2 Q3 2026 Q1 Q2 Q3 Q4 Q4 Q4 NEXT PHASE: Enabling Projects: Concourse B & Tunnel 8 Interior progress photos Parking and Landside: Yellow Garage 10 Designer: PGAL Contractor: Austin Commercial Latest Updates ○ ○ ○ ○ Started construction of ramp entrance on the south side of the building Poured concrete on the first floor of the parking garage Completed drilling 447 of 456 piers Completed 25% of deck pours up to the seventh floor of the parking garage 1111 Anticipated Timeline 2025 Q1 Q2 Q3 Q4 2026 Q1 Q2 Q3 2027 Q1 Q2 Q3 Q4 2028 Q1 Q2 Q3 Q4 Q4 Design: Q3 2024 – Q3 2025 Build: Q1 2025 – Q3 2027 NEXT PHASE: Enabling Projects: Red Garage Removal & New Terminal Roadway, New Arrivals & Departures Hall Garage viewed from the northwest including tower cranes Garage viewed from the south Garage deck with post-tensioned cables Atrium Infill 13 Designer: Corgan Contractor: Whiting-Turner Anticipated Timeline Latest Updates 2025 Q1 Q2 Q3 Q4 2026 Q1 Q2 Q3 2027 Q1 Q2 Q3 Q4 2028 Q1 Q2 Q3 Q4 Q4 ○ ○ Baggage Claim 4 is now reopened because Phase 2 of steel installation and decking is completed Baggage Claim 3 is now closing because Phase 3 of steel installation is in progress 1414 Design: Q2 2024 – Q2 2025 Build: Q2 2025 – Q3 2026 NEXT PHASE: Enabling Projects: New Arrivals & Departures Hall Steel decking Phase 1 complete Steel installation and decking Phase 2 Phase 2 temporary lighting Phase 2 steel progress Equipment and protection New Midfield Taxiways & Maintenance Ramp Expansion 16 Designer: RS&H Contractor: Austin Bridge and Road Anticipated Timeline Build: Q4 2024 – Q2 2027 2024 Q1 Q2 Q3 Q4 2025 Q1 Q2 Q3 2026 Q1 Q2 Q3 Q4 2027 Q1 Q2 Q3 Q4 Q4 Latest Updates ● Completed crushed rock foundation base and began placing hot mix asphalt concrete on Fighter Dr. ● Continued Phase 3 utility removals ● Continued Phase 3 48” reinforced concrete pipe installation 17 NEXT PHASE: Enabling Projects: Concourse B & Tunnel Placement of crushed rock foundation base on Fighter Drive Phase 3 48” reinforced concrete pipe installation Utility removals at taxiway bridge Phase 3 48” reinforced concrete pipe installation Prime Designers and Contractors Contract Type Design-Build Company Gensler/Whiting-Turner Project West Infill West Gate Expansion Atrium Infill New Midfield Taxiways Yellow Garage Design CMAR Design CMAR Design CMAR Design CMAR New Central Utility Plant Design-Build Utility Infrastructure Campus-Wide Concourse B & Tunnel New Arrivals & Departures Hall Design CMAR Design CMAR Design CMAR Page Hensel Phelps Corgan Whiting Turner RS&H Austin Bridge & Road PGAL Austin Commercial JE Dunn/Jacobs HDR Sundt/Archer Western Page/Fentress Hensel-Phelps SOM Austin Commercial Thank You!