20251008-004 - Journey w/ AUS — original pdf
Backup

Journey With AUS Latest Updates Airport Advisory Commission October 2025 Lyn Estabrook Deputy Chief – Planning & Development Table of Contents Project Updates ○ West Infill ○ West Gate Expansion ○ Yellow Garage ○ Atrium Infill ○ New Midfield Taxiways ○ Utility Infrastructure Campus-Wide ○ Concourse B and Tunnel ○ Concourse M 2 Program Overview Journey With AUS projects are developed through a five–phase process: West Infill 4 Design-Build: Gensler/Whiting Turner Latest Updates ○ ○ ○ Interior finishes continue Elevators being installed Internal testing of the Baggage Handling System is ongoing in preparation for Transportation Security Administration (TSA) certification Anticipated Timeline Build: Q1 2024 – Q1 2026 2023 Q1 Q2 Q3 2024 Q1 Q2 Q3 Q4 2025 Q1 Q2 Q3 Q4 2026 Q1 Q2 Q3 Q4 Q4 NEXT PHASE: Enabling Projects: New Arrivals & Departures Hall 5 Baggage Handling System internal testing Exterior metal panel installation Bathroom tile installation Concourse Level ceiling installation New ticket counters West Gate Expansion 7 Designer: Page Contractor: Hensel Phelps Anticipated Timeline Build: Q2 2023 – Q1 2026 2023 Q1 Q2 Q3 2024 Q1 Q2 Q3 Q4 2025 Q1 Q2 Q3 2026 Q1 Q2 Q3 Q4 Q4 Q4 Latest Updates ○ ○ Site visits occurring weekly with Austin Aviation departments Permanent power and air conditioning have been established ○ Mechanical and electrical tests conducted ○ New passenger boarding bridges installed NEXT PHASE: Enabling Projects: Concourse B & Tunnel 8 Recent view inside the West Gate Expansion Parking and Landside: Yellow Garage 10 Designer: PGAL Contractor: Austin Commercial Latest Updates ○ Completed drilling 447 of 456 piers ○ Completed 18% of deck pours up to the fifth floor of the parking garage ○ Started construction of pedestrian bridge connection to Blue Garage 1111 Anticipated Timeline 2025 Q1 Q2 Q3 Q4 2026 Q1 Q2 Q3 2027 Q1 Q2 Q3 Q4 2028 Q1 Q2 Q3 Q4 Q4 Design: Q3 2024 – Q3 2025 Build: Q1 2025 – Q3 2027 NEXT PHASE: Enabling Projects: Red Garage Removal & New Terminal Roadway, New Arrivals & Departures Hall Garage viewed from the northwest including tower cranes Garage viewed from the south Garage deck with post tensioned cables Atrium Infill 13 Designer: Corgan Contractor: Whiting-Turner Anticipated Timeline Latest Updates 2025 Q1 Q2 Q3 Q4 2026 Q1 Q2 Q3 2027 Q1 Q2 Q3 Q4 2028 Q1 Q2 Q3 Q4 Q4 ○ ○ Baggage Claim 2 is reopened after completed steel installation Baggage Claim 4 is temporarily shut down due to steel beam installation ○ Coordination with Art in Public Places regarding art installation 1414 Design: Q2 2024 – Q2 2025 Build: Q2 2025 – Q3 2026 NEXT PHASE: Enabling Projects: New Arrivals & Departures Hall Steel decking installation phase 1 Temporary Clear Channel monitors installed Steel installation phase 1 Steel installation phase 1 New ticket counters New Midfield Taxiways & Maintenance Ramp Expansion 16 Designer: RS&H Contractor: Austin Bridge and Road Latest Updates ○ Construction of new roadways and parking lots ○ Construction of waterline, power, communication and storm utilities ongoing ○ Utility removals and site cleanup ongoing Anticipated Timeline Build: Q4 2024 – Q2 2027 2024 Q1 Q2 Q3 Q4 2025 Q1 Q2 Q3 2026 Q1 Q2 Q3 Q4 2027 Q1 Q2 Q3 Q4 Q4 17 NEXT PHASE: Enabling Projects: Concourse B & Tunnel Manhole form and tie rebar footing Water quality pond gabion mattress and filtration system Maintainers Drive – earthwork and gas line removal Utility Infrastructure Campus-Wide (UICW) Designer: HDR Construction: Sundt/Archer Western 19 Latest Updates ○ Contractor community outreach is being planned for October/November 2025 ○ ○ In November, reviewers will go through the details of the 60% designed stage of the project Subcontractors will be bidding on projects beginning Q4 2025 through Q1 2026 2020 Anticipated Timeline 2025 Q1 Q2 Q3 Q4 2026 Q1 Q2 Q3 2027 Q1 Q2 Q3 Q4 2028 Q1 Q2 Q3 Q4 Q4 Design: Q3 2024 – Q2 2026 Preconstruction: Q1 2025 – Q1 2026 Build: Q4 2025 – Q4 2027 NEXT PHASE: Enabling Projects: Concourse B & Tunnel Concourse B and Tunnel 21 Designer: Page Fentress JV Contractor: Hensel Phelps Anticipated Timeline 2024 2025 2026 2027 2028 2029 2030s Latest Updates– Currently In Scope: ○ New double-loaded midfield concourse consisting of 20+ gates, passenger and tenant amenities, pedestrian moving sidewalks, baggage handling system and utility tunnel cells ○ Apron civil work includes taxi lane relocation, connection to existing taxiways and connecting underground utilities to the new utility corridor for permanent services Design: 2024 – 2026 Build: 2026 – 2030s ○ Design services ongoing NEXT PHASE: Enabling Projects: Integrated Baggage Handling System 2222 Concourse M *Photo depicts shuttle bus operation at Miami International Airport 23 Designer: Page Fentress JV Contractor: Hensel Phelps Latest Updates: ○ Design in progress ○ Adding a remote concourse served with a shuttle. Concourse M will add 4 passenger boarding bridge gates and 2 ground loading gates. The gates will relieve the Barbara Jordan Terminal during the loss of gates to build the Concourse B & Tunnel. 2424 Anticipated Timeline 2024 2025 2026 2027 2028 2029 2030s Design: Q1 2025 – Q4 2026 Build: Q3 2026 – Q4 2027 NEXT PHASE: Enabling Projects: Concourse B & Tunnel Prime Designers and Contractors Contract Type Design-Build Company Gensler/Whiting-Turner Project West Infill West Gate Expansion Atrium Infill New Midfield Taxiways Yellow Garage Design CMAR Design CMAR Design CMAR Design CMAR New Central Utility Plant Design-Build Utility Infrastructure Campus-Wide Concourse B & Tunnel New Arrivals & Departures Hall Design CMAR Design CMAR Design CMAR Page Hensel Phelps Corgan Whiting Turner RS&H Austin Bridge & Road PGAL Austin Commercial JE Dunn/Jacobs HDR Sundt/Archer Western Page/Fentress Hensel-Phelps SOM Austin Commercial Thank You!