20250312-005 FY25 Grant Update — original pdf
Backup

FY25 Grant Update Active Grant GRANT BALANCES $5,555,650 $10,434,350 BIL-ATP $260,374 $3,304,412 AIP $474,176 $2,325,824 AIP $8,105,483 $6,144,517 BIL-ATP $25,260,000 $- BIL-ATP Grant #67 Cargo East Grant #71 BHS -West Infill Design and Construction Grant #73 Aedp Airfield Infrastructure Design Grant #74 Aedp Airfield Infrastructure Design Grant #75 Atrium Infill Construction Drawn to Date (Active) Remaining Balance to Drawdown $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $- 1 Pending Grant Grant #76 Concourse B & Tunnel Design (BIL- ATP) $33,270,000 Grant #77 CUP Design (BIL- AIG) $4,880,000 Grant #78 AEDP Airfld Infras Construction (BIL-AIG) $17,000,000 Grant #79 Maintenance Ramp/Apron Design (BIL-AIG) $2,500,000 ---------------- $57,650,000 TOTAL Pending 2 BIL By Year AIG Earmarks ATP Announced Year 1- 4 $76,090,057 $87,780,000 ATP Awarded $55,500,000 **Once pending grant 76 is obligated ATP Awarded will reflect additional $33,270,000. 3