Item 11 - AEDP Project Presentation — original pdf
Backup
Airport Expansion Development Program Airfield Infrastructure Construction Manager at Risk (CMR) Solicitation No. CLMA046 Airport Expansion Development Program (AEDP)- Major Elements • Meet the air service needs of Central Texas Airfield and Utility Infrastructure 10+ Gate Midfield Concourse Barbara Jordan Terminal Expansion • Meet the needs of airlines serving the airport and region • Maintain excellent passenger experience • Provide flexible expansion for dynamic airline growth 1 Bridge to Light Rail Station Tunnel Expandable for Future Growth Barbara Jordan Terminal New Terminal Curb and Access Road Source: City of Austin Department of Aviation AEDP Anticipated Schedule 2 Bridge, New Curb and Roadway AEDP Anticipated Schedule 3 AEDP Airfield Infrastructure Project Midfield Taxiways The AEDP Airfield Infrastructure Project establishes new Airfield Design Group 5 midfield taxiways to provide increased connectivity between the east and west sides of the airfield and future concourses • Pre-construction services/enabling • Site preparations, building/infrastructure demolition • Airfield utility infrastructure • Taxiway bridges at Emma Browning Ave • Airfield Design Group 5 (ADG V) midfield taxiways AEDP Airfield Infrastructure E R U T U F 4 Source : Evaluation of Mid-Field Taxiway Realignment, KSA 2020 AEDP Airfield Infrastructure Overview Schedule Phase Design Consultant Solicitation [Awarded] CMAR Solicitation CLMA046 Design Phase Permitting / GMP Development Phase Construction Phase Start 1/22 3/22 9/22 1/24 10/24 Finish 8/22 12/22 12/23 9/24 10/26 5 Preconstruction Services • Value engineering • Cost estimating • Construction Scheduling • Phasing Plans • Constructability review • Safety input and review • Estimating • DBE outreach • GMP Development 6 Initial Construction Scope • Establish temporary construction including, office, utilities, haul roads, concrete production center. • Demolish: building structures, abandoned foundations, fencing, roadway, airfield pavement and abandoned utilities within the project limits of construction. 7 Airfield Scope • Prepare subgrade, base materials, • Construct concrete taxiway pavement and asphalt shoulder pavement • Pavement Marking • Construct aircraft rated taxiway bridges over Emma Browning • Construct enhanced security fencing, security checkpoint with access control and utilities • Reconfigure Emma Browning and construct airport service roads 8 Electrical Scope • Install airfield taxiway edge and centerline lighting fixtures and circuits, airfield signage, electrical vault improvements, install new regulators, S1 cut outs, control cabling and update airfield lighting control system • Coordinate with Austin Energy modifications to primary power lines • Modify secondary service to existing locations as needed (ramp lighting, water quality ponds) 9 Utility Scope • Construct storm water drainage, piping networks, open channel, and aircraft rated storm structures, and implement storm water quality controls. • Construct new water and sanitary sewer utilities in accordance with Austin Water development criteria • Coordinate with utility providers for demolition/ relocation/ or upgrades including water, sewer, gas, fiber lines 10 DBE Participation • Preconstruction Services • DBE Participation 11.12% • CMR DBE Outreach Coordinator • GMP 1 Site Preparation, Demolition, Utility Relocation • DBE Participation based on GMP scope • GMP 2 Taxiway, Bridge, Roadway • DBE Participation based on GMP scope 11 Next Steps AEDP Airfield Infrastructure • Council Award & Contract Execution • CMR Solicitation No. CLMA046 165M • RCA scheduled for September 1, 2022 Council • AAC Project Status Updates • Design consultant approval June 16, 2022 • Contract negotiation and execution July/August 2022 • Preliminary Engineering Report expected Q1 2023 12 QUESTIONS 13 AUS Overall Development - EA A-1 Relocation of Midfield Taxiways 14